research centers


Search results: Found 2

Listing 1 - 2 of 2
Sort by

Article
Application of Decision Support System in Construction Projects use in Cost Management

Authors: Ahmed M. R. Mahjob --- Sidqi I. Razzouqi
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2006 Volume: 12 Issue: 1 Pages: 85-97
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

This work is concerned with introducing new methods and techniques for the projects management In construction industry. This research suggest that the Iraqi engineering staff, who work in construction sector, have a poor knowledge about the subject of Decision Support System (D.S.S.)in spite of that this subject have a wide uses in construction companies in the world. So the researcher presents this study to introduce and to increase the knowledge about the concept of decision Support System.This research consist of the questionnaire process for construction companies, then the research use The questionnaire results in building a proposed Decision Support System, also the questionnaire Process indicate the relation between the decision structure and the organizational levels. The results obtained from the questionnaire process shows that there is a requirement for Decision support System in cost control decisions support. So the researcher build a Decision Support system for cost control process which can be used by the planner and estimator for different types of projects. The researcher also applies and evaluates the proposed system in some Iraqi construction companies. The application and evaluation process recommended the needs for applying the Decision Support System for project management in construction companies.

يتعلق هذا العمل البحثي بتقديم الطرائق والتقنيات الحديثة للإدارة مشاريع الصناعة الإنشائية.يفترض البحث ان الكادر الهندسي العراقي، الذي يعمل في قطاع الإنشاءات، لديه معرفة قليلة حول موضوع نظام دعم القرار بالرغم من أن هذا الموضوع له استخدامات عديدة في شركات الإنشاء في العالم. لذلك يقدم الباحث هذه الدراسة لإدخال وزيادة المعرفة حول مفهوم نظام دعم القرار.يضم البحث عملية استبيان لشركات الإنشاء، يقوم الباحث بعدها باستخدام نتائج الاستبيان في تطبيق نظام دعم قرار مقترح، كما تؤشر عملية الاستبيان العلاقة بين هيكلية القرار والمستويات الإدارية. لقد بينت نتائج عملية الاستبيان الحاجة إلى نظام دعم القرار في قرارات السيطرة الكلفوية. لذلك قام الباحث ببناء نظام دعم قرار للسيطرة الكفولية والذي يمكن استخدامه من قبل المخططين والمخمنين لمختلف أنواع المشاريع الإنشائية. كما قام الباحث بتطبيق وتقويم النظام المقترح في بعض شركات الإنشاء العراقية


Article
An Economic Analysis of Boultry Production Cost in Anbar Province
تحليل اقتصادي لتكاليف إنتاج لحوم فروج الدجاج في محافظة الأنبار ( دراسة تحليلية ميدانية )

Author: Hameed Rasheed al-Dulaimi حميد رشيد الدليمي
Journal: ANBAR JOURNAL OF AGRICULTURAL SCIENCES مجلة الأنبار للعلوم الزراعية ISSN: PISSN: 19927479 / EISSN: 26176211 Year: 2006 Volume: 4 Issue: 1 Pages: 348-359
Publisher: University of Anbar جامعة الانبار

Loading...
Loading...
Abstract

It has been shown that ensilager ranke first in the cost of one K.G. of checken (Boultry) ie a bout 57% of the total cost, followed by the cost of checks which represented 17% of the total cost .it was clear that winter is characterized by an increase in the cost of one k.g. of boultry in comparison with other seasons.Function of production cost per season have been estimated since winter is significantly different regarding the cost of one k.g. of meat from other season , it has been isolated from other season with a special function for winter and another for other season.Cost cubic function was significant in expressing the relationship between the total cost and production per batch during the year of the conducting of this study and other different seasons. statistical tests showed the significance of the function. It has appeared from the factor determining R2 that more than 97% of the change in production cost were due to the illustrative variable of the estimated functions.Cost function have been economically analyzed to determine optimum production size that achieve optimum economic efficiency per each k. g. of checken meat (boultry) with the least cost .this production siz was the heigest during the year of carrying out this project. it was about 18194 k. g. of checken meat per batch with a total cost a bout 1300 I. D. per k. g. It has been clear that winter showed a difference in comparison with other seasons where the optimum production size during these seasons was 17331.Total cost function at its lowest rate was at that productive level. The cost of one k. g. of checken meat was a bout 1253 I. D. where optimum size production during winter was higher in comparison with other season. It was 20264 k. g. per batch and with a cost rate higher than its counterparts in other seasons of a bout 313 I. D. Since the main goal of the producer is to douplicate benefit or a void loss, therefore optimum production levels have been calculated at different price levels. It was clear that the increase of prices in accompanied with an increase of optimum production levels at different levels from season to season. Moreover, it was clear that the producer gets benefits when the price he gets puts his work at the stage of diseconomies of scale whereas his work will represent a loss when he works within the stage of economies of scale.

تبين بان الأعلاف تحتل المرتبة الأولى في تكوين تكلفة كغم لحم الدجاج وتمثل نحو 57% من التكاليف الكلية تليها تكلفة الأفراخ إذ تمثل نحو 17 % من التكاليف الكلية وقد تبين بان موسم الشتاء يتسم بارتفاع تكلفة كغم لحم الدجاج مقارنه بالمواسم الأخرى . تم تقدير دوال تكاليف إنتاج الوجبة لكل المواسم ولما كان موسم الشتاء يختلف معنوياً من حيث كلفة كغم اللحم عن المواسم الأخرى لذلك تم عزله عن بقية المواسم وتقدير داله خاصة بالشتاء وأخرى خاصة بالمواسم الأخرى وقد اثبتت دالة التكاليف التكعيبية معنويتها في التعبير عن العلاقة بين الكلفة الكلية في الوجبه الواحده والأنتاج وعلى مستوى السنة وعلى مستوى المواسم المتباينة . اشارت الأختبارات الأحصائية الى معنوية الدالة وتبين من خلال قيمة معامل التحديد (R2) بلأن أكثر من 97 % من التغيرات في التكاليف تعود الى في المتغيرات التوضيحية التي تضمنتها الدالة .تم تحليل دوال التكاليف اقتصادياً لتحديد حجوم الأنتاج المثلى التي تحقق اعلى كفاءة اقتصادية بسبب انتاج كغم لحم الدجاج عندها باقل كلفه وبلغ هذا الحجم على مستوى سنة البحث نحو 18194 كغم لحم فروج الدجاج في الوجبه وبمعدل كلفه كليه بحدود 1.300 الف دينار للكيلوغرام . تبين بان الموسم الشتوي اظهر اختلافاً عن بقية المواسم ( الصيفي والربيعي والخريفي )التي بلغ حجم الأنتاج الأمثل لها نحو 17331 اذ تكون دالة معدل التكاليف الكلية عند نهايتها الدنيا عند هذا المستوى الأنتاجي وبلغ معدل كلفة كغم لحم فروج الدجاج نحو 1.253 الف دينار بينما بلغ حجم الأنتاج الأمثل لموسم الشتاء كمية اعلى من بقية المواسم اذ بلغ نحو 20264 كغم في الوجبه وبمعدل كلفه تزيد عن نظيراتها لبقية المواسم بلغت نحو 1.313 الف دينار .ولما كان هدف المنتج يتركز على تعظيم الربح او تدنية الخساره لذلك تم احتساب مستويات الأنتاج المثلى عند مستويات سعرية مختلفه وتبين بان زيادة الأسعار تصاحبها زيادة في مستويات الأنتاج المثلى وبمستويات متباينه من موسم لاخر وتبين بان المنتج يحصل على ارباح عندما يكون السعر الذي يحصل عليه يجعل عمله في مرحلة تناقص الغلة ( Diseconomies of scale ) بينما يكون عمله ينطوي على خساره في حالة كونه يعمل ضمن مرحلة تزايد الغله ( Economies of scale ) .

Listing 1 - 2 of 2
Sort by
Narrow your search

Resource type

article (2)


Language

Arabic and English (1)

English (1)


Year
From To Submit

2006 (2)