research centers


Search results: Found 6

Listing 1 - 6 of 6
Sort by

Article
Development of an Integrated Construction Management System for Building Estimation

Authors: Sawsan Rasheed Mohammed --- Ehab Fadhil Mohammed Ali
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2012 Volume: 18 Issue: 9 Pages: 999-1013
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and duration of tasks, then exported to MS Project and MS Excel. The system was developed by using Visual Basic and ActiveX automation technology for combining the above software. The system, also, can calculate quantities of materials. The system includes digitizer (on-screen takeoff) calculates the lengths and areas of the drawings to which the form of an image and scanned. The integrated system has been applied to case study, a storages building for hospital 260 beds. The results proved the effectiveness of the system for the conversion of information from the graphical form dwg to numerical formulas xlcx / xlc and mpp can be handled easily pleased and software are covered.

ا تزال إدارة المشاريع تعتمد التبادل اليدوي للمعلومات و بالاستناد على الوثائق الورقية. حيث يتم رسم الخرائط و المخططات التصميمية بمساعدة الحاسوب ,CAD لكن البيانات المطلوب ادخالها لبرامجيات إدارة المشاريع لا يمكن استخراجها مباشرة من CAD بل يجب ادخالها يدويا من قبل المستخدم. ان عملية أخذ و تجميع المعلومات من المخططات التصميمة و ادخالها في برامجيات ادارة المشاريع تحتاج الى جهد و وقت مع احتمال حدوث اخطاء في نقل و ادخال المعلومات. هذا البحث يقدم نظاما حاسوبيا متكاملا لمشاريع المباني حيث يقوم باستخلاص و استيراد الكميات عن طريق ترجمة مخططات AutoCAD مع قاعدة بيانات MS Access بالكلف و الانتاجيات لحساب الاسعار و المدد الزمنية للفعاليات ثم تصديرها الى برامج MS Project و MS Excel. تم تطوير النظام بأستخدام Visual Basic و تقنية أتمتة ActiveX لربط البرامج اعلاه. بالاضافة الى حساب كميات المواد , يتضمن النظام Digitizerلحساب الاطوال و المساحات للمخططات التي تكون بصيغة صورية. تم تطبيق النظام المتكامل على دراسة حالة لبناية مخازن لمستشفى 260 سرير. اثبتت النتائج فعالية النظام في تحويل المعلومات من صيغتها الرسومية dwg الى صيغ عددية xlcx / xlc , mpp يمكن التعامل معها بسهولة و يسر بالبرامجيات المشمولة بها.


Article
Computing Cutting Time in Turning Operation Based on AutoCAD Drawings
حساب زمن القطع في عملية الخراطة بالاعتماد على رسومات الاوتوكاد

Author: Dr. May George A. Kassir
Journal: AL-NAHRAIN JOURNAL FOR ENGINEERING SCIENCES مجلة النهرين للعلوم الهندسية ISSN: 25219154 / eISSN 25219162 Year: 2008 Volume: 11 Issue: 2 Pages: 243-250
Publisher: Al-Nahrain University جامعة النهرين

Loading...
Loading...
Abstract

In view of importance the cutting time, it is considered one of the most important factors in different machining processes where it affects production time, cycle time, and product cost consequently. This research aims to build up a system for computing cutting time in turning operations from AutoCAD drawings. The proposed system has been built using Visual Basic programming language and interfacing it with AutoCAD by Visual Basic for Application (VBA) Technique. The system is able to compute cutting time from the drawings according to the color of each solid entity; these colors were defined previously in the system. They are related to the type of turning operation (external, internal, and facing turning operations) as well as the rough and finish machining operations. The system was examined with two models, and it was accurate and efficient. It is possible consideration the proposed system step toward the integration between CAPP/CAM systems.

بالنظر الى اهمية زمن القطع في عمليات التشغيل المختلفة، يمكن اعتباره من العوامل المهمة التي تؤثر في زمن الانتاج وزمن دورة الانتاج وبالنتيجة على كلفة المنتج. يهدف البحث الحالي الى بناء نظام لحساب زمن القطع في عمليات الخراطة من خلال قراءة ملفات الرسم لبرنامج الأوتوكاد. بني هذا النظام باستخدام لغة البرمجة فيجوال بيسك ومن ثم ربطها بنظام الأوتوكاد بواسطة تقنية فجوال بيسك للتطبيقات. ان البرنامج المعد يقوم باحتساب زمن القطع من خلال استخلاص البيانات من عناصر الرسم المجسمة و اعتمادا على الوان تلك العناصر. هذه الألوان تم تعريفها مسبقا لدى النظام، بحيث يمثل كل لون منها عملية خراطة معينة (خراطة خارجية وخراطة داخلية وخراطة و جهية) بالاضافة إلى عمليات التشغيل الخشن و الناعم. اختبر النظام بنموذجين، وأ ظهرت النتائج دقة النظام و كفائته ومن الممكن اعتبار النظام خطوة نحو التكامل بين انظمة التخطيط والتصنيع.


Article
Gender effect on coronary angiographic findings in evaluation of chest pain
تأثير إختلاف الجنس على نتائج التصوير الوعائي التاجي في تقييم ألم الصدر

Authors: Majid A. Abdulmajeed ماجد عبد المنعم عبد المجيد --- Ismail D. Saeed اسماعيل داؤد سعيد
Journal: Annals of the College of Medicine Mosul مجلة طب الموصل ISSN: 00271446 23096217 Year: 2013 Volume: 39 Issue: 2 Pages: 147-153
Publisher: Mosul University جامعة الموصل

Loading...
Loading...
Abstract

ABSTRACTObjective: The primary objective of this study is to evaluate the effect of gender on angiographic findings in referred patients with chest pain and to study the gender-related differences in risk factors in patients with coronary artery disease as a secondary goal.Design: A retrospective, clinical study of 230 patients with chest pain.Setting: Mosul Heart Center – Ibn Sina Teaching Hospital. Patients and methods: From Sept. 1st 2011 to Jan. 31st 2012, a total of 230 (100 female, 130 male) patients with chest pain who underwent diagnostic coronary angiography in Mosul Heart Center – Ibn Sina Teaching Hospital were studied retrospectively. Both the whole female population and post-menopausal females as a separate group was compared with a whole male population depending on the presence or absence of coronary artery disease identified by coronary angiography. The main outcome of cardiovascular risk factors: hypertension, diabetes mellitus, hypercholesterolemia, smoking and family history of coronary heart disease were also studied in relation to the gender. Results: The correlation between the whole female and male populations with positive coronary angiography: 59% (59/100) vs. 89.2% (116/130) respectively, was statistically significant (p< 0.001). The correlation between post-menopausal women and whole male population with positive coronary angiography: 67.14% (47/70) vs. 89.2% (116/130) was also statistically significant (p< 0.05). The mean age (yr) ± SD of whole female population with positive coronary angiography was (57.48± 8.8), while it was (53.34± 9.0) for male population with positive coronary angiographic findings. The correlation was statistically significant (p<0.01). The mean age (yr) ± SD of post-menopausal females with positive results was (59:14±7.04). This was also statistically significant in comparison with main age of whole male population (p<0.01). Hypertension and family history of ischemic heart disease were more prevalent in females than in males with coronary heart disease, 30 (50.8%) and 41(69.4%) versus 44(37.9%) and 60 (51.7%) respectively, this was statistically significant (p< 0.05).Conclusions: Females with chest pain who were referred for diagnostic coronary angiography had significantly more negative angiography test than males, and the mean age of females with positive test is significantly higher than males. Hypertension and family history of ischemic heart disease were more prevalent in females with coronary artery disease than in males.Keywords: Coronary artery disease (CAD), coronary angiography, gender effect on coronary angiography.

الخلاصةالأهداف: الأهداف الرئيسية من هذه الدراسة هي: تقييم تأثير إختلاف الجنس على نتائج التصوير الوعائي التاجي في المرضى الذين أحيلوا بسبب ألم الصدر. وكذلك لدراسة إختلاف في نسبة عوامل الخطورة بين الجنسين للإصابة بمرض القلب الوعائي. التصميم: دراسة سريرية، راجعة لعينة شملت 230 مريضاّ يعانون من ألم الصدر.الموقع: مركز الموصل للقلب في مستشفى ابن سينا التعليمي.المرضى والطرق: خلال الفترة من 1 أيلول 2011 إلى 31 كانون الثاني 2012، تم دراسة 230 مريضا (100 إناث و 130 ذكور) يعانون من ألم في الصدر يشتبه إصابتهم بمرض الشريان التاجي أخضعوا للمرة الأولى للتصوير الوعائي التاجي التشخيصي في مركز الموصل للقلب في م. ابن سينا التعليمي. تمت مقارنة مجموعة الإناث الكلي مع مجموعة الذكور وكذلك مقارنة مجموعة النساء ما بعد سن اليأس مع مجموعة الرجال اعتماداّ على وجود أو عدم وجود مرض الشريان التاجي الذي يحدده تصوير الأوعية التاجية. وكذلك تم أيضا دراسة علاقة عوامل الخطورة القلبية الوعائية (إرتفاع ضغط الدم وداء السكري وإرتفاع الكولسترول والتدخين والتاريخ العائلي لأمراض الشرايين التاجية) بنوع الجنس.النتائج: من بين 100 مريضة من الإناث تبين وجود مرض الشريان التاجي في 59/100 (59%) منهن، أما نسبة وجود المرض في النساء ما بعد سن اليأس فكان 47/70 (67,14%) في حين أن ما بين 130 مريضا من الذكور، تبين وجود المرض في 116/130 (89,2%) منهم اعتماداً على التصوير الوعائي التاجي. وكان الإرتباط بين جنس المريض ومرض الشريان التاجي عند مقارنة العدد الكلي للمصابين من الإناث والذكور ذو دلالة إحصائية هامة (P <0.001) وكذلك كان الحال عند مقارنة مجموعة النساء في سن ما بعد سن اليأس مع مجموعة الذكور (P <0.05) . كان متوسط عمر مجموعة الإناث الكلي ذو النتائج الإيجابية للتصوير الوعائي التاجي هو 57,48 ± (8,8) سنة وكان ذو دلالة إحصائية هامة ((P <0.01 عند المقارنة مع متوسط عمر الذكور ذو النتائج الإيجابية (53,34±9,0) سنة. أما متوسط عمر الإناث ذو النتائج الايجابية في ما بعد سن اليأس (59:14±7,04) سنة وكان ايضاّ ذو دلالة إحصائية هامة بالمقارنة مع معدل عمر الذكور ذو النتائج الايجابية ( .(P <0.01أما بالنسبة لإرتفاع ضغط الدم والتاريخ العائلي لأمراض القلب التاجية فكان أكثر انتشارا في الإناث: 30 (50,8٪) و 41 (69,4٪) مقارنة بالذكور: 44 (37,9٪) و 60 (51,7٪) على التوالي و ذو دلالة إحصائية هامة (p = <0.05).الاستنتاجات: تبين بان نتائج إختبار التصوير الوعائي التاجي لمرضى ألم الصدر كانت أكثر سلبية (عدم وجود) في الإناث مقارنة بالذكور، ومتوسط عمر الإناث ذو إختبار إيجابي (وجود) هو أكبر من متوسط عمر الذكور. كما أن إرتفاع ضغط الدم والتاريخ العائلي لمرض الشرايين التاجية كان أكثر أهمية وإنتشارا في الإناث مقارنة بالذكور.


Article
Die Design of Flexible Multi-Point Forming Process
تصميم وتنفيذ قالب مرن لعملية التشكيل المتعدد النقاط

Authors: Khalida kadhim Mansor خالدة كاظم منصور --- Karem MohsenYounis كريم محسن يونس --- Tahseen Fadhel Abaas تحسين فاضل عباس
Journal: Al-Khwarizmi Engineering Journal مجلة الخوارزمي الهندسية ISSN: 18181171 23120789 Year: 2018 Volume: 14 Issue: 2 Pages: 22-29
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Multi-point forming (MPF) is an advanced flexible manufacture technology, and the technology results from the idea that the whole die is separated into small punches that can be adjusted height. This idea is applied to the traditional rigid blank-holder, so flexible blank-holder (FBH) idea can be obtained. In this work, the performance of a multi-point die is investigated with pins in square matrix and suitable blank holder. Each pin in the punch holder can be a significant moved according to the die high and at different load that applied with spring with respect to spring stiffness. The results shows the reduction in setting time with respect to traditional single point incremental forming process that lead to (90%). and also show during the forming process, the deformation of the interpolator can induce a shape error in the formed work-piece and the blank holder can reduce/eliminate dimples that sometimes arise in the work-piece. The minimum force applied using multi-point die is 28.556KN, while the load when complete the forming process is 30.8KN that caused displacement of die to 32.8mm.

تعد عملية التشكيل متعدد النقاط من عميات التصنيع المرنة المتقدمة حيث ان هذه التقنية ناتجة من فكرة تقسيم القالب الى عدد من العدد الصغيرة والتي تترتب بصورة مصفوفة متناسقة ويتم التحكم بابعاد كل عدة حسب موقعها في المصفوفة وصولا الى الشكل المطلوب. حيث تم اضافة ماسك للعينة اثناء عملية التشكيل حيث تم تصميمه وتصنيعه بحيث يناسب متغيرات العملية الحالية.في هذا البحث تم مناقشة اداء هذه العدد المرتبة بشكل مصفوفة مربعة حيث تم تسليط القوة بالاعتماد على ميكانيكية السبرنك التي تقوم بتسليط القوة بالاعتماد على جساءة السبرنك على وفق الازاحة المطلوبة وبالاعتماد على موقع العدة نسبة للقالب المصمم والشكل المطلوب انتاجه حيث تم التغلب على بعض محددات العملية عن طريق تقليل الزمن اللازم للاعداد بنسبة (90%) نسبة الى عملية التشكيل النقطي التزايدي بالاضافة الى تقليل الخطا الحاصل بالابعاد النهائية للمنتج وتقليل الاثر الناتج من ضغط العدة على النموذج. ان القوة المحسوبة التي يسلطها القالب عند بدء التشكيل هي (28.556 كيلونيوتن) بينما القوة الناتجة من عملية التشكيل العملية عند تشكيل النموذج بعمق (32.8ملم) هي (30.8كيلونيوتن).


Article
Feed-Interval Scallop Height Estimation Using Multi-axis CNC Milling Machine
حســــــاب قيمة الارتفـــــاع التــــــموجي باتــــــجاه التغـــــذية باستخدام مــــكـــــــائن التــــحكم الرقمــــي المتعـــــددة المحــــاور

Loading...
Loading...
Abstract

This research presents a mathematical model of feed-interval scallop height, where in a machined surface there are two types of scallop height, the pick(path)-interval scallop and the feed-interval scallop. The pick-interval scallop is generated by the finite pick offset between the successive cutting paths, while the feed-interval scallop is generated by the finite increment between the successive tooth feeds. New model that describes and predicts the geometric generating mechanisms of the feed-interval scallop height have been derived using torus cutter which is commonly used in multi-axis milling machine. The machining parameters (effective tool cutter radius, feed per tooth and the magnitude of tool axis inclination angles) have been considered in theoretical and experimental work to study the effect of these parameters on this type of scallop height. From theoretical and experimental work it was found that at high-speed machining, the feed-interval scallop is more important to the surface roughness than the path-interval scallop, and the feed-interval scallop is very sensitive to the tool-axis inclination angle. The feed-interval scallop height decreased sharply and quickly within a few degrees of the tool-axis inclination to the normal workpiece surface. In general, an inclination angle equal to is good enough for all tool diameters used in the present work, namely (6,8,10 12 mm).

في هذا البحث تم اشتقاق المعادلات لبناء موديل رياضيَ يمكن من خلاله حساب قيمة الارتفاع التموجي باتجاه التغذية، حيث أن هناك نوعان من الارتفاعات التموجية، الأول يسمى الارتفاع التموجي باتجاه مسار العدة والأخر يسمى الارتفاع التموجي باتجاه تغذية العدة، ويتكون الأول نتيجة الحركة لعدة القطع بين موقعين متتاليين باتجاه مسار العدة أما الثاني فيتكون نتيجة الحركة لعدة القطع ما بين موقعين متتاليين باتجاه التغذية، تم وصف هذا النوع من الارتفاعات باستخدام العدة (Torus) والذي يستخدم بصورة شائعة في مكائن التفريز المتعددة المحاور، كذلك تم دراسة تأثير بعض من متغيرات القطع على قيمة هذا النوع من الارتفاعات مثل ( نصف القطر الفعال للعدة، نسبة التغذية لكل سن قاطع وقيمة زاوية ميلان العدة) حيث تم تغيير قيم تلك المتغيرات نظريا وعملياً لمعرفة تأثيرها على قيمة الارتفاع التموجي باتجاه التغذية. تبين من خلال الجانب النظري والجانب العملي للبحث الحالي وعند قيم سرع قطع عالية، أن قيمة الارتفاع التموجي باتجاه التغذية أهم من قيمة الارتفاع التموجي باتجاه مسار العدة نسبة إلى الخشونة السطحية للسطح المشغل. كذلك وجد أن قيمة الارتفاع التموجي باتجاه التغذية تتأثر بصورة كبيرة بقيمة زاوية ميلان العدة، حيث لوحظ أن قيمة هذا النوع من الارتفاعات تقل بصورة واضحة وسريعة نسبة إلى التغير البسيط في قيمة زاوية الميلان، وبصورة عامة وجد من خلال البحث أن قيمة زاوية الميلان والمساوية إلى هي أفضل قيمة يمكن من خلالها الحصول على اقل قيمة للارتفاع التموجي باتجاه التغذية لكل أقطار العدة المستخدمة خلال البحث الحالي.


Article
PROJECT MANAGEMENT OF BALAD`S MAJOR SEWERAGE SYSTEM BY USING THE GOAL PROGRAMMING METHOD
ادارة مشروع مجاري بلد الكبير باستخدام أسلوب البرمجة بالأهداف

Authors: أمجد عباس عبد الرحيم البلداوي --- وقاص سعد خلف
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2016 Volume: 22 Issue: 93 Pages: 162-194
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve these projects in the determined time , added cost and technical specifications although the majority of these projects have been managed with predetermined time and financial resources limits , they still need some improved strategies and more careful calculation in their time and cost management. This project was chosen for the following reasons , The first reason is that the project is currently stopped, because of the security and financial circumstances in salahulddin province in particular .this is a great manage time and cost when the work is resumed , and the second reason is during the progress of the project, the until it was stopped, the completion percentage was behind what it was planned originally . this highlights the need to study how to avoid these delays in future using a scientific and logical method , and the third reason that the project has many variables that affect the progress, which are of great importance for scientific and mathematical methods . To achieve this purpose the project was studied using modern scientific and mathematical methods , which are the curved part method (CPM) for project's real and accelerated timing the Primavera V6 software and the AutoCAD 2015 software . the goal is to benefit from these methods and software to establish a new work schedule for the project . Due to the project's various and clashed (in sometimes) objectives that are have to be accomplished in a limited time , it is very important to be careful and accurate with making the right time . It was highly needed to use an efficient mathematical model that work with all these variables in the limited time allowed and according to their priorities . This mathematical method is called the Goal Programming for multi-objective mathematical models

يعد مشروع مجاري بلد الكبير احد اكبر المشاريع التي هي قيد الانجاز في محافظة صلاح الدين ضمن خطة تنمية الاقاليم للعام 2013 , فهو مشروع ضخم يسير باتجاهين الاول مد الشبكات و الثاني انشاء محطات الرفع وللمحورين ( الثقيل والمطري ) , والتي تسعى مديرية مجاري صلاح الدين تنفيذه لخدمة اربعة احياء في قضاء بلد . إن من أهم التحديات التي تعيق ادارة المشاريع اليوم هي التأكد من انجاز تلك المشاريع في وقتها المحدد , وكذلك الكلفة و المعاير الفنية المحدد ايضا , وعلى الرغم خضوع اغلب هذه المشاريع لقيود محددة ( محددات ) تتعلق بالوقت واخرى تتعلق بالموارد المالية المخصصة للمشروع لذا فأن موضوع الوقت والكلفة في ادارة اي مشروع يحتاج الى حسابات دقيقة لهما . وقد تم اختيار هذا المشروع للدراسة لعدة اسباب مهمة , السبب الاول : إن المشروع متوقف حاليا بسبب الظروف الامنية والمادية في صلاح الدين على وجه الخصوص , وهذا دافع كبير لدراسة كيفية التعامل مع وقت وكلفة انجازه في حال استأنف العمل به , والسبب ثانيا اثناء تنفيذ المشروع كانت هنالك انحرافات عن نسب الانجاز الفعلي , مما يدفع الى توفير دراسة وبأسلوب علمي ومنطقي لتجاوز هذه الانحرافات في المستقبل , اما السبب الثالث فهو إن المشروع يحتوي على الكثير من الانشطة مما يعطي اهمية كبيرة للأساليب العلمية والرياضية التي سوف تؤثر بشكل كبير في تنفيذ المشروع بأسلوب مدروس . لذا تمت دراسة المشروع من جديد وفقا لأساليب علمية ورياضية حديثة , اختيار اسلوب المسار الحرج (CPM) بوصفه احد اساليب الادارة العلمية للمشاريع لإيجاد وقت انجاز المشروع الطبيعي والتعجيلي , وبما ان لإدارة هذا المشروع اهداف متعددة تسعى الى تحقيقها في مدة زمنية محددة , الامر الذي يتطلب الكثير من الدقة في الوصول للقرارات المناسبة , فكان من الاجدر استخدام اسلوب رياضي كفوء لبناء نموذج رياضي متعدد الاهداف يعمل مع جمــيع هذه المتغـيرات في المدة الزمنية المحددة وبحــسب اولوياتهــا وتسمى البرمجة الهدفية ( (Goal Programming , وكذلك تم استخدام بعض البرامج الجاهزة لرسم الشبكة كبرنامج (Primavera V6 ) والبرنامج الهندسي المعروف (AUTO CAD 2015 ) , وبرنامج (Win QSB) لحل الأنموذج متعدد الاهداف , ومحاولة الافادة من مميزات هذه البرامج في جدولة المشروع .

Listing 1 - 6 of 6
Sort by
Narrow your search

Resource type

article (6)


Language

Arabic and English (6)


Year
From To Submit

2018 (1)

2016 (1)

2013 (1)

2012 (2)

2008 (1)