research centers


Search results: Found 10

Listing 1 - 10 of 10
Sort by

Article
Life-Cycle Cost Analysis for Three Different Types of A/C Systems Applied on an Apartment Located in a Multi-Floors Residential Tower in Mosul City
تحليل كلفة العمر الافتراضي لثلاث منظومات مختلفة لتبريد وتكييف الهواء لشقة متواجدة في برج سكني متعدد الطوابق في مدينة الموصل

Author: Badran Mohammed Salim
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2014 Volume: 32 Issue: 9 Part (A) Engineering Pages: 2134-1147
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

This research studies the life cycle cost analysis using detailed cooling and electrical load profiles to calculate initial and running costs to evaluate the economic feasibilities of three different types of air conditioning systems as residential air conditioning system (RACs), commercial air conditioning system (CACs) and multi power air conditioning system (MPACs). The present-worth cost method for life-cycle cost period for ten (10) years analysis is applied to a sample building located in Mosul city / Iraq so as to select the best air conditioning system. The cooling load temperature differential with cooling load factor (CLTD/CLF) was used with hourly analysis program (HAP v4.6) for the estimation cooling load in each room of apartment.The results showed that the RAC system is lower than CAC and MPAC systems in initial cost approximately 53% and 67% respectively and the running cost for CAC system is lower than RAC and MPAC systems approximately 12% and 7% respectively for one month. The the total cost for two systems RAC and CAC are equal after 20 months of the beginning run and after even break point (BEP) the total cost for CAC system began to decline which indicates there is save in electric consumption and present worth cost over a period of (10) ten years after operation interval. The CAC system uses duct always to distribute air into each condition zone, therefor this system gives less noise of air distribution with best interior aesthetic appearance so that it fits with the interior decoration for each rooms of apartment. The outdoor unit of CAC system doesn’t appearance because the system working for long distances and can put outdoor units on the roof of the building.

يتضمن البحث الحالي تحليل كلفة العمر الافتراضي لثلاث منظومات مختلفة لتبريد وتكييف الهواء وكانت على النحو التالي منظومة تبريد وتكييف منزلية ومنظومة تبريد وتكييف تجارية ومنظومة تبريد وتكييف متعددة الاحمال حيث تم دراسة الكلفة الاولية والكلفة التشغيلية للمنظومات المختلفة بالاعتماد على مخطط الاحمال الحرارية والاحمال الكهربائية لنموذج شقة سكنية تقع في برج متعدد الطوابق في مدينة الموصل / العراق ، تم أعتماد طريقة فرق درجات حرارة مع عامل تصحيح حمل التبريد (CLTD/CLF) وبرنامج تحليل الساعات (HAP) أصدار (4.6) من شركة كاريير لحساب احمال التبريد الخاصة بالشقة السكنية. تم ملاحظة أن منظومة التبريد والتكييف المنزلية (RACs) تكون كلفتها الاولية اقل بمقدار 53% عن منظومة التبريد والتكييف التجارية (CACs) و67% عن منظومة التبريد والتكييف متعددة الاحمال (MPACs) وأن الكلفة التشغيلية لمدة شهر واحد فقط لمنظومة التبريد والتكييف التجارية هي أقـل من منظومة التبريد والتكييف المنزلية ومنظومة التبريد والتكييف متعددة الاحمال بمقدار 7% و 12% على التوالي، كذلك تم استنتاج أن منظومة التبريد والتكييف التجارية هي أفضل من ناحية الكلفة الكلية (المتمثلة بالكلفة الاولية والتشغيلية) لمدة تشغيلية مقدارها (10) عشر سنوات وأنه بعد مرور ((20 شهر من التشغيل الاولي للمنظومات الثلاث سيحدث تطابق في قيم الكلف الكلية لمنظومتي التبريد والتكييف التجارية والمنزلية وبعد تجاوز نقطة التطابق (EBP) سيتم عمل منظومة التبريد والتكييف التجارية مع ربح من ناحية الكلفة التشغيلية على مدار السنوات المتعاقبة وهذا يمثل الربح في اختيار هذا النوع من المنظومات الثلاث، فضلا عن ان منظومة التبريد والتكييف التجارية تستخدم مجرى هوائي دائماً لتمرير الهواء من الوحدة الداخلية وصولاً الى الحيز المراد تكييفه وبالتالي سيتم التحكم من خلال تصميم المجرى الهوائي بمقدار الضوضاء التي يصدرها الهواء الخارج من موزع الهواء لكل حيز مع وجود تناسق كبير بين اشكال والوان موزعات الهواء التي ستكون ملائمة مع التصميم الداخلي لكل حيز. إن منظومة التبريد والتكييف التجارية (CACs) تعمل لمسافات طويلة وبذلك سيكون من السهل جداً وضع الوحدة الخارجية على سطح البرج السكني وبالتالي المحافظة على المظهر الخارجي للبرج السكني .


Article
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
موديل رياضي لأمثلية الوقت والكلفة الانشائية بأستخدام امثلية مستعمرة النمل

Authors: Mohammed Nooruldeen Azeez --- Angham Alsaffar
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2014 Volume: 20 Issue: 1 Pages: 114-131
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities. In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm.

ان الوقت والكلفة هي اهم العوامل المأخوذة في تخطيط اي مشروع، في اختصاص ادارة المشاريع الانشائية. وان العلاقة بين الوقت والكلفة معقدة. فأن الكلفة الكلية في اي مشروع تمثل مجموع الكلف المباشرة وغير المباشره، وتمثل الكلف المباشره كلف العمالة والمواد والمعدات ، الخبينما الكلف غير المباشره تمثل بصورة عامة مصاريف الاشراف و الاداريات والاستشارية اضافة الى الفوائد.الكلف المباشرة تزداد بنسبة كلما طال عمر المشروع عن عمره المقرر ، بينما الكلف غير المباشره تستمر طيلة عمر المشروع وان اي تقليل في مدة المشروع عن المدة المحددة تعني تقليل الكلف غير المباشره ، لذا فان هنالك مقايضة بين الكلفة والوقت في اكمال الفعاليات الانشائية.في هذا البحث ، سوف يتم انشاء موديل لحساب امثلية الوقت-الكلفة الانشائية. توليد حلول مثلى عالمية للوقت والكلفة, تقليل الوقت والكلفة بأستخدام طريقة مستعمرة النمل.


Article
“ Techniques of the strategic cost management ”
" تقنيات إدارة الكلفة الإستراتيجية

Authors: Haydar sh. Noory حيدر شاكر نوري --- Mhmood h. jmaa محمود حسن جمعة
Journal: Journal of Research Diyala humanity مجلة ديالى للبحوث الانسانية ISSN: 1998104x Year: 2014 Issue: 63 Pages: 345-384
Publisher: Diyala University جامعة ديالى

Loading...
Loading...
Abstract

This research Management of strategic cost deals with the basic concepts (cost concept, strategic cost, cost management applications, decision make process and strategic cost analysis, strategic cost), as well as important techniques of the least andthe strategic cost management (activity based costing systems, activity based management, product life cycle costing, target costing, value chain analysis, business reengineering process , benchmarking, just in time, total quality management, balanced scorecard, theory of constraints, mass customization), the research found set of conclusions, one of the most important thinks was that techniques of the strategic cost management does not lead only to achieve savings in cost but even to achieve the rest of the critical factors of success ( quality, customer satisfaction ,innovation and learning. the research concluded with many suitable recommendations.

يتناول هذا البحث المفاهيم الأساس لإدارة الكلفة الإستراتيجية (الكلفة والكلفة الإستراتيجية وتطبيقات إدارة الكلفة وعملية اتخاذ القرار وتحليل الكلفة الإستراتيجيةوإستراتيجية الكلفة الأقل)، فضلاً عن أهم تقنيات إدارة الكلفة الإستراتيجية (نظم المحاسبة المستندة على النشاط والإدارة المستندة على النشاط ونظام تحديد تكلفة دورة حياة المنتج ونظام تحديد الكلفة المستهدفة وتحليل سلسلة القيمة وعملية إعادة هندسة الأعمال والمقارنة المرجعية ونظام الإنتاج في الوقت المحدد وإدارة الجودة الشاملة وبطاقة الأداء المتوازن ونظرية القيودوالإيصاء الواسع)، وتوصل البحث إلى مجموعة استنتاجات، مفادها إن استخدام تقنيات إدارة الكلفة الإستراتيجية لا يؤدي إلى تحقيق وفورات في الكلفة فقط ، وإنما يمتد أثرها ليشتمل على تحقيق باقي عوامل النجاح الحرجة والمتمثلة بالجودة، ورضا الزبون، والإبداع والتعلم، وإنتهى البحث بمجموعة من التوصيات المناسبة.المصطلحات الرئيسة في البحث: الكلفة ، إدارة الكلفة الإستراتيجية، التكاليف المستندة على النشاط ، الإدارة المستندة على النشاط ، نظام تكلفة دورة حياة المنتج ، نظام الكلفة المستهدفة ، تحليل سلسلة القيمة ، عملية إعادة هندسة الأعمال ، المقارنة المرجعية ، نظام الإنتاج في الوقت المحدد ، إدارة الجودة الشاملة ، بطاقة الأداء المتوازن ، نظرية القيود .


Article
Analyzing 6Vs of Big Data using System Dynamics
استخدام دينامكية النظام في تحليل 6Vsلتضخم البيانات

Authors: Alla Talal Yassin allatalal@yahoo.com --- Eaesha Hamoudy
Journal: journal of kerbala university مجلة جامعة كربلاء ISSN: 18130410 Year: 2014 Issue: المؤتمر العلمي الثاني لكلية العلوم Pages: 75-83
Publisher: Kerbala University جامعة كربلاء

Loading...
Loading...
Abstract

Big Data is not just about lots of data, it is actually a concept providing an opportunity to find new insight into the existing data as well guidelines to capture and analysis future data. This paper deals with the Big data ideas, which is refers to data sets whose size is beyond the ability of commonly used softeware tools to capture,manage , and process the data within a tolerable elapsed time. In this paper we design a System Dynemic (SD) model for the 6Vs analyzing which is the key characteristics of Big data .finally we illustrate some cost examples for the object.

تضخم البيانات لا يعني الكم الهائل من البيانات ، هو مفهوم لفرص ايجاد مرشد للبيانات الموجودة لتحليلها في المستقبل . والبحث يعنى بمسالة القدرة على استخدام ادوات البرامجيات لادارة عمليات البيانات في وقت الاجراء. ويقدم البحث فكرة تضخم البيانات ويشير الى الحجم والقدرة والعمليات الاجرائية . واستعرض في البحث تصميم انموذج باستخدام ديناميكية النظم لــ 6Vs والتي تعد مفتاح خواص تضخم البيانات ، و اخيرا تم عرض بعض الامثلة حول كلفة موضوع البحث .

Keywords

Big Data --- 6Vs --- System Dynemic --- cost


Article
Effect Of Replacing Calcium Powder By Limestone On The Economic Feasibility Study Of Fattening Iraqi Calves Project

Author: Y.M.Kassim
Journal: Kufa Journal for Agricultural Sciences مجلة الكوفة للعلوم الزراعية ISSN: 20727798 23128186 Year: 2014 Volume: 6 Issue: 2 Pages: 70-82
Publisher: University of Kufa جامعة الكوفة

Loading...
Loading...
Abstract

In order to arrive at higher revenue and achieve high profitability earnings benefit ofinterested breeders and researchers. This study was conducted in the private farm (Bartala station for Animal Production) in Nineveh province. Twenty-four (males) calves (Aljenobi strain) with aged 8-9 months were fed four fattening diets similar level ofcrud protein and energy metabolize but different in level ofcalcium in fattening diets. Animals got roughage feed by daily grazing for a six hours per day until final fattening experiment (120 days).The average initial weight ofcalves were 115.500, 115.330, 115.833, 115.166 kg respectively. Calves were distributed randomly into four treatments (0, 0.50, 1.00, 1.50% calcium powder) six calves for each treatments. The results showed an improvement in average ofweight gains for the last three treatments compared to the first treatment (control diet) and an increase in amount offeed intake as calcium level increased. Also the results showed a presence ofa slight mathematical increase in total cost ofthe fattening process by increasing calcium levels. The average total cost were 4.880.200,5.058.344,5.177.908,5.275.332 Iraqi diners for four treatments respectively. While the results ofthis study indicated revenues to achieve profitability by high percent when increasing calcium levels from 0% in the first treatment to 0.5,1 and 1.5% levels in experimental fattening diets ofcalves during fattening experience period where total income received for fattening project to 3.855.800,4.237.336,4.844.852,5.044.668 Iraqi dinars for four treatments respectively. This increase in revenue fattening experience has contributed positively to maximize the percentage ofnet profit in revenues offattening farm to 79.01,83.77,93.57,95.63% for four treatments respectively.


Article
Designing system cost for water pollution plants in mayoralty of Baghdad
تصميم نظام تكاليف لمحطات تصفية المياه في أمانة بغداد

Authors: بهاء حسين محمد --- محمد كريم حميد
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2014 Volume: 20 Issue: 77 Pages: 359-388
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

There is an increase in the need for cost accounting in all organizations and from different sectors to provide detailed information to the totals of financial accounting, first and help solve problems associated with inventory and analysis, tabulation and allocation of cost elements II and do the planning process and provide the necessary oversight and help to take the right decisions such as pricing decisions that need to Information cost accounting.And suffer most of the non-governmental organizations from the lack of a cost accounting system provides information on the cost of service in these organizations and the department research sample circle vitality received financial statements of broad interest from various government agencies, the community and even international The cost of access to safe drinking water is one of the vital issues for these entities.The research was to design the system costs a special water purification plants to develop the work of this department and to achieve the goals set forth in the law and meet the requirements of international organizations and the need of the circuit itself. It was in this research compared the cost per square meter of water between that which is calculated in a manner total (by dividing all expenses during the year on the production of water or sold during the same year), however, which was calculated according to the scientific origins of cost accounting.The most important conclusions of the research that he is no longer any reports forcost accounting since the establishment of a special section of it, has not been preparing the trial balance for the year 2013. , And separation of the production costs for marketing costs and administrative kills to reduce the costs of non-value per unit neither of economic nor to the public the beneficiary of these services.That deviates from cost centers to objectively kills Tdid fairer costs and thus does the responsibility of accounting systems, monitoring and evaluation of performance.The most important recommendations, the development of cost accounting system and its reliance on cost allocation activity and identify activities that adds value from those that do not add value and reduce costs and develop the work of the department.

هناك زيادة في الحاجة لمحاسبة التكاليف في كافة المنظمات وعلى اختلاف قطاعاتها إلى توفير المعلومات التفصيلية لإجماليات المحاسبة المالية أولا والمساعدة في حل المشكلات المرتبطة بحصر وتحليل وتبويب وتخصيص عناصر التكاليف ثانياً والقيام بعملية التخطيط و توفير الرقابة اللازمة والمعاونة باتخاذ القرارات السليمة مثل قرارات التسعير والتي تحتاج الى معلومات محاسبة التكاليف.وتعاني اغلب المنظمات الحكومية من عدم وجود نظام لمحاسبة التكاليف يقدم معلومات عن كلف تقديم الخدمة في هذه المنظمات والدائرة عينة البحث دائرة حيوية تلقى بياناتها المالية اهتمام واسع من مختلف الجهات الحكومية والمجتمع وحتى الدولية فكلفة الحصول على الماء الصالح للشرب تعتبر من القضايا الحيوية لهذه الجهات. وجاء هذا البحث لتصميم نظام تكاليف خاص بمحطات تصفية المياه لتطوير عمل هذه الدائرة ولتحقيق الأهداف المنصوص عليها في قانونها وتلبية للمتطلبات من المنظمات الدولية وللحاجة من الدائرة ذاتها . وتم في هذا البحث مقارنة كلفة المتر المربع الواحد من الماء بين ذلك الذي يتم احتسابه بطريقة إجمالية ( من خلال قسمة كل النفقات خلال العام على الإنتاج او المباع من الماء خلال ذات السنة ) مع ذلك الذي تم احتسابه وفقا لمحاسبة التكاليف بأصولها العلمية . واهم استنتاجات البحث انه لم تعد اية تقارير كلفوية منذ إنشاء قسم خاص به ، ولم يتم إعداد ميزان المراجعة لعام 2013 .وان فصل تكاليف الإنتاج عن التكاليف التسويقية والإدارية يودي الى تخفيض تكاليف غير ذات قيمة للوحدة الاقتصادية ولا الى الجمهور المستفيد من هذه الخدمات .ان تحديد مراكز التكاليف بشكل موضوعي يودي الى تحديد أكثر عدالة للتكاليف وبالتالي يفعل من نظم محاسبة المسؤولية والمراقبة وتقييم الأداء . إما أهم التوصيات فان تطوير نظام محاسبة التكاليف واعتماده على تحديد كلف النشاط وتحديد الأنشطة التي تضيف قيمة من تلك التي لا تضيف قيمة ولتخفيض التكاليف وتطوير عمل الدائرة.


Article
Effects of MaterialsProperties on Strength and Deflection of Optimized R.C. Beams: Genetic Algorithms
تأثير خصائص المواد على مقاومة وانحراف العتبات الخرسانية المسلحة ذات التصميم الأمثل:طريقةالخوارزميات الجينية

Authors: Salim T. Yousif سالم طيب يوسف --- Rabi' M. Najem ربيع مؤيد نجم
Journal: AL Rafdain Engineering Journal مجلة هندسة الرافدين ISSN: 18130526 Year: 2014 Volume: 22 Issue: 5 Pages: 149-165
Publisher: Mosul University جامعة الموصل

Loading...
Loading...
Abstract

The Genetic Algorithms GAs, which is a powerful procedure of finding the optimum solution for constraints optimization, was used to find the optimum cost of reinforced concrete beams subjected to flexural constraints, with the limitations for section dimensions and steel reinforcement ratio according to the ACICode 2011.After designing the sections optimally, a non linear analysis was carried out to check the capacity of the designed section, and to find out the effect of the materials properties on the beam's deflection. Eight node degenerated shell elementsare used to represents the beam in the analysis procedure;ten layers were used to represent the concrete through the optimum section and one layer to represent the steel reinforcement.It was foundfrom the results that the materials properties affect the optimal designed sections in a way that the response of these sections towards strength and deflection, should be taken into consideration through designing the beams, if optimal design is required which was affected by about 5 – 19 %.

تعتبر طريقة الخوارزميات الجينية من أهم الطرق المستخدمة لإيجاد التصميم الأمثل لمسائل الامثلية المحددة، وتم استخدامها في هذا البحث لإيجاد التصميم الأمثل للكلفة للعتبات المعرضة لمحددات الانحناء من أبعاد المقطع ونسبة حديد التسليح بموجب متطلبات الكود الأمريكيACI code 2011.بعد إيجاد التصميم الأمثلللعتبات باستخدام هذه الطريقة، يتم تحليلها لا خطياً للتأكد من قابلية تحمل المقطع المصمم للأحمال المسلطة عليه. ولهذا الغرض تم تمثيل العتبات باستخدام أجزاء قشرية ثمانية العقد بعد تقسيمه إلى عشر طبقات لتمثيل الخرسانة وطبقة واحدة لتمثيل حديد التسليح.تم التوصل من النتائج إلى أن خصائص المواد المستخدمة في التصميم لها تأثير كبير على مقاومة المقطع وانحرافه نتيجة تأثير الأحمال المسلطة عليه، ويجب أخذها بنظر الاعتبار في حالة الحاجة الى التصميم الأمثل والذي تأثر بنسبة تتراوح مابين 5 – 19 %.


Article
Optimum Cost Design of Reinforced Concrete Columns Using Genetic Algorithms
تصميم الكلفة الأمثل للأعمدة الخرسانية المسلحة باستخدام الخوارزميات الجينية

Authors: Rabi' M. Najem ربيع مؤيد نجم --- Dr. Salim T. Yousif د. سالم طيب يوسف
Journal: AL Rafdain Engineering Journal مجلة هندسة الرافدين ISSN: 18130526 Year: 2014 Volume: 22 Issue: 1 Pages: 112-141
Publisher: Mosul University جامعة الموصل

Loading...
Loading...
Abstract

The aim of this study is finding the optimum cost design of reinforced concretecolumns with all loading conditions (axially, uniaxially and biaxially loaded) using theGenetic Algorithms GAs. Many design constraints were used to cover all the reliabledesign results, such as limiting the cross sectional dimensions, limiting the reinforcementratio and even the behavior of the optimally designed sections.Each of the designed columns was handled by the GAs solver according to itsloading condition specifications. The load contour method was used to design the biaxialsections with the adjustment of the plastic centroid. A long column constraint wasintroduced to limit the design procedure with the short columns only. The optimumresults were compared with other published works, and a reduction in design cost of thebiaxially loaded columns of about 26 % was achieved using the GAs design methodwhile a small percent in the cost reduction( 1 – 3 % ) was achieved for the uniaxially designed sections, while 50% was the costsavings in the axially loaded columns. It was proved that the genetic algorithm iscapable for designing optimum columns sections despite the complex constraints thatcontrol the designing procedure

الهدف من هذه الدراسة هو إيجاد التصميم الأمثل للكلفة للأعمدة الخرسانية المسلحة تحت تأثير جميع حالاتالتحميل باستخدام الخوارزميات الجينية. تم استخدام العديد من محددات التصميم لتغطية اكبر عدد من الحلول المثلىلج ع ل ا لت ص م ي م ق اب لا ل لت ن ف ي ذ ، م ث ل ت ح د ي د أبعاد المقطع ونسبة حديد التسليح وحتى التحكم بطبيعة تصرف العمود بعدتصميمه تجاه الأحمال المسلطة عليه.لتصميم load – contour ت م ت ح د ي د ط ر ي ق ة ا لت ص م ي م لك ل ع م و د ت ب ع ا للأحمال المسلطة عليه، واستخدام طريقةالأعمدة المحملة بعزوم بالاتجاهين، مع تعديل المركز اللدن الخاص بالمقطع، واعتماد التصميم للأعمدة القصيرة فقطوفق محددات مسبقة.% وجرى مقارنة نتائج التصميم الأمثل م ع ن ت ائ ج م ن ش و ر ة م س ب ق ا . وتم الحصول على مقاطع أرخص بنسبة 623 % ( في حالة الأعمدة المحملة بعزم باتجاه واحد، – في حالة الأعمدة المحملة بعزم ثنائي المحور وبنسبة أقل ) 1بينما قلت الكلفة بنسبة 05 % ف ي ح ا لة الأ ع م د ة ا لم ح م لة م ر ك ز ي ا . وأثبتت طريقة الخوارزميات الجينية بقدرتها علىالتعامل مع مسائل على جانب من التعقيد كتصميم الأعمدة الخرسانية بوجود العديد من محددات التصميم


Article
Using Earned Value Method in Project Control Applied research
استخدام أسلوب القيمة المستحقة في الرقابة على تنفيذ مشاريع البناء دراسة حالة

Authors: عبد السلام لفتة سعيد --- خالد صبيح فرحان
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2014 Volume: 20 Issue: 80 Pages: 36-71
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

There is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.Earned Value Method is used in the project of building of Superior Judgment Council which executed by Al Mansour Company of construction contracts, long for about three years from 2010 to 2011 .Schedule of planned value, actual cost, and earned value have done to reach the control indices of Earned Value Method that are; Cost Variance, Cost Performance Index, Schedule Variance, Schedule Performance Index. Then monitor and analysis the performance of the project in aspect of cost and time ,thus the control of cost and time integrated to achieve the goals of project management .The study has reached several conclusions such as:In Al Mansour Company the cost control separated from time control of the project. The estimated cost and time have to be accurate in using Earned Value Method , and it's important to identify the percentage of executing work accurately .So as the results of control indices would be correct.

لاشك أن وظيفة الرقابة من الوظائف الإدارية المهمة التي تعتمد عليها إدارة المشاريع لمتابعة ومراقبة المشروع ,إذ أن الرقابة على المشروع تعد مكملة لوظيفة التخطيط في المشروع التي هي الأساس الذي تستند عليها الوظائف الإدارية من التخطيط والتنظيم والقيادة والرقابة. فبدون الرقابة على المشروع لا يمكن التأكد من أن خطة المشروع قد تم تنفيذها بشكل صحيح ضمن الموازنة الموضوعة والوقت المحدد في برنامج تقدم العمل , ولهذا تقوم إدارة المشروع بإتباع عدة طرائق أو أساليب رقابية لتحقيق أهداف المشروع المتمثلة بكلفة المشروع و وقت المشروع والمواصفات المطلوبة . ويعد أسلوب القيمة المستحقة احد الطرائق الرقابية في تنفيذ المشاريع من قبل الشركات العالمية المتطورة . وقد تم تطبيق أسلوب القيمة المستحقة في مشروع مبنى مجلس القضاء الأعلى الذي تم تنفيذه من قبل شركة المنصور العامة للمقاولات الإنشائية الذي استمر العمل فيه مدة ثلاث سنوات تقريبا من سنة 2010 ولغاية سنة 2012. إذ تم إعداد جداول القيمة المخططة والكلفة الفعلية والقيمة المستحقة لغرض الوصول إلى المؤشرات الرقابية لطريقة القيمة المستحقة وتلك المؤشرات:مؤشر تباين الكلفة ومؤشر أداء الكلفة ومؤشر تباين الجدولة ومؤشر أداء الجدولة التي من خلالها يمكن معرفة أداء المشروع من ناحية الكلفة والوقت وبهذا يتم تكامل الرقابة على الكلفة والوقت وهو الغاية المطلوبة لإدارة المشروع في تحقيق أهداف المشروع .وقد توصل البحث إلى مجموعة من الاستنتاجات أهما : عدم وجود ربط بين الرقابة على الكلفة والرقابة على وقت المشروع , وإنما توجد رقابة منفصلة للكلفة ورقابة منفصلة للوقت . أن تكون التقديرات الأولية لكلفة تنفيذ الأعمال (الموازنة ) دقيقة , ومطابقة للواقع السعري السائد في الأسواق المحلية , وتحديد نسب انجاز العمل الفعلية بدقة من قبل إدارة المشروع وعدم المبالغة فيها. واهم التوصيات هي تطبيق طريقة القيمة المستحقة في الرقابة على المشروع في احد المشاريع الجديدة في شركة المنصور العامة ,وتدريب كادر من المهندسين والمحاسبين في الشركة على استخدام طريقة القيمة المستحقة في الرقابة على المشروع.


Article
Impact of waste of time on the cost of the service
أثر الهدر في الوقت على تكلفة الخدمة

Loading...
Loading...
Abstract

The phenomenon of administrative and financial corruption of the dangerous phenomena confronting countries and particularly developing countries, are eating away at the body of in government expenditure, and so is waste the time under the concept of administrative corruption, And time wasted is not carefully enough by the researchers, therefore, aim to show the importance of time and the impact on the cost of the service provided in the Iraqi State as well as the relationship between corruption and waste in time and the reasons for such wastageOne of the most important findings of the research that the profile does not support administrative functions cause the waste of time and administrative corruption and backdoor compromising time and not exploited optimally lead to a rise in the cost of the service provided or the producing unit and perhaps lack of time due to the community's culture and religious belief, national weakness and of the most important recommendations of the research is to activate the control regime is not just talking about its existence, but its existence and influence as well as the activation of the system of incentives and rewards for employees who take advantage of the best time And dissemination of the culture of the time and that time must be effective resource utilization by the end.

تعد ظاهرة الفساد الإداري والمالي من الظواهر الخطيرة التي تواجه البلدان وعلى الأخص الدول النامية حيث أخذت تنخر في جسم مجتمعاتها بداية بالأمن وما تبعه من شلل في عملية البناء والتنمية , ومن أهم مظاهر الفساد هدر الوقت في الدوائر الحكومية والذي ينعكس بشكل هدر مالي ونعني بالهدر كل ما ينجم عنه زيادة في النفقات الحكومية , وبذلك يندرج الهدر في الوقت تحت مفهوم الفساد الإداري, والوقت المهدور لم يحظى بعناية واهتمام كافيين من قبل الباحثين ,ولذلك هدف البحث إلى بيان أهمية الوقت واثر ذلك على تكلفة الخدمة المقدمة في دوائر الدولة العراقية وكذلك العلاقة بين الفساد والهدر في الوقت وبيان أسباب هذا الهدر . ومن أهم الاستنتاجات التي توصل أليها البحث أن عدم اعتماد التوصيف الإداري للوظائف يسبب هدر في الوقت وفساد أداري مستتر وان التفريط في الوقت وعدم استغلاله بالشكل الامثل يؤدي الى ارتفاع في كلفة الخدمة المقدمة او الوحدة المنتجة وربما عدم الاهتمام بالوقت سببه ثقافة المجتمع و ضعف الوازع الديني والوطني ومن أهم توصيات البحث هو تفعيل نظام الرقابة ليس مجرد الحديث عن وجودها وحسب بل يكون وجودها فعليا ومؤثرا وكذلك تفعيل نظام الحوافز والمكافئات للموظفين الذين يستغلون الوقت أفضل استغلال ونشر ثقافة الحرص على الوقت والاحساس بان الوقت مورد نافذ يجب استغلاله قبل انتهاء اجله

Listing 1 - 10 of 10
Sort by
Narrow your search

Resource type

article (10)


Language

English (5)

Arabic and English (3)

Arabic (2)


Year
From To Submit

2014 (10)