Found: 4 resources
Listing 1 - 4 of 4
Sort by
Examining Rebalancing Considers of the Mixed-Model Assembly Line Type-II for the Straight and U-shaped Layout Using the Taguchi Method
Engineering and Technology Journal, 2021, Volume 39, Issue 2 part (A) Engineering, Pages 280-294
A Novel Recursive Heuristic Algorithm for Straight and UShaped Assembly Line Balancing with Fuzzy Processing Time
Engineering and Technology Journal, 2021, Volume 39, Issue 3 part (A) Engineering, Pages 477-487
Developing a Heuristic Algorithm to Solve Uncertainty Problem of Resource Allocation in a Software Project Scheduling
Iraqi Journal of Science, 2022, Volume 63, Issue 5, Pages 2211-2229
Developing Multistage Heuristic Algorithm To Minimize Idle Time And Makespan In Job Shop Scheduling
Engineering and Technology Journal, 2010, Volume 28, Issue 14, Pages 4789-4805
Listing 1 - 4 of 4
Sort by