@Article{, title={Analysis Sequencing of Manufacturing Processes of the}, author={Zuher Hassan AbdullahDr.Sawsan S.Abd-Ali}, journal={Iraqi journal of mechanical and material engineering المجلة العراقية للهندسة الميكانيكية وهندسة المواد}, volume={first conf./ eng. coll.}, number={A}, pages={52-69}, year={2009}, abstract={The study immediately aims to prepare technical path to manufacture threeindustrial products because of its unavailable in local markets where two of its use fortranslating of motion in the lathe machine and one use for translating of motion in aninternal combustion engine where introduce the best percentage loading time(exploit)on the productivity machine and an addition to calculate of waiting time on it. Thisresearch deals manufacturing that products in the sequencing workshop includes threeproductivity machine are (lathe, milling, grinding) where for every machine oneoperator with calculates operating time to those products depending upon scientificrules at any stage of operations machine to arrive the best sequencing which is givingthe total of shorter time to executive an industrial sequencing operations upon productivity machine then those products are testing then dealing by heat treatment andcooling with special rates to add limited specifications. An effects appear that (CAB) isan optimal sequencing which finishing productivity cycle with time(129)minutes andthe waiting time(0,33,72) minutes upon productivity machine.

} }