TY - JOUR ID - TI - Estimating Optimum Period of Time Between Maintenances by Using Monte Carlo Simulation Method تحديد الفترة الزمنية الأمثل بين صيانة وصيانة أخرى عن طريق أسلوب مونت كارلو للمحاكاة AU - Faek Lateef Saleh فائق لطيف صالح PY - 2012 VL - 5 IS - 2 SP - 226 EP - 240 JO - Anbar Journal of Engineering Sciences مجلة الأنبار للعلوم الهندسية SN - 19979428 27067440 AB - This work aims to increase the availability of steam generation plant through modifying boiler maintenance plan by determining the optimum period of time between maintenances to achieve maximum availability via simulation approach.Applying simulation approach is an attempt to determine the optimum period of time between schedule maintenances to achieve maximum boiler availability. Therefore, PC program in visual basic language is designed as a tool to the implementation of availability simulation approach. It notes that the boiler availability is increased by (6.9%) in changing the optimum time between scheduled maintenances and inspection to be seven months rather than one year

يهدف هذا البحث إلى زيادة توافرية محطة توليد البخار من خلال تعديل خطة صيانة المرجل من خلال تحديد الفترة الزمنية الأمثل بين صيانة وصيانة لتحقيق أكبر توافرية ممكنة عن طريق أسلوب المحاكاة. أن تطبيق أسلوب المحاكاة هو محاولة لتحديد الفترة الزمنية الأمثل بين الصيانات ضمن الجدول الزمني لها لتحقيق أقصى قدر من توافرية للمرجل. لذلك، تم تصميم برنامج كمبيوتر في اللغة البصرية الأساسية (الفيجوال بيسك) كأداة لتنفيذ أسلوب محاكاة التوافرية للمرجل. لقد تم ملاحظة زيادة توافرية المرجل بنسبة (6.9 ٪) عند تغيير الوقت الأمثل بين الصيانات والتفتيش وليصبح سبعة أشهر بدلاً من سنة واحدة. ER -