Development of an Integrated Construction Management System for Building Estimation

Authors: Sawsan Rasheed Mohammed --- Ehab Fadhil Mohammed Ali
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2012 Volume: 18 Issue: 9 Pages: 999-1013
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and duration of tasks, then exported to MS Project and MS Excel. The system was developed by using Visual Basic and ActiveX automation technology for combining the above software. The system, also, can calculate quantities of materials. The system includes digitizer (on-screen takeoff) calculates the lengths and areas of the drawings to which the form of an image and scanned. The integrated system has been applied to case study, a storages building for hospital 260 beds. The results proved the effectiveness of the system for the conversion of information from the graphical form dwg to numerical formulas xlcx / xlc and mpp can be handled easily pleased and software are covered.

ا تزال إدارة المشاريع تعتمد التبادل اليدوي للمعلومات و بالاستناد على الوثائق الورقية. حيث يتم رسم الخرائط و المخططات التصميمية بمساعدة الحاسوب ,CAD لكن البيانات المطلوب ادخالها لبرامجيات إدارة المشاريع لا يمكن استخراجها مباشرة من CAD بل يجب ادخالها يدويا من قبل المستخدم. ان عملية أخذ و تجميع المعلومات من المخططات التصميمة و ادخالها في برامجيات ادارة المشاريع تحتاج الى جهد و وقت مع احتمال حدوث اخطاء في نقل و ادخال المعلومات. هذا البحث يقدم نظاما حاسوبيا متكاملا لمشاريع المباني حيث يقوم باستخلاص و استيراد الكميات عن طريق ترجمة مخططات AutoCAD مع قاعدة بيانات MS Access بالكلف و الانتاجيات لحساب الاسعار و المدد الزمنية للفعاليات ثم تصديرها الى برامج MS Project و MS Excel. تم تطوير النظام بأستخدام Visual Basic و تقنية أتمتة ActiveX لربط البرامج اعلاه. بالاضافة الى حساب كميات المواد , يتضمن النظام Digitizerلحساب الاطوال و المساحات للمخططات التي تكون بصيغة صورية. تم تطبيق النظام المتكامل على دراسة حالة لبناية مخازن لمستشفى 260 سرير. اثبتت النتائج فعالية النظام في تحويل المعلومات من صيغتها الرسومية dwg الى صيغ عددية xlcx / xlc , mpp يمكن التعامل معها بسهولة و يسر بالبرامجيات المشمولة بها.


Article
Use of Gis for Creating a Project Management Data Base in Baghdad Al-Rissfa
استخدام نظم المعلومات الجغرافية لإنشاء قاعدة بيانات لإدارة المشاريع في محافظة بغداد (الرصافة)

Authors: Sawsan Rasheed Mohammed سوسن رشيد محمد --- Ayad abdulamer shaqate أياد عبد الامير
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2012 Volume: 18 Issue: 10 Pages: 208-232
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The main objective of resources management is to supply and support the site operation with necessary resources in a way to achieve the required timing in handing over the work as well as to achieve the cost-realism within the budget estimated. The research aims to know the advantage of using GIS in management of resources as one of the new tools that keep pace with the evolution in various countries around the world also collect the vast amount of spatial data resources in one environment easily to handled and accessed quickly and this help to make the right decision regarding management of resources in various construction projects.The process of using GIS in the management and identification of resources is of extreme importance in the process of planning, programming, management and cost of resources and therefore a scientific follow-up cost and time to projects construction different as that fact indicates an urgent need to use new tools to help the process of projects within clear curriculum and assess the benefit of those Tools according to what is available in the same field As a result of the steps used in the application of research methodology it has been achieved to prove the benefit of using geographic information systems for better management and resource planning for various projects which help to reduce the duration of the project and help Italy national on the speed-up the execution and provides a new environment for the management of the vast quantity of spatial data in one place which make it easy to handle and to update. It is therefore necessary to develop a culture of management of construction projects and take advantage of the methods and techniques and modern ways in an attempt to catch up with progress in the field of Construction in the world

ان الهدف الأساسي من إدارة الموارد إمداد ودعم عمليات الموقع بالموارد اللازمة بحيث يمكن تحقيق التوقيتات المطلوبة تسليم الإعمال فيها وكذلك الوصــــــول الى التكلفة الواقعية في حدود الموازنة المقدرة . يهدف البحث إلى معرفة الفائدة من استخدام نظم المعلومات الجغرافية في إدارة الموارد كأحد الأدوات الجديدة التي تواكب التطور الحاصل في مختلف دول العالم وأيضا جمع الكم الهائل من البيانات المكانية المتعلقة بالموارد في بيئة واحدة يسهل التعامل معها والوصول إليها بسرعة وهذه يساعد على اتخاذ القرار السليم فيما يتعلق بالموارد في مشاريع التشييد المختلفة .ان عملية استخدام نظم المعلومات الجغرافية في إدارة الموارد وتحديدها له أهمية بالغة في عملية التخطيط والبرمجة وإدارة وكلفة الموارد ومن ثم عملية متابعة الكلفة والوقت لمشاريع التشييد المختلفة كما وان واقع الحال يوشر حالة ملحة لاستخدام ادوات جديدة تساعد عملية إدارة المشاريع ضمن منهاج واضح وسليم وتقييم مدى الاستفادة من تلك الأدوات في ضوء ماهو متوفر في ذالك المجال .ونتيجة للخطوات المتبعة في تطبيق منهجية البحث تم التوصل إلى إثبات مدى الفائدة من استخدام نظم المعلومات الجغرافية بتحسين إدارة وتخطيط الموارد للمشاريع المختلفة مما يساعد على تقليل عمر المشروع ويساعد أيضا على السرعة في التنفيذ ويهيئ بيئة جيدة لإدارة الكم الهائل من البيانات المكانية ضمن مكان واحد يسهل التعامل معها وتحديثها .لذا من الضروري تطوير ثقافة إدارة المشاريع الإنشائية والاستفادة من الطرق والأساليب و التقنيات الحديثة في محاولة للالحاق بركب التطور الحاصل في مجال التشييد في العالم.