AHPتقييم الشركات الانشائية في العراق من ناحية اعداد البرامج الزمنية للمشاريع الانشائية باعتماد تقنية

Abstract

The aim of this study is to evaluation the process planning and time scheduling for the construction projectes in construction comanies by using AHP technique. This is done throughout determination of the used criterion to determination to selecte the optimum construction company from aspect of preparing time schedules. In order to satisfied this aim, adata collection have been made from some literatures about Analytic Hierachy and time scheduling and the field study represented by interview and aquestionnaire. The results of data analysis of samples show that the criterions contract documents, the executing agency management, Natur of the project, and business planning and follow- up.Have obtained a great portion of relative importance comparatively with another criterions between companies, and the criterion contract documents and followed the excuting agency management are more important than another criterions of the companies. The company of Al – Mansour had obtain a great portion of relative importance comparatively with another companies. Finally it has been resulted to set of conclusions and recommendation for different aspects of thissubject, such as, reliance on personal experience and sometimes on historical data to estimate the time periods for events without resorting to an effective distribution of resources at the event and determine the productivity standard for various work teams.And the need to the management manners qualified essential to evaluation construction companies in different aspects and specially in the filed of time scheduling.