القصور في السيطرة الزمنية على تنفيذ الأعمال الأنشائية (مشروع جسر القاهرة-أور)(حالة دراسية)

Abstract

A construction industry has a special characters, differs from the other industries; becomes of its huge size, continuous build up and the dependency of the others projects on it ( i.e projects builds needs constructions) and it can be argued that the construction industry, an industry productive To any successful project implementation it needed to consider all the integration between project phases.Any defect in the application of the project time schedule will tend to extra costs, delay fines and this will cause a loss of profit national economy because of the delay in the project commissioning time schedule and taking advantage of this project.The aims of this research are to study and analyze the defect in the time control system for projects construction. To get the objectives of the search, the researchers use to study previous literatures rummages deals with project time scheduling and control. In this study Cairo-UR Bridge project was selected for monitoring and follow up.We collecting and analysis the data to determine the deviation in the project time schedule. In this study we discussed a number of solutions to decline this deviation by adoption of scientific methods after the application of these solutions this deviation was decline but not completely disappear for many reasons, we explained it during this study.