@Article{, title={Scheduling Critical Activities on Multi-objectives Stochastic Projects}, author={Saad Mohsin Salman}, journal={Al-Nahrain Journal of Science مجلة النهرين للعلوم}, volume={16}, number={3}, pages={246-251}, year={2013}, abstract={In this paper, we consider the problem of stochastic multi-objectives project when some or all activities are interrupted and are on different allocations (i.e. are independent on each other). Some theories concerning multi-objectives problems are presented, and a new objective function is constructed). An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities, to obtain the corresponding critical cost index. A simple tested problem is presented.

تناول هذا البحث المشاريع التصادفية ذات الأهداف المتعددة عندما تكون هناك بعض أو كل الأنشطة ذات توقفات مفاجئه وفي أماكن مختلفة (بمعنى لاتعتمد على بعضها في التنفيذ) وقد تم تناولنا بعظاً من الجانب النظري لهذه المسائل. حيث تم بناء أسلوب لجدولة الأنشطة الحرجة من خلال تكوين بعض العلاقات المتبنية على كلف التأخير للمشروع بسبب العطلات المفاجئه للحصول على المؤشر الحرج لكل نشاط. وأخيراً تم عرض مثال بسيط لتوضيح المشكلة.} }