Article
Early Manufacturing Cost Estimate For Mechanical Parts

Author: Khalid Karam Abd
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2007 Volume: 25 Issue: 1 Pages: 103-116
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

In manufacturing environment cost estimates process is made in all stages ofproduct development from research to final product. Good estimatingtechniques and procedures are necessary for each manufacturing stage. Whenproperly implemented, these techniques produce acceptable operationalestimates that are useful to management for decision-making.In this research, an algorithm is developed to build system is calledFBMCE (Feature-Based Manufacturing Cost Estimate) to incorporate makingdecisions integrating design, process planning and manufacturing for costestimate purposes. The FBMCE system has been tested on product (Shaft 8E -200) in State Company for Electrical Industries and showed promising results.

عملية تخمين الكلفة في البيئة التصنيعية تمر في كل مراحل تطوير المنتج من مرحلة البحث الىمرحلة المنتج النهائي. ان تقنيات وخطوات التخمين الجيدة ضرورية في كل مراحل التصنيع.وهذه التقنيات عند تنفيذها بشكل مناسب، فانها تؤدي الى تخمين مقبول لمصاريف التشغيلوالتي تفيد باتخاذ القرارات.تخمين كلفة التصنيع بالاستناد ) FBMCE في هذا البحث تم تطوير خوارزمية لبناء نظام يدعيالى السمة) والذي طور لاتخاذ القرارات حول التكامل بين التصميم وتخطيط العملية والتصنيعفي الشركة العامة (Shaft 8E - لغرض تخمين الكلفة. تم اختبار النظام على المنتج ( 200للصناعا ت الكهربائية حيث اظهر النتائج المرجوة منه.


Article
Software Engineering Cost Estimation Using COCOMO II Model

Authors: Hana Rashied Ismaeel هناء رشيد اسماعيل --- Abeer Salim Jamil عبير سالم جميل
Journal: AL-MANSOUR JOURNAL مجلة المنصور ISSN: 18196489 Year: 2007 Issue: 10 Pages: 86-111
Publisher: Private Mansour college كلية المنصور الاهلية

Loading...
Loading...
Abstract

In this paper we discuss the use of COCOMO II (Constructive Cost Model ) to estimate the cost of software engineering . The COCOMO II which allow us estimate the cost, effort and scheduling when planning new software development . We use the effort equation guidance to find the number of person / months which is needed to complete the project and duration equation to specified the numbers of months which is needed to complete this project. This paper present how implemented COCOMO II model equation about the same data in different language we choose C and OOP(C++),we make the analysis of these two program and we conclude that relation between effort and duration was forward relation, we mean that when effort increasing duration will increasing in the author side.

نناقش في هذا البحث كيفية استخدام نموذج الـ COCOMO II لتخمين كلفة البرامج في مرحلة التصميم . حيث ان هذا النموذج ( COCOMO II ) يستخدم لتخمين كل من الكلفة , الجهد والوقت المطلوب لبناء البرمجيات في مرحلة التصميم وذلك من خلال تطبيق كل من معادلات الجهد ( Effort ) لحساب عدد الاشخاص على الزمن المطلوب لبناء البرنامج وايضا تطبيق معادلات الوقت (Duration ) لحساب عدد الاشهر المطلوبة لاكمال هذا البرنامج . في هذا البحث تم توضيح كيفية تطبيق نموذج الـ COCOMO II على نوعين مختلفين من البرامج الاول تم استخدام لغة الـC لبنائه والثاني تم استخدام لغـة OOP ( C++) لبنائه ، ثم بعد الانتهاء من تطبيق معادلات الـ COCOMO II على البرنامجين تم اجراء تحليل النتائج والمقارنة ما بين البرنامجين ومن ثم تم التوصل الى وجود علاقة طردية ما بين الجهد (Effort) والوقت ( Duration ) حيث انه كلما ازداد الجهد سوف يزداد الوقت في نفس الوقت .