Article
Affordable Housing and Ways to Achieve Lower Cost and Less Period of Time
الاسكان الاقتصادي وطرق الحصول على اوطأ كلفه واقل مدة زمنيه

Authors: Sawsan Rasheed Mohammed --- ghayath hamza
Journal: journal of kerbala university مجلة جامعة كربلاء ISSN: 18130410 Year: 2015 Volume: 13 Issue: 2 Pages: 13-31
Publisher: Kerbala University جامعة كربلاء

Loading...
Loading...
Abstract

A housing problem of the problems facing the countries, especially the developing countries. It is essential to provide housing units at the level commensurate with the rapid population growth. Many countries have applied structural policies to confront this problem by relying on the available material and human resources to provide as many housing units to occupy by those who do not have good housing for shelter.This research targeted the field of affordable housing units in general and the impact of use Structural innovative system in particular, and the impact of the implementation of the new system on the cost and Duration of time needed to accomplish. In order to reach the aim of the research was take advantage of previous research and studies in the field of implementation of housing units by insulated concrete forms technique shorten to (ICF) technique and adopt this technique for the implementation of residential complexes.The research reached to propose a new technique for the construction of housing units by the construction of a typical residential house at the headquarters of the General Authority for Housing using the proposed technique. An economic comparison was conducted between the proposed system for construction and traditional commonly used building systems of massive wall system and frame wall system. It has been found that the proposed system is better than commonly used alternatives to an economic life of 33 years,

تعد مشكلة الاسكان من المشاكل التي تواجه البلدان وخاصة النامية منها, فلابد من توفير الوحدات السكنية بالمستوى الذي يتناسب مع النمو السكاني المطرد. اتبعت دول عدة بعض السياسات الانشائية لمواجهة هذه المشكلة بالاعتماد على الموارد المادية والبشرية المتاحة لها لتوفير اكبر عدد ممكن من الوحدات السكنية لاشغالها من قبل الذين لا يملكون السكن الصالح لايوائهم.استهدف البحث مجال الاسكان الاقتصادي بشكل عام و تاثير استخدام نظام انشائي حديث بشكل خاص, وكذلك اثر تطبيق النظام الجديد على الكلفة اللازمة للانجاز . من اجل الوصول الى هدف البحث فقد تم الاستفادة من البحوث والدراسات السابقة في مجال تنفيذ وحدة سكنية بتقنية القوالب الخرسانية المعزولة التي تختصر الى تقنية ال (ICF) , واعتمادها لتنفيذ المجمعات السكنية.هذا البحث توصل الى اقتراح تقنية جديدة لانشاء الوحدات السكنية وذلك باقامة وحدة سكنية نموذجية في مقر الهيئة العامة للاسكان باستخدام هذه التقنية المقترحة. اكتمل البيت النموذجي بتكلفة قدرها حوالي 449513 دينار عراقي للمتر المربع الواحد, طول الفترة الزمنية التي استغرقها تنفيذ كامل الهيكل 23 يوم بضمنها ايام تدريب العمال ولمساحة اجمالية بلغت 226م2 وطول الفترة الزمنية التي تنفيذ الانهاءات 62 يوم عمل.كما اجريت المقارنات الاقتصادية بين النظام المقترح للبناء وبين النظمة البناء التقليدية من نظامي البناء الجداري والهيكلي الشائعة الاستخدام بطريقة الكلفة السنوية بعد حساب كلف الصيانة والطاقة السنوية حيث كانت الكلفة السنوية للنظام المقترح 26945 دينار عراقي للمتر المربع و(36278و34768) دينار عراقي للمتر المربع للبناء الهيكلي والبناء الجداري على التوالي

Keywords


Article
CONSTRUCTION DELAY ANALYSIS USING DAILY WINDOWS TECHNIQUE

Authors: Salsabeel S. Jafar --- Sawsan Rasheed Mohammed
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2011 Volume: 17 Issue: 1 Pages: 186-199
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Delays occur commonly in construction projects. Assessing the impact of delay is sometimes a contentious issue. Several delay analysis methods are available but no one method can be universally used over another in all situations. The selection of the proper analysis method depends upon a variety of factors including information available, time of analysis, capabilities of the methodology, and time, funds and effort allocated to the analysis. This paper presents computerized schedule analysis programmed that use daily windows analysis method as it recognized one of the most credible methods, and it is one of the few techniques much more likely to be accepted by courts than any other method. A simple case study has been implemented to demonstrate the accuracy and usefulness of the proposed delay analysis model. The results of the study indicate that the outcomes of delay analyses are often not predictable that each method may yield different results. The study also revealed that depending on the time and resources available, and the accessibility of project control documentation, one method may be more practical or cost-effective.

تحدث التاخيرات كثيرا في المشاريع الانشائية. وغالبا ما يكون تقييم تأثير التأخير موضع نزاع. توجد عدة طرق لتحليل التأخير لكن لا توجد طريقة واحدة يمكن ان تفضل على اخرى في كل الحالات. يعتمد اختيار طريقة التحليل الصحيحة على مجموعة من العوامل منها المعلومات المتوفرة و وقت التحليل و قابلية التقنية المستخدمة والوقت و التمويل والجهد المخصص للتحليل. يقدم هذا البحث برنامج حاسوبي لتحليل الجداول والذي يستخدم تقنية النوافذ اليومية باعتبارها احدى اكثر الطرق الموثوقة و واحدة من الطرق القليلة التي تقبل بها المحاكم من اي طريقة اخرى. تم طبيق حالة دراسية بسيطة من اجل توضيح دقة وفائدة برنامج تحليل التاخير المقترح.. تشير نتائج الدراسة الى أن نتائج تحليلات التأخيرفي اغلب الاحيان ليست متوقعة ذلك بان كل طريقة قد تعطي نتائج مختلفة. كَشفتْ الدراسةَ ايضا بأنّه الوقتِ والمصادر المتوفرة وامكانية الوصول الى وثائق مراقبة المشروعِ هي العوامل التي تحدد اي طريقة قَد تَكُون الأكثر عمليةَ أَو الأكثرَ ربحاً.


Article
Neural Networks For Estimating The Ceramic Productivity Of Walls

Authors: Ali Sabri Tofan --- Sawsan Rasheed Mohammed
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2011 Volume: 17 Issue: 2 Pages: 200-217
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Productivity estimating of a construction operation is an essential tool for the successful completion of the construction process. Productivity of a construction operation is defined as output of the system per unit of time.In this research Artificial Neural Networks approaches are presented. The main reason for using neural networks for construction productivity estimation is the requirement of performing complex mapping of environment and management factors to productivity.A generic description of the artificial neural networks model is provided, followed by summarized factors that affect ceramic labor productivity, then neural-network model are developed for Estimating ceramic walls productivity, the input data for the model based on experienced superintendents employed by a leading construction general contractor, test results show that the ANN approach can produce a sufficiently accurate estimate with a limited data-collection effort, and thus has the potential to provide an efficient tool for construction productivity estimation.

تخمين الإنتاجية لعملية البناء هي وسيلة أساسية من أجل النجاح في إتمام عملية البناء و تعرف إنتاجية البناء على انها ناتج النظام لكل وحدة من الوقت. في هذا البحث استخدمت الشبكات العصبية الاصطناعية. السبب الرئيسي لاستخدام الشبكات العصبية لتقدير انتاجية البناء هو متطلبات رسم الخرائط المعقدة للبيئة و عوامل ادارة الانتاجية.وضع وصف عام لنموذج الشبكات العصبية الاصطناعية ، يليها تلخيص العوامل التي تؤثر على إنتاجية عمال السيراميك ، ثم طور نموذج من الشبكات العصبية المتقدمة لتخمين انتاجية السيراميك للجدران ، والبيانات المدخلة للنموذج اعتمدت على المراقبين ذوي الخبرة و الموظفين من قبل المقاول العام للانشاء ، تشير نتائج الاختبار الى أن الشبكات العصبية الاصطناعية يمكن ان تؤدي إلى تخمينات دقيقة بما فيه الكفاية مع جهود جمع بيانات محدودة ، وبالتالي فأن الاختبار لديه القدرة على توفير أداة فعالة لتخمين إنتاجية البناء.

Keywords

NEURAL --- NETWORKS --- ESTIMATING --- CERAMIC --- PRODUCTIVITY --- WALLS


Article
Optimization Of Resource Allocation And Leveling Using Genetic Algorithms

Authors: Ameer Ahmed Abdul Ameer --- Sawsan Rasheed Mohammed
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2011 Volume: 17 Issue: 4 Pages: 929-947
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Resource allocation and leveling are of the top challenges in project management, due to the complexity of projects. This research aims to develop an optimization model for resource smoothing, so that. The proposed model is formulated using C++ program for resource smoothing. The project management software MS-Projects is adopted hereto perform resource leveling to facilitate achieving the optimal solution.The proposed model utilizes a system that depends on Genetic Algorithms (GAs) procedure built in C++ program to find the optimum solution.This research reach concludes that it is possible to smooth resources using Genetic Algorithms program and compares then with MS-Project when the GA results are better than MS-Project.Three case studies have been applied in this research and the application results come identical with research objectives, to form the conclusion.Then comes the recommendations regarding adopting and using the research results in construction planning and project management. Further suggestions related to the research subject are proposed for future works.

ان تعيين وتسوية الموارد هي من اكثر التحديات في ادارة المشروع بسبب تعقيد المشاريع. يهدف هذا البحث الى بناء نموذج امثل لتسوية الموارد. لقد تم بناء النموذج المقترح باستخدام برنامج C++ لتسوية الموارد وكما تم اعتماد برنامج لادارة المشاريع (MS-Project) لاجراء تسوية الموارد لتسهيل الوصول الى الحل الامثل. يعتمد النموذج المقترح على اسلوب الخوارميات الجينية حيث تم بناؤه باستخدام برنامج (C++) للبحث عن الحل الامثل.توصل البحث الى امكانية تسوية الموارد باستخدام الخوارزميات الجينية ومقارنتها مع برنامج MS-Project ولقد وجد ان نتائج الخوارزميات الجينية افضل من نتائجMS-Project وطبقت نتائج البحث على ثلاث حالات درست وكانت نتائج التطبيق مطابقة لما هدف اليه البحث. وتم التوصل الى عدد من الاستنتاجات كما وضعت عدد من التوصيات والمقترحات بشان تبني نتائج البحث في حقل التخطيط وادارة المشاريع كما وضعت عدد من المقترحات لبحوث لاحقة ذات صلة بموضوع البحث.

Keywords


Article
Use of Gis for Creating a Project Management Data Base in Baghdad Al-Rissfa
استخدام نظم المعلومات الجغرافية لإنشاء قاعدة بيانات لإدارة المشاريع في محافظة بغداد (الرصافة)

Authors: Sawsan Rasheed Mohammed سوسن رشيد محمد --- Ayad abdulamer shaqate أياد عبد الامير
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2012 Volume: 18 Issue: 10 Pages: 208-232
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The main objective of resources management is to supply and support the site operation with necessary resources in a way to achieve the required timing in handing over the work as well as to achieve the cost-realism within the budget estimated. The research aims to know the advantage of using GIS in management of resources as one of the new tools that keep pace with the evolution in various countries around the world also collect the vast amount of spatial data resources in one environment easily to handled and accessed quickly and this help to make the right decision regarding management of resources in various construction projects.The process of using GIS in the management and identification of resources is of extreme importance in the process of planning, programming, management and cost of resources and therefore a scientific follow-up cost and time to projects construction different as that fact indicates an urgent need to use new tools to help the process of projects within clear curriculum and assess the benefit of those Tools according to what is available in the same field As a result of the steps used in the application of research methodology it has been achieved to prove the benefit of using geographic information systems for better management and resource planning for various projects which help to reduce the duration of the project and help Italy national on the speed-up the execution and provides a new environment for the management of the vast quantity of spatial data in one place which make it easy to handle and to update. It is therefore necessary to develop a culture of management of construction projects and take advantage of the methods and techniques and modern ways in an attempt to catch up with progress in the field of Construction in the world

ان الهدف الأساسي من إدارة الموارد إمداد ودعم عمليات الموقع بالموارد اللازمة بحيث يمكن تحقيق التوقيتات المطلوبة تسليم الإعمال فيها وكذلك الوصــــــول الى التكلفة الواقعية في حدود الموازنة المقدرة . يهدف البحث إلى معرفة الفائدة من استخدام نظم المعلومات الجغرافية في إدارة الموارد كأحد الأدوات الجديدة التي تواكب التطور الحاصل في مختلف دول العالم وأيضا جمع الكم الهائل من البيانات المكانية المتعلقة بالموارد في بيئة واحدة يسهل التعامل معها والوصول إليها بسرعة وهذه يساعد على اتخاذ القرار السليم فيما يتعلق بالموارد في مشاريع التشييد المختلفة .ان عملية استخدام نظم المعلومات الجغرافية في إدارة الموارد وتحديدها له أهمية بالغة في عملية التخطيط والبرمجة وإدارة وكلفة الموارد ومن ثم عملية متابعة الكلفة والوقت لمشاريع التشييد المختلفة كما وان واقع الحال يوشر حالة ملحة لاستخدام ادوات جديدة تساعد عملية إدارة المشاريع ضمن منهاج واضح وسليم وتقييم مدى الاستفادة من تلك الأدوات في ضوء ماهو متوفر في ذالك المجال .ونتيجة للخطوات المتبعة في تطبيق منهجية البحث تم التوصل إلى إثبات مدى الفائدة من استخدام نظم المعلومات الجغرافية بتحسين إدارة وتخطيط الموارد للمشاريع المختلفة مما يساعد على تقليل عمر المشروع ويساعد أيضا على السرعة في التنفيذ ويهيئ بيئة جيدة لإدارة الكم الهائل من البيانات المكانية ضمن مكان واحد يسهل التعامل معها وتحديثها .لذا من الضروري تطوير ثقافة إدارة المشاريع الإنشائية والاستفادة من الطرق والأساليب و التقنيات الحديثة في محاولة للالحاق بركب التطور الحاصل في مجال التشييد في العالم.

Keywords


Article
Regulations Enforcement Mechanisms for Sustainable Housing Projects
آليات انفاذ ضوابط مشاريع السكن المستدام

Authors: Sawsan Rasheed Mohammed سوسن رشيد محمد --- Ibtisam Abduljabbar Abdulridha ابتسام عبد الجبار عبد الرضا
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2017 Volume: 23 Issue: 7 Pages: 33-49
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Regulations are one of the instruments that governments used to achieve objectives of their policies. Sustainable projects often face compliance problems when working to meet the applicable regulations. The challenge for governments is to develop and apply enforcement mechanisms that achieve the best possible outcomes by achieving the highest possible levels of compliance. The aim of this paper is to identify the most effective mechanisms that can be used to develop a framework for the regulations enforcement for the applications of sustainable housing projects. Accordingly, this paper reviews the common classification of building regulations and enforcement steering mechanisms, in addition to the related international tools of sustainable housing development. The researchers developed a questionnaire included proposals for legislation within five main themes: materials, energy efficiency, water efficiency, health and safety as well as management of residential complexes during the occupation and maintenance phase. Findings represented the highly importance and top preference of incentive mechanism for enhancing sustainable housing regulations. Furthermore, in the theme of health and safety is within the authority of the institution that set these regulations to be imposed on providers and developers of housing. While the results of both energy efficiency and management of housing complexes indicate that legislation be obligated through centralized Act and not as an institutional, so any institution must impose these legislations on housing developers.

تعتبر التشريعات واحدة من الأدوات المستخدمة من الحكومات لتحقيق أهداف السياسات التي تضعها. وكثيراً ما تصادف المشاريع المستدامة مشاكل التنظيم والامتثال للقوانين في تلبية اللوائح بشكل أوسع. ان التحدي الذي تواجهه الحكومات هو تطوير وتطبيق آليات انفاذ التشريعات التي تحقق أفضل النتائج الممكنة من خلال تحقيق أعلى المستويات الممكنة من المطابقة. يهدف البحث الى تحديد الآليات الأكثر فاعلية التي يمكن استخدامها لوضع إطار لإنفاذ اللوائح لتطبيقات المشاريع الإسكانية المستدامة. يستعرض البحث مختلف انواع انظمة البناء وآليات الانفاذ فضلاً عن الأدوات العالمية الخاصة بالإسكان المستدام. طور الباحثون ااستبياناً شمل مقترحات لتشريعات ضمن خمسة محاور رئيسية هي: المواد وكفاءة الطاقة وكفاءة استخدام المياه والصحة والسلامة، فضلا عن إدارة المجمعات السكنية خلال مرحلة الاشغال والصيانة. تمثلت النتائج باهمية آلية التحفيز كأحد انواع التشريعات المعززة لنشر تطبيقات السكن الميسر حيث كانت الاعلى تفضيلاً. كما لوحظ في محور الصحة والسلامة حيث يقع ضمن سلطة المؤسسة التي تضع هذه تفرض على مقدمي ومطوري الإسكان. في حين أشرت نتائج كل من محوري كفاءة الطاقة وإدارة المجمعات السكنية أن تكون بشكل تشريع ملزم من خلال قانون مركزي، لذلك يجب على المؤسسات أن تفرض هذه التشريعات على مطوري الإسكان.


Article
Examining the Values and Principles of Agile Construction Management in Iraqi Construction Projects
اختبار قيم ومبادئ إدارة البناء الرشيقة في المشاريع الانشائية العراقية

Authors: Sawsan Rasheed Mohammed سوسن رشيد محمد --- Asmaa Jebur Jasim أسماء جبر جاسم
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2018 Volume: 24 Issue: 7 Pages: 114-113
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identify the values and principles of Agile project management, which can be applied in the Iraqi construction industry to be adopted it as a new method to manage the construction projects in Iraq. The researcher reviewed the relevant literature to define the method of Agile project management and its methods and impact on the construction project. Then, the researcher conducted a questionnaire survey of a sample of engineers' experts who work in four main parties in the construction project: (beneficiary, supervising, designer, and contractor). The results of this survey showed that it is possible to apply the four values of Agile project management for managing the Iraqi construction projects, and can apply eleven of the twelve principles of Agile project management for managing the Iraqi construction projects.

ان تجنب حدوث فشل في المشاريع الانشائية ليس بمهمة سهلة، مما يجعل فشل المشروع الانشائي في تحقيق اهدافه مشكلة كبيرة تعاني منها كافة الدول وخصوصاً العراق. حيث ان مايقارب ثلثي المشاريع الانشائية في العالم خلال الاعوام العشرة الماضية حدثت فيها مشاكل كبيرة كزيادة في كلفة المشروع, وتجاوز مدة التنفيذ المحددة وتوقف المشروع. لذلك يتطلب دراسة وتطبيق أساليب جديدة لادارة المشروع الانشائي لضمان نجاحه وتحقيق اهدافه. تهدف هذه الدراسة الى دراسة اسلوب ادارة المشاريع الرشيقة وتأثيرها على المشروع لانشائي. بالاضافة الى تحديد قيم ومبادئ ادارة المشاريع الرشيقة التي يمكن تطبيقها في الصناعة الانشائية في العراق ليتم اعتمادها كاسلوب جديد لادارة المشاريع الانشائية العراقية. قام الباحث بمراجعة الادبيات ذات العلاقة لتعريف اسلوب ادارة المشاريع الرشيقة والطرق المتبعة فيها وتأثيرها على المشروع الانشائي. بعدها قام الباحث باجراء مسح ميداني لعينة من الخبراء المهندسيين الذين يعملون لدى الاطراف الرئيسية الاربعة في المشروع الانشائي وهم: (جهة مستفيدة، جهة اشراف ومتابعة، جهة مصممة، جهة منفذة). كانت نتائج المسح الميداني انه بالامكان تطبيق القيم الاربعة لادارة المشاريع الرشيقة في ادارة المشاريع الانشائية العراقية، وكذلك يمكن تطبيق احد عشر مبدأ من اصل اثنى عشر مبدأ من مبادئ ادارة المشاريع الرشيقة في ادارة المشاريع الانشائية العراقية.