مقترح بناء نظام اداري لاختيار اسلوب التعاقد المناسب لاسلوب المقاول العام في قطاع التشييد

Abstract

Among the most important problems which faced us is the wide use of old approach , particularly the traditional approach ( general contractor ) and the bill of quantity contract which works according to the general conditions of civil engineering works contracts sponsored by FIDIC and ministry of planning , so It became necessary to look for certain contract rules to be used as a substitute suited all conditions and cases after concluding lessons from the local experiments in rebuilding issues .This research aims at analyzing the subject of time and cost factor taking in consideration the effect all the effective factors which leads to increase the cost and time .A scientific methodology was followed in both theoretical and practical phases of the study . The study concentrated on a detailed statistical analysis of the study was incorporated using questionnaire and interview method to evaluate the effective factors directly or indirectly on contract methodAt the end certain conclusions and recommendations were drawn as developing managerial system for selecting satisfy contract method