research centers


Search results: Found 4

Listing 1 - 4 of 4
Sort by

Article
Testing the Applicability of Submerged Hollow Fiber Membrane Bioreactor (MBR) Technology for Municipal Wastewater Treatment in Iraq
أختبار تطبیق تقنیة المفاعلات البیولوجیة ذات أغشیة الألیاف المجوفة لمعالجة میاه الصرف الصحي في العراق

Authors: Talib R. Abbas --- Mohammed A. Abdul-Majeed --- Inmar N.Ghazi
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2012 Volume: 30 Issue: 19 Pages: 3467-3473
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

Operation of a one module hollow fiber submerged type MBR system wastested in this work. The system was operated at fixed permeate flowrate of 12 l/hr.The hydraulic retention time of the aeration tank was about 8.3 hr. The mixedliquor suspended solid (MLSS) concentration was maintained in the range 5000-5500 mg/l. The results show the workability of this system under Iraqi conditionswithout any difficulties. About 85% chemical oxygen demand (COD) removalwas achieved. The value of turbidity is well below 0.61 NTU throughout theoperation time.

ت م ف ي ھ ذا العم ل أختب ار منظوم ة معالج ة می اه ص رف ص حي بأس تعمال تقنی ة المف اعلاتالبیولوجیة ذات الأغشیة. تم أستعمال قطعة غشاء واحدة غاطسة نوع الالیاف المجوفة. تم تشغیلالمنظومة بمعدل جریان ثابت للماء النافذ عب ر الغش اء وبح دود 12 لت ر/س اعة. ك ان ال زمن البق اءالھیدرولیكي للماء داخل خزان التھوی ة بح دود 8.3 س اعة. ت م الحف اظ عل ى تركی ز الم واد العالق ة5500 ملغم/لتر. أظھ رت النت ائج عم ل ھ ذه - الصلبة للماء في خزان التھویة ضمن المدى 5000التقنیة وفي الظروف العراقیة وبدون مشاكل. بلغ ت نس بة الأزال ة لمتطل ب الأوكس جین الكیمی اوي.NTU بحدود 85 %. وكانت قیمة العكورة خلال فترة التشغیل أقل من 0.61


Article
SOLVING PROBLEMS FACED DURING BIOLOGICAL KINETIC DETERMINATION
حل المشاكل التي تواجه خلال حساب محددات الحركة البايولوجية

Authors: Adnan Abbas Ali Al-Samawi1 --- Safaa Nasser Hassan Al-Hussaini
Journal: Journal of Engineering and Sustainable Development مجلة الهندسة والتنمية المستدامة ISSN: 25200917 Year: 2017 Volume: 21 Issue: 1 Pages: 104-113
Publisher: Al-Mustansyriah University الجامعة المستنصرية

Loading...
Loading...
Abstract

: One of the most effective methods used in the biological treatment of a wastewater is the activated sludge process. The importance of the biological kinetic parameters determination is clearly illustrated by the fact that it is usually used in designing such systems. The present study aims to depict the problems faced during the experimental work of determining the bio-kinetics and their causes with an attempt to find proper solutions for them. A completely mixed continuous flow bench scale reactor was operated to determine the biological kinetic for municipal wastewater, during which the generated problems were depicted and solved. It was found that the most common affecting problems were sludge bulking in the final clarifier, followed by rising sludge, filamentous bacteria, settlement of biomass at the bottom of the aeration tank, and finally low biomass activity either immediately after acclimation or after steady state was reached. Solutions were recommended for each problem having continuous monitoring of several parameters at the reactor as their base. Despite the fact that different problems and their solutions have been introduced in this paper, there is no guarantee that all problems are covered. However, one can benefit from what is available.

ان قياس المحددات البايولوجية لأي مخلف مائي يعتبر مهم جدا, حيث ان تصميم وحدة المعالجة البايولوجية لهذا المخلف تعتمد على قيم هذه المحددات. يهدف البحث الحالي الى تحديد المشاكل التي تواجه خلال الجانب العملي في حساب المحددات البايولوجية وأسباببها, مع محاولة ايجاد حلول مناسبة لها. تم تشغيل مفاعل مختبري لغرض قياس المحددات البايولوجية لمياه الصرف الصحي وقد تم خلالها تشخيص معوقات العمل وحلولها. وجُد أن أكثر المشاكل تأثيرا على الجانب العملي هو طفو الحمأة في حوض الترسيب النهائي وبعدها تأتي معوقات اخرى متمثلة بالحمأة الصاعدة, البكتيريا الخيطية, ترسبات الكتلة الحية في احواض التهوية, واخيرا خمول الكتلة الحيوية في احواض التهوية. تم التوصية بعدة حلول لهذه المعوقات وقد كانت المراقبة المستمرة للمنظومة اثناء العمل اساس لهذه الحلول.بالرغم من استحداث البحث لعدة معوقات مع مقترحات لحلولها, الًا انه لا يوجد ما يضمن احتواء جميع المشاكل, مع ذلك ممكن الاستفادة مما هو متاح.


Article
Aeration Tank Behavior in the Activated Sludge Wastewater Treatment Plant Startup Conditions Case study; (Wastewater Treatment plant of General Mosul hospital- IRAQ)
تصرف الخزان المهوى للحمأة المنشطة في معالجة المياه الثقيلة وخلال ظرف تشغيل ابتدائي

Author: Riyadh Mahmood Saleh Al-Obaidi رياض محمد صالح العبيدي
Journal: Muthanna Journal of Engineering and Technology(MJET) مجلة المثنى للهندسة والتكنولوجيا ISSN: 25720317 25720325 Year: 2011 Volume: 1 Issue: 1 Pages: 1-13
Publisher: Al-Muthanna University جامعة المثنى

Loading...
Loading...
Abstract

The biological unit in the waste water treatment plants can be considered the most sensitive treatment units. It begins work with dynamic conditions for several weeks until reach the steady state conditions. Therefore, this study was done to observe aeration tank behavior (activated sludge unit) in the wastewater treatment plant of general hospital complex of Mosul city. Sampling made daily for more than 30 days. The biological treatment monitoring parameter was tested. The study shown that there is need to about 45-60 days to complete the start up work to be the operation stable and successful (if it worked without seeding). There was simple growth of microorganisms with modest treatment of organic matter, and then it rose after 3 first weeks of operation. There was contrary relationship between organic content and suspended solids in the aeration tank; an equation of this relation has been presented. The pH has risen in the first days in the effluent wastewater, then return to be less than influent pH with a relative relation with the activity of the microorganisms and surface aeration in the tank. The EC was simply reduced in the Effluent along with the study.

تعد وحدة المعالجة البيولوجية الوحدة الاكثر حساسية بين وحدات محطة معالجة مياه الفضلات . تبدأ الوحدة عملها بظروف ديناميكية (غير مستقرة) لمدة أسابيع لحين وصولها الى حالة الثبات بالعمل. لذلك اجريت هذه الدراسة لمتابعة سلوك حوض التهوية (بوحدة الحمأة المنشطة) في محطة معالجة مياه الصرف الصحي لمجمع المستشفى العام في مدينة الموصل. وقد تم اخذ نماذج يومية من المحطة اثناء بدء تشغيلها لمدة تزيد على 30يوما . وتم قياس مؤشرات مراقبة عمل الوحدة البايولوجية. أظهرت الدراسة بأن هناك حاجة لفترة 45-60 يوما لاكتمال ظروف الابتداء والوصول الى العمل المستقر للوحدة (حين عدم اضافة بذور الحمأة المنشطة). وقد كان هناك نمو بسيط للاحياء المجهرية مع معالجة معتدلة للمحتوى العضوي في المياه الداخلة للمحطة، وتصاعد النمو بعد 3 اسابيع من التشغيل . وكان هناك علاقة عكسية بين محتوى المواد العضوية في حوض التهوية وبين المواد العالقة (الكتلة الحية). كما حصل ارتفاع لمؤشر الدالة الحامضية pH في الايام الاولى من بدء التشغيل ثم تراجع ليكون pH في المياه المعالجة اقل منه في الداخلة بسبب نشاط الاحياء المجهرية والتهوية السطحية في الحوض. بينما تناقص مؤشر التوصيلية الكهربائية بنسبة قليلة في المياه المعالجة على طول فترة الدراسة ، وتزايد استهلاك الاوكسجين عند اكتمال عملية البدء بالتشغيل.


Article
Advance Wastewater Treatment; Biological Removal of Eutrophic Nutrients
المعالجة المتقدمة لمياه الصرف الصحي , الازالة البايولوجية لمغذيات الاثراء الغذائي

Authors: Marwa F. Abed --- Mohammed Y. AL- Ani --- Faris H. Al-Ani
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2015 Volume: 33 Issue: 5 Part (A) Engineering Pages: 1131-1142
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

In this study, a lab scale different activated sludge configurations methods were used to treat a municipal wastewater from effluent of; primary sedimentation tank of Al-Rustamiya wastewater treatment plant located near Baghdad city to remove organic load, nitrogen and phosphorus from the period of 15 July 2012 to 22 May 2013.Biological treatment systems were conventional activated sludge (CAS) , extended aeration , anaerobic-anoxic-aerobic( A2O) , anoxic-aerobic (MLE) and anaerobic –oxic(A/O). During the operation periods, the average removal efficiency of BOD5, COD and TSS is 81.9, 77.7 and 85.8 respectively regardless of the fluctuation in influent quality. In addition the results show removal efficiency of ammonia, nitrate, nitrite and phosphorus with ranges (61-85.8), (34-81.7) , (35-81.4) (32.3-85.54) % respectively. The biological treatment systems produced high quality effluent which can achieve the Iraqi limitations of rivers maintenance for all measured parameters.

في هذه الدراسة، على نطاقالمختبر تم استخدام تشكيلات أنظمة معالجةحمأة منشطة مختلفة لمعالجة مياه الصرف الصحي البلدية والخارجة من حوض الترسيب الاولي لمحطة معالجة الرستمية الواقعة بالقرب من مدينة بغداد لازالة الاحمال العضوية,النتروجين والفسفور في الفترة من 5 يوليو 2012 الى 22 مايو 2013. انظمة المعالجة البايولوجية هي الحماة المنشطة التقليدية ,التهوية المطولة ,(اللاهوائي –هوائي محدد – هوائي) ,( هوائي محدد – هوائي) و (اللاهوائي - هوائي) .أثناءفترات العمل، فإن متوسط كفاءة الإزالة لكل من الاوكسجين المطلوب حيويا ، الاوكسجين المطلوب كيميائيا والمواد االعالقة الكلية هو81.9، 77.7و 85.8 %على التواليبغض النظر عنالتذبذب فينوعية المياه الواردة. بالإضافةالى ان النتائج تظهر إزالةللأمونيا,النترات ,النتريت والفوسفورضمن مدى(61- 85.8) ,(34-81.7) ,(35-81.4) و (32.3-85.54) %على التوالي.أن أنظمةالمعالجة البيولوجية انتجت نوعيةتصريف خارج بنوعية ممتازة والتييمكن أن تحققحدود المواصفاتالعراقيةلصيانة الانهارو لجميعالمعايير التي تم قياسها.

Listing 1 - 4 of 4
Sort by
Narrow your search

Resource type

article (4)


Language

English (4)


Year
From To Submit

2017 (1)

2015 (1)

2012 (1)

2011 (1)