research centers


Search results: Found 2

Listing 1 - 2 of 2
Sort by

Article
Development of an Integrated Construction Management System for Building Estimation

Authors: Sawsan Rasheed Mohammed --- Ehab Fadhil Mohammed Ali
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2012 Volume: 18 Issue: 9 Pages: 999-1013
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and duration of tasks, then exported to MS Project and MS Excel. The system was developed by using Visual Basic and ActiveX automation technology for combining the above software. The system, also, can calculate quantities of materials. The system includes digitizer (on-screen takeoff) calculates the lengths and areas of the drawings to which the form of an image and scanned. The integrated system has been applied to case study, a storages building for hospital 260 beds. The results proved the effectiveness of the system for the conversion of information from the graphical form dwg to numerical formulas xlcx / xlc and mpp can be handled easily pleased and software are covered.

ا تزال إدارة المشاريع تعتمد التبادل اليدوي للمعلومات و بالاستناد على الوثائق الورقية. حيث يتم رسم الخرائط و المخططات التصميمية بمساعدة الحاسوب ,CAD لكن البيانات المطلوب ادخالها لبرامجيات إدارة المشاريع لا يمكن استخراجها مباشرة من CAD بل يجب ادخالها يدويا من قبل المستخدم. ان عملية أخذ و تجميع المعلومات من المخططات التصميمة و ادخالها في برامجيات ادارة المشاريع تحتاج الى جهد و وقت مع احتمال حدوث اخطاء في نقل و ادخال المعلومات. هذا البحث يقدم نظاما حاسوبيا متكاملا لمشاريع المباني حيث يقوم باستخلاص و استيراد الكميات عن طريق ترجمة مخططات AutoCAD مع قاعدة بيانات MS Access بالكلف و الانتاجيات لحساب الاسعار و المدد الزمنية للفعاليات ثم تصديرها الى برامج MS Project و MS Excel. تم تطوير النظام بأستخدام Visual Basic و تقنية أتمتة ActiveX لربط البرامج اعلاه. بالاضافة الى حساب كميات المواد , يتضمن النظام Digitizerلحساب الاطوال و المساحات للمخططات التي تكون بصيغة صورية. تم تطبيق النظام المتكامل على دراسة حالة لبناية مخازن لمستشفى 260 سرير. اثبتت النتائج فعالية النظام في تحويل المعلومات من صيغتها الرسومية dwg الى صيغ عددية xlcx / xlc , mpp يمكن التعامل معها بسهولة و يسر بالبرامجيات المشمولة بها.


Article
Feed-Interval Scallop Height Estimation Using Multi-axis CNC Milling Machine
حســــــاب قيمة الارتفـــــاع التــــــموجي باتــــــجاه التغـــــذية باستخدام مــــكـــــــائن التــــحكم الرقمــــي المتعـــــددة المحــــاور

Loading...
Loading...
Abstract

This research presents a mathematical model of feed-interval scallop height, where in a machined surface there are two types of scallop height, the pick(path)-interval scallop and the feed-interval scallop. The pick-interval scallop is generated by the finite pick offset between the successive cutting paths, while the feed-interval scallop is generated by the finite increment between the successive tooth feeds. New model that describes and predicts the geometric generating mechanisms of the feed-interval scallop height have been derived using torus cutter which is commonly used in multi-axis milling machine. The machining parameters (effective tool cutter radius, feed per tooth and the magnitude of tool axis inclination angles) have been considered in theoretical and experimental work to study the effect of these parameters on this type of scallop height. From theoretical and experimental work it was found that at high-speed machining, the feed-interval scallop is more important to the surface roughness than the path-interval scallop, and the feed-interval scallop is very sensitive to the tool-axis inclination angle. The feed-interval scallop height decreased sharply and quickly within a few degrees of the tool-axis inclination to the normal workpiece surface. In general, an inclination angle equal to is good enough for all tool diameters used in the present work, namely (6,8,10 12 mm).

في هذا البحث تم اشتقاق المعادلات لبناء موديل رياضيَ يمكن من خلاله حساب قيمة الارتفاع التموجي باتجاه التغذية، حيث أن هناك نوعان من الارتفاعات التموجية، الأول يسمى الارتفاع التموجي باتجاه مسار العدة والأخر يسمى الارتفاع التموجي باتجاه تغذية العدة، ويتكون الأول نتيجة الحركة لعدة القطع بين موقعين متتاليين باتجاه مسار العدة أما الثاني فيتكون نتيجة الحركة لعدة القطع ما بين موقعين متتاليين باتجاه التغذية، تم وصف هذا النوع من الارتفاعات باستخدام العدة (Torus) والذي يستخدم بصورة شائعة في مكائن التفريز المتعددة المحاور، كذلك تم دراسة تأثير بعض من متغيرات القطع على قيمة هذا النوع من الارتفاعات مثل ( نصف القطر الفعال للعدة، نسبة التغذية لكل سن قاطع وقيمة زاوية ميلان العدة) حيث تم تغيير قيم تلك المتغيرات نظريا وعملياً لمعرفة تأثيرها على قيمة الارتفاع التموجي باتجاه التغذية. تبين من خلال الجانب النظري والجانب العملي للبحث الحالي وعند قيم سرع قطع عالية، أن قيمة الارتفاع التموجي باتجاه التغذية أهم من قيمة الارتفاع التموجي باتجاه مسار العدة نسبة إلى الخشونة السطحية للسطح المشغل. كذلك وجد أن قيمة الارتفاع التموجي باتجاه التغذية تتأثر بصورة كبيرة بقيمة زاوية ميلان العدة، حيث لوحظ أن قيمة هذا النوع من الارتفاعات تقل بصورة واضحة وسريعة نسبة إلى التغير البسيط في قيمة زاوية الميلان، وبصورة عامة وجد من خلال البحث أن قيمة زاوية الميلان والمساوية إلى هي أفضل قيمة يمكن من خلالها الحصول على اقل قيمة للارتفاع التموجي باتجاه التغذية لكل أقطار العدة المستخدمة خلال البحث الحالي.

Listing 1 - 2 of 2
Sort by
Narrow your search

Resource type

article (2)


Language

Arabic and English (2)


Year
From To Submit

2012 (2)