Article
Development of Integrated Strategy for Managing Construction Sector in Iraq Project Management Maturity Models

Authors: Ibrahim A. Mohammad --- Faiq M. Sarhan Al-Zwainy --- Saja H. Raheem
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2016 Volume: 34 Issue: 6 Part (A) Engineering Pages: 1131-1141
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

A lot of construction projects fail to complete their processes according plans, leading to financial and technical problems. The paper tries to study the extent to which the application of best management practices will have a quantitative measurable effect on project success. The researcher developed a model to assess project management maturity for a sample study of the Iraqi ministry of construction and housing and public municipalities, then applied regression analysis to find the correlation of the maturity level of the cost, time management and the average project management processes maturity level and also deviation coefficient during the year (2007-2014).


Article
نجاح ادارة المشروع في ضوء خصائـص المنظمة المتعلمة بحث ميداني لاراء عينة من العاملين في الهيئة العامة للطرق والجسور

Authors: سلــوى هانـي السامرائي --- علي عبد الحسن دلي الحسناوي
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2016 Volume: 22 Issue: 88 Pages: 130-157
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The business environment witnessing multiple, rapid changes, and organizations work to find techniques , technology and adoption of concepts which enable it to keep pace with these changes and maintain its survival and growth and continuity, One of these concepts Is Project Management. The research aim to To ensure the projects management success are supposed to identify the factors by teste research variables contribute to it , The Learning Organization Characteristics in the Success Of The Project Management at the State Commission For Road and Bridge . In a community the size of (150) individual and total sample size (43) individual. Proceeding from the problem that has been reflected a number of questions that tries to find the answer ,Premise was planned for the development of research and the formulation of hypotheses and effect link It is the most important of the main hypothesis of the link between learning organization characteristics and the success of Project Management The main effect hypothesis, which states that there is the influence of the characteristics of the learning organization in the success of the project management. For the purpose of obtaining the results of answers researched analysis of the sample, Been using a set of appropriate statistical methods to the nature of the research and its variables, including the percentage table duplicates and the arithmetic mean, standard deviation and Pearson correlation coefficient and simple linear regression. In the light of the results of the answers to the research sample analysis was reached a set of conclusions and the most important of a correlation and effect relationship of significance for most of the organization properties in the success of the project management and accordingly, the most important recommendations is the need to direct the largest of the characteristics of learning organization to influence the success of the project management attention

تشهد بيئة الاعمال تغيرات متعددة ومتسارعة ، وتعمل المنظمات على ايجاد التقنيات والاساليب وتبني المفاهيم التي تمكنها من مواكبة هذه التغيرات والحفاظ على بقائها ونموها واستمرارها ، ومن هذه المفاهيم مفهوم ادارة المشروع . حيث يهدف البحث الى ضمان نجاح ادارات هذه المشاريع من خلال تحديد العوامل التي تسهم في ذلك عن طريق اختبار متغيري البحث الرئيسين ( خصائص المنظمة المتعلمة ونجاح ادارة المشروع ) بالهيئة العامة للطرق والجسور, في مجتمع ذو حجم (150) فرداً وعينة بلغ حجمها(43) فرد . انطلاقا من المشكلة التي تم تجسيدها بعدد من التساؤلات التي يحاول البحث الاجابة عنها ، وتم وضع المخطط الفرضي للبحث وصياغة فرضيات الارتباط والتأثير ومن اهمها فرضية الارتباط الرئيسة بين خصائص المنظمة المتعلمة ونجاح ادارة المشروع وفرضية التأثير الرئيسة التي تنص على ان هناك تأثير لخصائص المنظمة المتعلمة في نجاح ادارة المشروع. ولغرض الحصول على نتائج تحليل اجابات العينة المبحوثة , تم استخدام مجموعة من الاساليب الاحصائية المناسبة لطبيعة البحث ومتغيراته ومنها الوسط الحسابي والانحراف المعياري ومعامل ارتباط بيرسون والانحدار الخطي البسيط. وتم التوصل الى مجموعة من الاستنتاجات في ضوء نتائج تحليل اجابات عينة البحث واهمها وجود علاقة ارتباط وتأثير ذات دلالة معنوية لأغلب خصائص المنظمة في نجاح ادارة المشروع وعلى وفق ذلك فان اهم التوصيات هي ضرورة توجيه اهتمام اكبر لخصائص المنظمة المتعلمة لتأثيرها في نجاح ادارة المشروع .


Article
PROJECT MANAGEMENT OF BALAD`S MAJOR SEWERAGE SYSTEM BY USING THE GOAL PROGRAMMING METHOD
ادارة مشروع مجاري بلد الكبير باستخدام أسلوب البرمجة بالأهداف

Authors: أمجد عباس عبد الرحيم البلداوي --- وقاص سعد خلف
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2016 Volume: 22 Issue: 93 Pages: 162-194
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve these projects in the determined time , added cost and technical specifications although the majority of these projects have been managed with predetermined time and financial resources limits , they still need some improved strategies and more careful calculation in their time and cost management. This project was chosen for the following reasons , The first reason is that the project is currently stopped, because of the security and financial circumstances in salahulddin province in particular .this is a great manage time and cost when the work is resumed , and the second reason is during the progress of the project, the until it was stopped, the completion percentage was behind what it was planned originally . this highlights the need to study how to avoid these delays in future using a scientific and logical method , and the third reason that the project has many variables that affect the progress, which are of great importance for scientific and mathematical methods . To achieve this purpose the project was studied using modern scientific and mathematical methods , which are the curved part method (CPM) for project's real and accelerated timing the Primavera V6 software and the AutoCAD 2015 software . the goal is to benefit from these methods and software to establish a new work schedule for the project . Due to the project's various and clashed (in sometimes) objectives that are have to be accomplished in a limited time , it is very important to be careful and accurate with making the right time . It was highly needed to use an efficient mathematical model that work with all these variables in the limited time allowed and according to their priorities . This mathematical method is called the Goal Programming for multi-objective mathematical models

يعد مشروع مجاري بلد الكبير احد اكبر المشاريع التي هي قيد الانجاز في محافظة صلاح الدين ضمن خطة تنمية الاقاليم للعام 2013 , فهو مشروع ضخم يسير باتجاهين الاول مد الشبكات و الثاني انشاء محطات الرفع وللمحورين ( الثقيل والمطري ) , والتي تسعى مديرية مجاري صلاح الدين تنفيذه لخدمة اربعة احياء في قضاء بلد . إن من أهم التحديات التي تعيق ادارة المشاريع اليوم هي التأكد من انجاز تلك المشاريع في وقتها المحدد , وكذلك الكلفة و المعاير الفنية المحدد ايضا , وعلى الرغم خضوع اغلب هذه المشاريع لقيود محددة ( محددات ) تتعلق بالوقت واخرى تتعلق بالموارد المالية المخصصة للمشروع لذا فأن موضوع الوقت والكلفة في ادارة اي مشروع يحتاج الى حسابات دقيقة لهما . وقد تم اختيار هذا المشروع للدراسة لعدة اسباب مهمة , السبب الاول : إن المشروع متوقف حاليا بسبب الظروف الامنية والمادية في صلاح الدين على وجه الخصوص , وهذا دافع كبير لدراسة كيفية التعامل مع وقت وكلفة انجازه في حال استأنف العمل به , والسبب ثانيا اثناء تنفيذ المشروع كانت هنالك انحرافات عن نسب الانجاز الفعلي , مما يدفع الى توفير دراسة وبأسلوب علمي ومنطقي لتجاوز هذه الانحرافات في المستقبل , اما السبب الثالث فهو إن المشروع يحتوي على الكثير من الانشطة مما يعطي اهمية كبيرة للأساليب العلمية والرياضية التي سوف تؤثر بشكل كبير في تنفيذ المشروع بأسلوب مدروس . لذا تمت دراسة المشروع من جديد وفقا لأساليب علمية ورياضية حديثة , اختيار اسلوب المسار الحرج (CPM) بوصفه احد اساليب الادارة العلمية للمشاريع لإيجاد وقت انجاز المشروع الطبيعي والتعجيلي , وبما ان لإدارة هذا المشروع اهداف متعددة تسعى الى تحقيقها في مدة زمنية محددة , الامر الذي يتطلب الكثير من الدقة في الوصول للقرارات المناسبة , فكان من الاجدر استخدام اسلوب رياضي كفوء لبناء نموذج رياضي متعدد الاهداف يعمل مع جمــيع هذه المتغـيرات في المدة الزمنية المحددة وبحــسب اولوياتهــا وتسمى البرمجة الهدفية ( (Goal Programming , وكذلك تم استخدام بعض البرامج الجاهزة لرسم الشبكة كبرنامج (Primavera V6 ) والبرنامج الهندسي المعروف (AUTO CAD 2015 ) , وبرنامج (Win QSB) لحل الأنموذج متعدد الاهداف , ومحاولة الافادة من مميزات هذه البرامج في جدولة المشروع .