@Article{, title={Estimating Electricity Generation from Wind Power by V82 at ThiQar – Iraq تقدير الطاقة الكهربائية المنتجة من طاقة الرياح بواسطة في ذي قار-العراق V82}, author={Auday H. Shaban عدي حاتم شعبان}, journal={Ibn Al-Haitham Journal For Pure and Applied Sciences مجلة ابن الهيثم للعلوم الصرفة والتطبيقية}, volume={29}, number={2}, pages={60-69}, year={2016}, abstract={One of the most demanded studies is wind turbine site assessment. It is difficult to build asimulation program because of the many variables that affect the wind speed and direction.The procedure of this research depend on two approaches, the Wind Atlas Analysis model andthe Inverse Distance Wait interpolation. These procedures give the estimated annual energyproduction for each turbine (V82) with 82m blades diameter at 70m hub heights. The outputat this location for each turbine is about (4.3 GWh). The studied area is about 20x20km2 andcould be plant at least 600 turbine and have about 2500 GWh of annual energy production.

واحدة من اكثر الدراسات المطلوبة هي انشاء محطات توربينات الرياح . ان بناء برنامج المحاكاة يعد من البرامجالصعبة نظرا لكثرة المتغيرات التي تؤثر في سرعة واتجاه الرياح. ان خطوات هذا البحث تعتمد على طريقتين هي تحليلهذه الخطوات سوف تحسب الانتاج السنوي للطاقة الكهربائية لتوربين .IDW نموذج اطلس الرياح وطريقة استيقاء.(4.3GWh) 70 ). ان الانتاج السنوي لكل توربين في هذه المنطقة بحدود m) 82 ) وبارتفاع m) وبقطر رئيسي (V82)2500 ) كانتاج سنوي. GWh) 20 ويمكن وضع 600 توربين على الاقل التي تنتج *20 Km ان المنطقة المدروسة بحدود} }