Cost Management and Planning in Construction Projects
أدارة وتخطيط الكلفة في مشاريع التشيد

Authors: زهير ميخائيل ساكو --- مرفت رزاق ولي الطائي
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2009 Volume: 15 Issue: 4 Pages: 785-799
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

This research aims at emphasizing the significance of sound management and cost planning from the beginning of the project undertaking in order to facilitate the proper establishment for conducting and systemizing the project costs. Also, to determine the major obstacles that affect the management and scheduling of construction costs and to suggest solutions through demonstrating the roles of the parties involved in the project. According to the preliminary information, data, and exploratory readings collected about this matter, the research hypothesis is formulated as follows:-" In fact, there is a critical need to determine the proper fundamentals of cost conduct and planning according to a sound clear system, taking into account what is currently applied and followed in order to assess these procedures and improve them as mach as possible."In order to meet the aims of this research, a scientific methodology is pursued in :- - the presentation and review of most the local and international references that are directly relevant to the research, and aided by reports and articles from the internet from websites of engineering facilities of relevancy.- the case study for five projects. which are currently under construction in Iraq, analyzing them thoroughly in order to point out about their positive and negative aspects.- the open questionnaire and the regular closed questionnaire forms based on the data and information collected through the theoretical review and the open questionnaire to conclude and examine some concepts concerning the actual management status of cost planning.The research hypothesis has proved to be workable. Thus, it was possible to define the major obstacles that affect the process of construction cost management and planning; also, to suggest an appropriate plan for cost management and planning using a formula that facilitates the process of establishing and conducting all the details of construction cost to handle the weakness points on time, and to be able to propagate for cost management and planning and to inform the relevant parties or beneficiaries about how to take the proper decisions according to modern methods.

يهدف البحث الى تأكيد أهمية إتباع الإدارة السليمة والتخطيط المحكم للكلفة منذ بداية إقرار المشروع الإنشائي لتسهيل مهمة وضع الاسس الصحيحة لمتابعة وضبط كلفة المشروع.بالإضافة الى تحديد المعوقات الأساسية التي تؤثر على عملية ادارة وتخطيط الكلفة الإنشائية ومحاولة تقديم مقترحات حلول لها من خلال توضيح دور الأطراف المشاركة في العملية الإنشائية . واستنادا الى المعلومات الأولية والقراءات الاستطلاعية والبيانات التي تم جمعها والتي كانت عن هذا الموضوع،فقد تم صياغة فرضية البحث كما يأتي:-"ان واقع الحال يؤشر الحاجة الملحة لتحديد الاسس الصحيحة في ادارة وتخطيط الكلفة في تنفيذ المشاريع ضمن منهاج واضح وسليم والاخذ بنظر الاعتبار ماهو معمول به حاليا من اجل تقييم هذه الاسس وتطويرها قدر الامكان".من اجل تحقيق أهداف البحث،فقد تم إتباع منهجية علمية للبحث تضمنت مايلي:-1- استعراض معظم المصادر المحلية والعالمية ذات الصلة المباشرة بموضوع البحث لغرض الوقوف على احدث التقنيات الادارية والتخطيطية الخاصة بكلف التشييد ومتابعتها والسيطرة عليها،كما تمت الاستعانة بتقارير ومواضيع منشورة عبر الانترنيت لمواقع بعض الجهات الهندسية ذات العلاقة بموضوع البحث.2- دراسة حالة لخمس من مشاريع التشييد قيد الانشاء حاليا في العراق.تم تحليل تلك المشاريع من اجل الوقوف على الجوانب السلبية والايجابية المتعلقة بموضوع البحث.3- القيام باستبيان مفتوح وتحليله ثم تصميم استمارة الاستبيان المغلق النظامية بالاعتماد على ما جمع من بيانات ومعلومات من خلال الدراسة النظرية والاستبيان المفتوح ،للتعرف والتحقق من بعض الامور المتعلقة بواقع ادارة وتخطيط الكلفة في مشاريع الشييد في ظل المتغيرات الكثيرة التي اثرت عليها.كنتيجة للخطوات المتبعة في تطبيق هذه المنهجية فقد تم التوصل الى اثبات فرضية البحث.وانطلاقا من هذه الفرضية فقد تم اقتراح خطة علمية مناسبة لادارة وتخطيط الكلفة بصيغة تسهل من عملية متابعة وضبط الكلفة الإنشائية لكافة تفاصيل المشروع الانشائي من اجل معالجة نقاط الضعف في وقتها المناسب. يهدف البحث ايضا الى نشر ثقافة ادارة وتخطيط الكلفة واتخاذ القرارات المناسبة وفقا للاساليب الحديثة في اوساط الاطراف ذات العلاقة بذلك.


Article
بناء نظام اداري لتسعير الفعاليات في العقود الانشائية باعتماد هيكلية تجزئة العمل في قطاع المباني في العراق

Authors: زهير ميخائيل ساكو --- حاتم خليفة العجيلي --- حسن كمال محسن الحلي
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2011 Volume: 17 Issue: 5 Pages: 212-232
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The research hypothesis depends on the existence of a general phenomenon in the contracts business of the contractors represented in the fact that the actual costs of the contracts expended during the execution period exceed the estimated costs of the constructive contracts in the tender presentation phase , resulting in a financial shortage and economic problems for the contractors. The research has adopted the lifecycle of system building which goes through different phases: the problem identification, the problem analysis and the design of the proposed management system. To achieve this goal, both the standard local and international systems have been studied.Morover, the proposed management system has been programmed in accordance with the various computer programmes so that all of them form a developed computer program used for pricing the various activities of the construction contracts.A faster and more accurate program that is also characterized by being simple, scientific,efficient and easily used by the contactors. It is also flexible enough for being developed and adjusted to future changes. Furthermore, it depends on work breakdown structure and agrees with the united standard guide of quantity survey for civil engineering works

تعتمد فرضية البحث على وجود ظاهرة عامة في إعمال المقاولات لدى المقاولين وهي تجاوز الكلف الحقيقية المصروفة خلال مرحلة التنفيذ عن الكلف التخمينية للمقاولات الإنشائية في مرحلة تقديم العطاء مما يسبب العجز المالي والمشاكل الاقتصادية للمقاولين.تبنى البحث دورة حياة بناء النظام التي تمر بمراحل مختلفة هي تحديد المشكلة وتحليلها وتصميم النظام الإداري المقترح.ولانجاز ذلك تم دراسة النظم العالمية والمحلية المعتمدة وبرمجة النظام الإداري المقترح بصيغة متناغمة مع بعض برامج الحاسوب الآلي المختلفة لتشكل بأجمعها برنامجا حاسوبياً مطوراً يستخدم لتسعير فعاليات عقود الانشاء المختلفة وليكون أكثر دقة وسرعة وعلمي وكفوء وبسيط يسهل على المقاولين استخدامه ويمتلك المرونة الكافية لغرض التطوير والتكيف مع المتغيرات المستقبلية يعتمد على هيكلية تجزئة العمل ويتوافق مع الدليل القياسي الموحد للمسح الكمي لإعمال المباني والهندسة المدنية


Article
A reformation Study about the Construction Management in the Primary Stage Curricula’s for the Civil Engineering in Some of the Iraqi Universities
دراسة تقويمية لمواضيع الادارة الانشائية في مناهج المرحلة الأولية للهندسة المدنية في بعض الجامعات العراقية

Authors: Zuhair mikhaail sako زهير ميخائيل ساكو --- Entisar Kadhim Rasheed انتصار كاظم رشيد
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2016 Volume: 22 Issue: 3 Pages: 20-40
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

There is no doubt that the field of education and teaching (in any country and whatever its ruling system varies “d”) is considered one of the most specific and sensitive field, because it is related to the building of human. And as the human is a purpose (aim) and the means in the same time and he is the strategist capital, so he way of his rearing, education, choosing the educator, methods of working and the aims are considered serious matters. The educational process has aim determined by the society for him self through its working establishments in this field and these are the official and public establishments. And as he feels that the establishments have failed to achieve its duty, it, and without hesitation immediately interferes by the means that he choose to fix the defect. The educational process aims are meant to be the determined modification for the way which are expected to change the students through this process .i,e. the way of their thinking, feeling and actions. And the curricula’s used (followed) are considered one of the means to achieve the aims. This research aims at studying the program of the construction management wherefrom the items are distributed although the years and hours of primary stage in the civil engineering department in Baghdad university and some other Iraqi universities. The curricula’s items of some sedate worldwide (universal) universities, and to make a comparison between them to reach a specific form to the method of teaching these items, unify them, revive them and to contribute in clarifying the features of the path way ahead of a teaching Corp member which is followed in the teaching curricula’s of the construction on the means which make achieving this complicated process a living interactive system.

لاشك في ان ميدان التربية والتعليم في اي بلد من البلدان ومهما اختلف نظام الحكم فيه، يعد من اكثر الميادين دقة وحساسية لأنه يتعلق ببناء الانسان، ولما كان الانسان هو غاية ووسيلة في الوقت نفسه وهو رأس المال الستراتيجي فان طريقة تربيته وتعليمه وانتقاء المربي وطرائق العمل والمنهج والأهداف تعد من الأمور الخطيرة. ان للعملية التربوية اهدافاً يحددها المجتمع لنفسه من خلال مؤسساته العاملة في هذا الميدان، وهي المؤسسات الرسمية او الشعبية وعند شعوره بقصور هذه المؤسسات عن القيام بدورها لايلبث ان يتدخل مباشرة بالوسائل التي يرتئيها لإصلاح الخلل. ونعني بأهداف العملية التربوية انها الصياغة المحددة للطرق التي نتوقع ان يتغير بها التلاميذ من خلال هذه العملية، اي الطرق التي سيبذلون بها تفكيرهم ومشاعرهم وافعالهم، والمناهج المتبعة تعد إحدى الوسائل لتحقيق الأهداف. يهدف هذا البحث الى دراسة منهاج الادارة الإنشائية من حيث المفردات موزعة على السنوات والساعات للمرحلة الأولية لقسم الهندسة المدنية في جامعة بغداد وبعض الجامعات العراقية الاخرى ومفردات المناهج لبعض الجامعات العالمية الرصينة وعمل مقارنة بينها للتوصل الى صيغةمحددة لطريقة تدريس هذه المفردات وتوحيدها والنهوض بها والإسهام بتوضيح معالم الطريق أمام عضو الهيئة التدريسية الذي سيسلكه في مناهج تعليم الإدارة الهندسية في جامعاتنا مع التركيز على الوسائل التي تجعل القيام بهذه العملية المعقدة نظاماً حياً متفاعلاً.

Keywords

Listing 1 - 3 of 3
Sort by
Narrow your search

Resource type

article (3)


Language

Arabic (3)


Year
From To Submit

2016 (1)

2011 (1)

2009 (1)