research centers


Search results: Found 2

Listing 1 - 2 of 2
Sort by

Article
Estimating Electricity Generation from Wind Power by V82 at ThiQar – Iraq
تقدير الطاقة الكهربائية المنتجة من طاقة الرياح بواسطة في ذي قار-العراق V82

Author: Auday H. Shaban عدي حاتم شعبان
Journal: Ibn Al-Haitham Journal For Pure And Applied Science مجلة ابن الهيثم للعلوم الصرفة والتطبيقية ISSN: 16094042 Year: 2016 Volume: 29 Issue: 2 Pages: 60-69
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

One of the most demanded studies is wind turbine site assessment. It is difficult to build asimulation program because of the many variables that affect the wind speed and direction.The procedure of this research depend on two approaches, the Wind Atlas Analysis model andthe Inverse Distance Wait interpolation. These procedures give the estimated annual energyproduction for each turbine (V82) with 82m blades diameter at 70m hub heights. The outputat this location for each turbine is about (4.3 GWh). The studied area is about 20x20km2 andcould be plant at least 600 turbine and have about 2500 GWh of annual energy production.

واحدة من اكثر الدراسات المطلوبة هي انشاء محطات توربينات الرياح . ان بناء برنامج المحاكاة يعد من البرامجالصعبة نظرا لكثرة المتغيرات التي تؤثر في سرعة واتجاه الرياح. ان خطوات هذا البحث تعتمد على طريقتين هي تحليلهذه الخطوات سوف تحسب الانتاج السنوي للطاقة الكهربائية لتوربين .IDW نموذج اطلس الرياح وطريقة استيقاء.(4.3GWh) 70 ). ان الانتاج السنوي لكل توربين في هذه المنطقة بحدود m) 82 ) وبارتفاع m) وبقطر رئيسي (V82)2500 ) كانتاج سنوي. GWh) 20 ويمكن وضع 600 توربين على الاقل التي تنتج *20 Km ان المنطقة المدروسة بحدود

Keywords

wind power --- WAsP --- GIS --- GIS --- WAsP --- طاقة الرياح


Article
Roads Assessment for Wind Turbines Transfer to Maysan Provence - Iraq
تقييم الطرق لنقل توربينات الرياح لمحافظة ميسان - العراق

Author: Auday H. Shaban عدي حاتم شعبان
Journal: Iraqi Journal of Science المجلة العراقية للعلوم ISSN: 00672904/23121637 Year: 2016 Volume: 57 Issue: 3A Pages: 1867-1875
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Wind farm assessment project have several steps. This paper aim on the second step which is harvesting the roads properties from the loading point to the construction point. The difficulties of examining the roads whether they are appropriate or not for transporting wind turbine components. The selected site for establishing wind farm is located at Maysan province and has 262 km distance from Um – Qaser port. The results through applying remote sensing and GIS techniques on Landsat (30 m resolution) and QuckBird (0.6 m resolution) are summarized by (2 hard turn, 18 Bridges that crossing over, and 13 Bridges passing under).

مشروع تقييم مزارع الرياح يحتاج الى عدة مراحل. هذا البحث يحدد المرحلة الثانية والتي تمثل جمع خصائص الطرق التي تربط بين نقطة التحميل وصولا الى نقطة البناء. ان الصعوبات في اختبار الطرق فيما اذا كانت ملائمة ام غير ملائمة لنقل اجزاء توربينات الرياح. ان الموقع المختار لانشاء مزرعة رياح يقع في محافظة ميسان والذي يبعد 262 كم عن ميناء ام قصر. ان النتائج التي تم الحصول عليها بعد تطبيق تقنيات التحسس النائي ونظم المعلومات الجغرافية على صورة Landsat (بدقة 30 م) و QuckBird ( بدقة 0.6 م) تتلخص ب ( 2 استدارة قوية، 18 جسور يتم العبور فوقها، 13 جسر يتم العبور من تحتها).

Listing 1 - 2 of 2
Sort by
Narrow your search

Resource type

article (2)


Language

Arabic and English (1)

English (1)


Year
From To Submit

2016 (2)