research centers


Search results: Found 8

Listing 1 - 8 of 8
Sort by

Article
Solution of Fuzzy Maximal Flow Problems of Vehicles in Province of Diwaniyah Using the Ranking Function for Fuzzy Linear Programming Model
حل مشكلة أقصى تدفق ضبابي للمركبات في محافظة الديوانية باستعمال دالة الرتب لأنموذج البرمجة الخطية الضبابي

Authors: وقاص سعد خلف --- علي حسين محمد
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2013 Volume: 19 Issue: 73 Pages: 430-452
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The traffic jams taking place in the cities of the Republic of Iraq in general and the province of Diwaniyah especially, causes return to the large numbers of the modern vehicles that have been imported in the last ten years and the lack of omission for old vehicles in the province, resulting in the accumulation of a large number of vehicles that exceed the capacity of the city's streets, all these reasons combined led to traffic congestion clear at the time of the beginning of work in the morning, So researchers chose local area network of the main roads of the province of Diwaniyah, which is considered the most important in terms of traffic congestion, it was identified fuzzy numbers for vehicles flowing at the time of the beginning of work in the morning for paths of this network as the trapezoidal fuzzy numbers. The objective of this study is to find the fuzzy optimal solution of fuzzy max flow problems for number of vehicles which flowing at the beginning of work per day by using mathematical and quantitative methods as a method of fuzzy max flow problems to clarify the fuzzy numbers for vehicles flowing at the beginning of work in the morning for all paths of this network also a method of fuzzy linear programming was used for building the fuzzy linear programming model of fuzzy max flow problems, finally Ranking function and arithmetic operations were used for defuzzification the building model.

إن الاختناقات المرورية التي تشهدها مدن جمهورية العراق بشل عام ومحافظة الديوانية بشكل خاص والتي تعود أسبابها إلى الأعداد الكبيرة للمركبات الحديثة التي تم استيرادها في العشر سنوات الأخيرة وقلة تسقيط المركبات القديمة في المحافظة مما أدى إلى تراكم عدد كبير من المركبات والتي تفوق القدرة الاستيعابية لشوارع المدينة، كل هذه الأسباب مجتمعةً أدت إلى الاختناق المروري الواضح في وقت بداية العمل صباحاً ونهاية العمل مساءً، لذا تم اختيار شبكة محلية من شبكة الطرق الرئيسة لمحافظة الديوانية والتي تعد الأكثر أهمية من ناحية الاختناق المروري إذ تم تحديد الإعداد الضبابية للمركبات المنسابة في وقت بداية العمل صباحاً لطرق هذه الشبكة والتي كان لها دالة انتماء شبه منحرفTrapezoidal function ) ) للفترة الصباحية. إن الهدف من هذه الدراسة هو إيجاد الحل الأمثل الضبابي لمشكلة أقصى تدفق ضبابي (Fuzzy Max Flow) لأعداد المركبات المنسابة في وقت بداية العمل صباحاً حيث تم ذلك باستعمال أساليب رياضية وكمية فعالة هي أسلوب أقصى تدفق ضبابي (Fuzzy Max Flow) لتوضيح الأعداد الضبابية للمركبات المنسابة في هذا الوقت لطرق هذه الشبكة وأسلوب البرمجة الخطية الضبابية (Fuzzy Linear Programming) حيث تم بناء أنموذج برمجة خطية ضبابي لمشكلة أقصى تدفق ضبابي وأخيرا أسلوب دالة الرتب (Ranking Function) والعمليات الحسابية اللذان استعملا لإزالة ضبابية الأنموذج المبني لهذه الشبكة.


Article
Project Scheduling By using Goals Programming – An Applied Research In Modern Village Project (Residential Building Aspectin In Wasit Governorate)
جدولة المشروع باستعمال أسلوب برمجة الأهداف – بحث تطبيقي في مشروع القرية العصرية (محور ألابنية السكنية) في محافظة واسط

Authors: وقاص سعد خلف --- تمام سلمان خضر
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2015 Volume: 21 Issue: 85 Pages: 169-201
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

One of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost . the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building project , with acknowledgement that many activities of project net are of unconventional relations among each others (of type finish to start) ; and there are periods of (lead and lag) among each other for that reason , (primavera V6) program is used in project scheduling and management which is one of prime programs to find the time and cost of project accomplishment at normal and crash states ; and as project management has numerous goals , same of them are contradictory which are trying to do in one time and that require great working and decision-makers face difficulty to reach into accurate and suitable decisions (goal programming) method is used which is one of efficient and mathematical method to achieve the objectives the results obtained of the mathematical model solution with the use of (win Q.S.B V2) program show the importance and efficiency of this method in modern village project scheduling (residential building aspect) under numerous contrasted goal that project management determined according to their importance and to be achieved according to their importance and to be achieved in one time .

ان من اهم التحديات التي تواجه ادارة المشروع في الوقت الحاضر هو ضمان انجاز المشروع على الرغم من خضوعه لقيود محدده منها قيود تتعلق بالوقت واخرى تتعلق بالموارد المالية المخصصة للمشروع لذا فان هذا الامر يتطلب حساب دقيق للوقت والكلفة, فمشروع القرية العصرية (محور الابنية السكنية) هو احد المشاريع الضخمه والتي تسعى وزاره الزراعه الى انجازها في محافظة واسط حيث تم اختيار هذا المشروع بوصفه من المشاريع التي فيها العمل متلكأ وعلى هذا الاساس تمت دراسة المشروع من جديد وفق الاساليب العلميه والرياضية الحديثه حيث استعمل احد اساليب جدولة وادارة المشروع وهو أسلوب المسار الحرج (CPM) لايجاد وقت انجاز مشروع الابنيه السكنيه علما ان الكثير من الانشطة في شبكة المشروع لم تكن العلاقات بينها تقليدية (من نوع Finish to Start) كما تضمنت وجود فترات التقديم والتاخير (Lead and Lag) بينها وعليه تم استعمال احد البرامج الرائده في إدارة وجدولة المشروع وهو برنامج PrimaveraV6)) لايجاد وقت وكلفة انجاز المشروع في الظروف الطبيعية والتعجيلية، وبما ان لادارة المشروع اهداف عديدة ومنها متناقضة تسعى الى تحقيقها في ان واحد الامر الذي يتطلب الجهد الكبير وصعوبة الوصول الى القرارات المناسبة والدقيقة من قبل متخذ القرار فكان لابد من استعمال اسلوب رياضي كفوء وهو برمجة الاهداف (Goal Programming) لتحقيق هذه الاهداف حيث بينت النتائج المستحصلة من حل الإنموذج الرياضي باستعمال احد البرامج الجاهزة (WinQ.S.B V2) الى اهمية هذا الاسلوب وكفاءته في جدولة مشروع القرية العصرية (محور الابنية السكنية) في ظل وجود اهداف عديدة ومتناقضة لادارة المشروع حددتها وفق اهميتها وتسعى الى تحقيقها في ان واحد.


Article
Material Requirements Planning for the Electric Motor in Fuzzy Environment for State Company for Electric Industries
تخطيط الأحتياجات من المواد للمحرك الكهربائي في البيئة الضبابية للشركة العامة للصناعات الكهربائية

Authors: وقاص سعد خلف --- محمد عبد أحمد
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2016 Volume: 22 Issue: 90 Pages: 170-197
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

This research aims at examining the expected gap between the fact of planning and controlling process of production at the State Company for Electric Industries and implementation of material requirements planning system in fuzzy environment. Developing solutions to bridge the gap is required to provide specific mechanisms subject to the logic of fuzzy rules that will keep pace with demand for increased accuracy and reduced waiting times depending on demand forecast, investment in inventory to reduce costs to a minimum.The proposed solutions for overcoming the research problem has required some questions reflecting the problem with its multiple dimensions, which are in essence the possibility of employing fuzzy sets theory to remove high levels of uncertainty in demand, lead times , and in the total cost of the electric motor for air coolers (consisting of fifty-six part) during the time period between (2/1/2014) and (15/1/2015), and to increase the effectiveness of material requirements planning system for achieving its goals more efficiently.In order to answer the research questions, fuzzy time series technique has used for estimating demand and its expected change rates.IF-THEN rules has also been used with their linguistic variables and experts opinions at the company studied after being converted to probability matrices reflecting the variation of lead times owing to demand levels fluctuations and its indicator. Furthermore, IF-THEN rules has also been used for estimating fuzzy inventory costs.The required mathematical and quantitative analyses of research data have conducted using a number of statistical packages (Win Qsb, SPSS, Matlab). The final results confirmed the applicability of fuzzy sets theory to reduce the effects of environmental variability facing the company studied in areas of demand, lead times and inventory costs . Moreover, it has reached to a result indicating the possibility of using modern techniques in controlling demand and inventory fluctuations via material requirements planning system in fuzzy environment that provide a proposed solutions to the research problem and specific answers on the research questions, Research recommendations have raised the necessity of remove the vagueness and uncertainty accompanying the Iraqi production environment by employing fuzzy sets theory applications for ensuring the effective application of material requirements planning system within fuzzy environment.

إستهدف البحث دراسة الفجوة المتوقعة بين واقع عملية التخطيط والسيطرة على الانتاج في الشركة العامة للصناعات الكهربائية والمتطلبات اللازمة لتنفيذ نظام تخطيط الاحتياجات من المواد في البيئة الضبابية ووضع الحلول الكفيلة بردم تلك الفجوة بما يسهم في تقديم آليات محددة تخضع لقواعد المنطق الضبابي التي من شأنها معالجة ضبابية الطلب أولاً بأول وتحديد مدد الأنتظار الضبابية تبعاً لتوقعات الطلب والأستثمار المناسب في الخزين بما يضمن تقليص كلف الخزن الى أدنى حد ممكن .وقد تطلب إقتراح الحلول الكفيلة بتذليل مشكلة البحث صياغة عدد من التساؤلات المعبرة عن المشكلة بأبعادها المتعددة التي ترتبط في جوهرها بإمكانية توظيف نظرية المجاميع الضبابية في إزالة مستويات عدم التأكد العالي في كل من الطلب ومدد الأنتظار وكلف الخزن من المحرك الكهربائي لمبردات الهواء (المتكون من ستين جزءاً) خلال المدة الزمنية المحصورة بين (2/1/2014) و (15/1/2015) وزيادة فاعلية نظام تخطيط الأحتياجات من المواد بما يقود الى تحقيق الأهداف المرافقة لتطبيقه بكفاءة أعلى .ولأجل الأجابة عن تساؤلات البحث وإجراء الجانب العملي منه، أستعمل اسلوب السلاسل الزمنية الضبابي في تقدير مستويات الطلب ومعدلات التغير فيه, وكما استعمل اسلوب الاستدلال الضبابي (قواعد الشرط والنتيجة) بمتغيراتها اللغوية وآراء الخبراء العاملين لدى الشركة المدروسة في ذلك وتحويلها الى مصفوفات إحتمالية تعكس تباين مدد الأنتظار والذي سببه التذبذب الحاصل في مستويات الطلب ومؤشر الطلب, علاوة على ذلك استعمال قواعد الشرط والنتيجة ذاتها لتقدير كلف الخزن الضبابية.وبعد اجراء التحليلات الرياضية والاحصائية المطلوبة للبيانات بأستعمال عدد من البرامج الأحصائية الجاهزة (, SPSS, Matlab Win Qsb) بالاضافة إعداد برنامج مصمم لخوارزمية خاصة بمعالجة الطلب الضبابي ضمن برنامج (Matlab) والتي قادت الى النتائج النهائية للبحث، تبينت إهمية تطبيق نظرية المجاميع الضبابية وكفاءتها في الحد من الآثار الناجمة عن التقلبات البيئية التي تواجهها الشركة المدروسة وسيطرتها على مستويات الطلب ومدد الأنتظار وكلف الخزن ومن ثم إستعمال الأساليب الحديثة في السيطرة على الخزين عبر نظام تخطيط الاحتياجات من المواد في البيئة الضبابية وبما يوفر حلولاً مقترحة لمشكلة البحث وإجابات محددة عن تساؤلاته رافقتها مجموعة توصيات تضمنت في حقيقتها ضرورة إزالة الغموض وعدم التأكد المرافقين لبيئة الأنتاج العراقية من خلال توظيف تطبيقات نظرية المجاميع الضبابية في ذلك وضمان كفاءة وفاعلية تطبيق نظام تخطيط الأحتياجات من المواد في حدود البيئة الضبابية .


Article
Inventory control by using Fuzzy set theory An Applied Research at the Baghdad Soft Drinks Company
الأستراتيجية المثلى لأدارة المخزون الضبابي بحث تطبيقي في شركة بغداد للمشروبات الغازية

Authors: وقاص سعد خلف --- عبد الله باسم جاسم
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2017 Volume: 23 Issue: 101 Pages: 72-98
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Abstract The production companies in the Iraqi industry environment facing many of the problems related to the management of inventory and control In particular in determining the quantities inventory that should be hold it. Because these companies adoption on personal experience and some simple mathematical methods which lead to the identification of inappropriate quantities of inventory. This research aims to identify the economic quantity of production and purchase for the Pepsi can 330ml and essential components in Baghdad soft drinks Company in an environment dominated by cases of non ensure and High fluctuating as a result of fluctuating demand volumes and costs associated with inventory, and has been using the fuzzy time series method to dispose of uncertainty and fluctuation accompanying demand for finished product , and using the fuzzy inference system (If-Then Rules) to remove the cases of uncertainty associated with the holding inventory cost for the finished product and essential components. After removing the fuzzy of demand and holding inventory cost Parameters, been used the production model without Shortage to determine the economic production quantity for the Pepsi can 330 ml, and the purchase model without Shortage to determine the economic order quantity for the product components. The statistical programs (Matlab, Win Qsb.v2) were used for mathematical and statistical analyzes.

المستخلصتواجه الشركات الانتاجية في بيئة الصناعة العراقية العديد من المشاكل المتعلقة بإدارة الخزين والسيطرة عليه وعلى وجه الخصوص فيما يتعلق بتحديد كميات الخزين الواجب الاحتفاظ بها وذلك بسبب اعتماد هذه الشركات على الخبرة الشخصية وبعض الاساليب الرياضية البسيطة التي تؤدي الى تحديد كميات غير مناسبة من الخزين. ويهدف البحث الى تحديد الكميات الاقتصادية للإنتاج والطلب لعلبة البيبسي 330 مل ومكوناتها الأساسية في شركة بغداد للمشروبات الغازية في ظل بيئة تسودها حالات عدم تأكد وتذبذب عالي نتيجة تذبذب كميات الطلب والكلف المرافقة للخزين, وقد تم استخدام أسلوب السلاسل الزمنية الضبابية للتخلص من الغموض والتذبذب المرافق للطلب على المنتج النهائي, وتم استخدام أسلوب الاستدلال الضبابي (قواعد الشرط والنتيجة) لأزاله اللبس وحالات عدم التأكد المرافقة لكلفة الاحتفاظ بالخزين للمنتج النهائي ومكوناته الأساسية. وبعد إزالة الغموض من معلمتي الطلب وكلفة الاحتفاظ بالخزين جرى استعمال نموذج الانتاج بدون عجز لتحديد الكمية الاقتصادية للإنتاج علبة البيبسي 330 مل واستعمال نموذج الشراء بدون عجز لتحديد كمية الطلب الاقتصادية على مكونات المنتج المذكور, وقد تم استعمال البرامج الاحصائية الجاهزة (Matlab, Win Qsb. v2) لأجراء التحليلات الرياضية والإحصائية اللازمة, وبعد التوصل الى النتائج النهائية للبحث تبينت اهمية تطبيق نظرية المجموعات الضبابية وكفاءتها في الحد من الاثار الناجمة عن التقلبات البيئية التي تواجهها الشركة من خلال السيطرة على مستويات الطلب وكلف الاحتفاظ بالخزين فضلا عن أهمية تطبيق نموذجي الخزين (الإنتاج بدون عجز والشراء بدون عجز) وفاعليتها في تحديد الكميات الاقتصادية للإنتاج والطلب وتقليل الاستثمار في الخزين بما يؤدي الى خفض الكلف الإجمالية للخزين الى ادنى حد ممكن وبما يوفر حلولا مقترحة لمشكلة البحث.


Article
Find the fuzzy maximum flow of Imam Kadhimen visitors using fuzzy dynamic programming University of Baghdad - Faculty of Administration and Economics
ايجاد اعظم تدفق ضبابي لزوار الامام الكاظم (ع) بإستخدام اسلوب البرمجة الديناميكية الضبابية

Authors: وقاص سعد خلف --- حسين داود حليم
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2018 Volume: 24 Issue: 103 Pages: 102-127
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Baghdad and the other Iraqis provinces have witnessed many of celebrations which have the significant effect on the souls of Arabic and Islamic people in general , and Iraqi people, especially the birthday and death of two al-kadhimen Imams(peace upon them) and others .From here the researcher begin to study the visiting of imam kadhimen (peace upon him) on 25 Rajab the commemoration of his sacrifice, simply because have implications of religious, ideological and cultural sectors which represents in finding the greatest flow of visitors .the problem of research appeared due to the clear difference in number of visitors during one day, beside the significant increase in number of visitors through the period of visiting that reached great number on days (22-23-24 of Rajab month), also the researcher has chosen the sample of research, depending on the number of visitors in Sadir city and their neighborhoods to city of holy kadhimen, in order to identify the Maximum flow of visitors in coordination with concerned sides (Shitte affairs divan /Department of religious ceremonies /board of Al-husyania procession), (the general secretariat of holy shrine of kadhimen), (Council of Baghdad province/ governor of Sadir city 1,2), (councilarity of Baghdad /department of designs /section of geographical information), in addition to many of friends who are living near the place which leads to location of visiting ,beside the number of visitors who they done the ceremony of visiting during its time. The goal of study is to find the greatest flow of visitors with create treatment of fuzzy by using the method of fuzzy dynamic programming style, though it used rank function to solve the fuzzy and Trigonometric functions, in order to know the time of increasing number of visitors .The results which have gotten by research that the Maximum flow of visitors on 24 Rajab are (131196, 94100, 46056), Throw( Morning, afternoon, evening) Where the number (46056) represents the Maximum flow for the morning period and so on the rest of the numbers, By using the grade function of the triangular triangulation function to handle the fog of the three periods of visitors per day(Ie after processing the fog for (22-23-24 of Rajab month) shows that the Maximum flow of the processor is (91391) visitor at day 24), exactly the flow of visitors have increased from or fly intersection to Tarik intersection ,to 55 intersection, to 83 intersection, intersection of complex of teachers ,intersection of oil club, to al– binok, to selekh intersection, to al-nada mosque, to Antar intersection, to intersection of 14 Ramadan bridge, finally passing to kadhimen city .The number of visitors are (131196-51084), and the time of visiting between the noon of 23 of Rajab to night 24 of Rajab As shown in Figure (11).

المَلخص(Abstract) تشهد العاصمة بغداد وبقية المحافظات العراقية العديد من المناسبات التي لها الأثر البالغ في نفوس الشعوب الاسلامية والعربية عامة والشعب العراقي خاصة منها ولادة ووفاة الامامين الكاظمين (ع) وغيرها، من هنا انطلق الباحث لدراسة زيارة الامام الكاظم (ع) في 25 رجب ذكرى استشهاده ولما لها من مدلولات على الصعيد الديني والعقائدي والثقافي والمتمثلة بأيجاد اعظم تدفق ضبابي للزائرين حيث برزت مشكلة البحث من خلال اختلاف واضح في اعداد الزائرين اثناء اليوم الواحد والتزايد الواضح في اعداد الزائرين خلال مدة الزيارة والتي تصل ذروتها في الايام (22-23-24 من شهر رجب )، حيث قام الباحث بإختيار عينة البحث وهي عبارة عن اعداد الزائرين من مدينة الصدر وضواحيها الى مدينة الكاظمية المقدسة لتحديد اقصى تدفق للزائرين في ظل البيئة الضبابية بالتنسيق مع الجهات ذات العلاقة وهي (ديوان الوقف الشيعي/ دائرة الشعائر الدينية/ هيئة المواكب الحسينية)، (الامانة العامة للعتبة الكاظمية المقدسة)، ( مجلس محافظة بغداد/ قائم مقامية مدينة الصدر1,2 )، (امانة بغداد/ دائرة التصاميم/ قسم المعلومات الجغرافية) والعديد من الاصدقاء والمعارف الذين يسكنون قرب المسارات المؤدية الى مكان الزيارة ومجموعة من الزائرين الذين ادو مراسيم الزيارة خلال اوقاتها. ان الهدف من الدراسة هو ايجاد اعظم تدفق ضبابي للزائرين مع ايجاد معالجة الضبابية بإستخدام اسلوب البرمجة الديناميكية الضبابية، حيث تم استخدام دالة الرتب لمعالجة الضبابية ودوال الانتماء المثلثية لمعرفة فترة الذروة للتدفق على اساس ايام واوقات الزيارة. ان أهم النتائج التي توصل اليها البحث هي ان اعظم تدفق ضبابي للزائرين حصل في يوم 24 رجب هو(131196,94100,46056) زائر خلال (فترة الصباح، فترة الظهيرة، فترة المساء) حيث العدد (46056) يمثل التدفق الضبابي لمدة الصباح وهكذا بقية الاعداد ، من خلال أستخدام دالة الرتب للدالة المثلثية الضبابية لمعالجة ضبابية المدد الثلاث للزائرين لليوم الواحد(اي بعد معالجة الضبابيىة ليوم 24،23،22 تبين ان اعظم تدفق معالج هو(91391) زائر عند يوم 24) حيث يبدأ التدفق بالضبط من تقاطع الاورفلي الى تقاطع حي طارق الى تقاطع 55 الى تقاطع 83 الى تقاطع مجمع الاساتذة الى تقاطع نادي النفط الى تقاطع البنوك الى تقاطع صليخ الى تقاطع جامع النداء الى تقاطع ساحة عنتر الى تقاطع جسر 14رمضان والعبور في النهاية الى مدينة الكاظمية،، وان مدة الذروة للزائرين تكون محصورة مابين (51084- 131196) زائر مابين فترة الظهيرة ليوم 23 رجب وفترة المساء ليوم 24 رجب كما موضح في الشكل(11).


Article
Material Requirements Planning (MRP) for Electric Geyser Product by Using Goal Programming applicative research in the general company of electrical industrialization
تخطيط الاحتياجات من المواد (MRP) لمنتج السخان الكهربائي باستعمال برمجة الاهداف بحث تطبيقي في الشركة العامة للصناعات الكهربائية

Authors: وقاص سعد خلف --- نادية لطفي عبد الوهاب --- / منال داود سلمان
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2014 Volume: 20 Issue: 80 Pages: 281-321
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Material Requirements Planning System (MRP) is considered as one of the planning and controlling of production and inventory systems which is used to prepare plan of the final production requirements and its parts of subcomponents raw materials and the time at which it was needed for the purpose of preparing orders of production and purchase.The problem of the present work is represented in the general company of electrical industrialization adoption of traditional methods and personal experience of the process of the products andor purchase quantity and inventory quantities and limiting the required time for acquiring the required quantities of the materials and parts used in the finish product of the company, in addition to the multi goals of the company which is wanted to do according to its importance at the same time, enjoined the use of the method of goal programming to build a multi goals mathematical model for material requirements planning for the electrical geyser as a research sample general company of electrical industrialization in Al_Waziriya, the period of planning was limited by three months for the year of 2012 (July, August and September), And used in the model solution and get the results the program ready (LINGO-Ver.13).The mathematical model acquired its special importance from its applicability in any company and productive factory after making simple adjustments on it. The present work reaches some conclusions, the most important ones was that the goal programming is considered of the efficient best methods in management since in dealing with multi andor conflicting goals. According to research results, many recommendation was put, the most important recommendation was the expansion in implementation of mathematical methods while planning to make a decision instead of traditional methods for its goals scientific potentials offers in controlling on circumstances and decision limitations and to achieve the best results with a available resources.

يعد نظام تخطيط الاحتياجات من المواد(MRP) من أنظمة التخطيط والسيطرة على الانتاج والمخزون الذي يستعمل لإعداد خطة الاحتياجات للمنتجات النهائية واجزائها من المكونات الفرعية والمواد الاولية وأوقات الحاجة لها بهدف إعداد اوامر الانتاج أو الشراء. تتمثل مشكلة البحث في اعتماد الشركة العامة للصناعات الكهربائية على الطرائق التقليدية والخبرة الشخصية لعملية تحديد الكميات المنتجة و/او المشتراة والكميات المخزونة وتحديد الاوقات اللازمة للحصول على الكميات المطلوبة من المواد والاجزاء الداخلة في المنتج النهائي للشركة، فضلا عن تعدد الاهداف للشركة والتي تسعى الى تحقيقها وفق اهميتها في آن واحد أوجَبَ استعمال اسلوب برمجة الاهداف لبناء إنموذج رياضي متعدد الاهداف لتخطيط الاحتياجات من المواد لمنتج السخان الكهربائي كعينة للبحث في الشركة العامة للصناعات الكهربائية في الوزيرية، وقد حُددت فترة التخطيط للمنتج بثلاثة اشهر لسنة 2012 وهي (تموز، آب، ايلول)، واستُعمِل في حل الإنموذج والحصول على النتائج البرنامج الجاهز (LINGO-Ver.13). يكتسب الإنموذج اهميته من خلال امكانية تطبيقه في اي شركة او مصنع انتاجي بعد اجراء تعديلات بسيطة عليه، وتوصل البحث الى استنتاجات اهمها اعتبار برمجة الاهداف من أفضل الطرائق الكفء في علم الإدارة للتعامل مع الأهداف المتعددة و/أو المتعارضة، واستنادا الى استنتاجات البحث فقد وضعت توصيات اهمها التوسع في تطبيق الطرائق الرياضية عند التخطيط لاتخاذ القرار، بدلا من الأساليب التقليدية لما توفره من إمكانات علمية جيدة في السيطرة على ظروف وقيود القرار وبما يحقق أفضل النتائج في ظل الموارد المتاحة.


Article
PROJECT MANAGEMENT OF BALAD`S MAJOR SEWERAGE SYSTEM BY USING THE GOAL PROGRAMMING METHOD
ادارة مشروع مجاري بلد الكبير باستخدام أسلوب البرمجة بالأهداف

Authors: أمجد عباس عبد الرحيم البلداوي --- وقاص سعد خلف
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2016 Volume: 22 Issue: 93 Pages: 162-194
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve these projects in the determined time , added cost and technical specifications although the majority of these projects have been managed with predetermined time and financial resources limits , they still need some improved strategies and more careful calculation in their time and cost management. This project was chosen for the following reasons , The first reason is that the project is currently stopped, because of the security and financial circumstances in salahulddin province in particular .this is a great manage time and cost when the work is resumed , and the second reason is during the progress of the project, the until it was stopped, the completion percentage was behind what it was planned originally . this highlights the need to study how to avoid these delays in future using a scientific and logical method , and the third reason that the project has many variables that affect the progress, which are of great importance for scientific and mathematical methods . To achieve this purpose the project was studied using modern scientific and mathematical methods , which are the curved part method (CPM) for project's real and accelerated timing the Primavera V6 software and the AutoCAD 2015 software . the goal is to benefit from these methods and software to establish a new work schedule for the project . Due to the project's various and clashed (in sometimes) objectives that are have to be accomplished in a limited time , it is very important to be careful and accurate with making the right time . It was highly needed to use an efficient mathematical model that work with all these variables in the limited time allowed and according to their priorities . This mathematical method is called the Goal Programming for multi-objective mathematical models

يعد مشروع مجاري بلد الكبير احد اكبر المشاريع التي هي قيد الانجاز في محافظة صلاح الدين ضمن خطة تنمية الاقاليم للعام 2013 , فهو مشروع ضخم يسير باتجاهين الاول مد الشبكات و الثاني انشاء محطات الرفع وللمحورين ( الثقيل والمطري ) , والتي تسعى مديرية مجاري صلاح الدين تنفيذه لخدمة اربعة احياء في قضاء بلد . إن من أهم التحديات التي تعيق ادارة المشاريع اليوم هي التأكد من انجاز تلك المشاريع في وقتها المحدد , وكذلك الكلفة و المعاير الفنية المحدد ايضا , وعلى الرغم خضوع اغلب هذه المشاريع لقيود محددة ( محددات ) تتعلق بالوقت واخرى تتعلق بالموارد المالية المخصصة للمشروع لذا فأن موضوع الوقت والكلفة في ادارة اي مشروع يحتاج الى حسابات دقيقة لهما . وقد تم اختيار هذا المشروع للدراسة لعدة اسباب مهمة , السبب الاول : إن المشروع متوقف حاليا بسبب الظروف الامنية والمادية في صلاح الدين على وجه الخصوص , وهذا دافع كبير لدراسة كيفية التعامل مع وقت وكلفة انجازه في حال استأنف العمل به , والسبب ثانيا اثناء تنفيذ المشروع كانت هنالك انحرافات عن نسب الانجاز الفعلي , مما يدفع الى توفير دراسة وبأسلوب علمي ومنطقي لتجاوز هذه الانحرافات في المستقبل , اما السبب الثالث فهو إن المشروع يحتوي على الكثير من الانشطة مما يعطي اهمية كبيرة للأساليب العلمية والرياضية التي سوف تؤثر بشكل كبير في تنفيذ المشروع بأسلوب مدروس . لذا تمت دراسة المشروع من جديد وفقا لأساليب علمية ورياضية حديثة , اختيار اسلوب المسار الحرج (CPM) بوصفه احد اساليب الادارة العلمية للمشاريع لإيجاد وقت انجاز المشروع الطبيعي والتعجيلي , وبما ان لإدارة هذا المشروع اهداف متعددة تسعى الى تحقيقها في مدة زمنية محددة , الامر الذي يتطلب الكثير من الدقة في الوصول للقرارات المناسبة , فكان من الاجدر استخدام اسلوب رياضي كفوء لبناء نموذج رياضي متعدد الاهداف يعمل مع جمــيع هذه المتغـيرات في المدة الزمنية المحددة وبحــسب اولوياتهــا وتسمى البرمجة الهدفية ( (Goal Programming , وكذلك تم استخدام بعض البرامج الجاهزة لرسم الشبكة كبرنامج (Primavera V6 ) والبرنامج الهندسي المعروف (AUTO CAD 2015 ) , وبرنامج (Win QSB) لحل الأنموذج متعدد الاهداف , ومحاولة الافادة من مميزات هذه البرامج في جدولة المشروع .


Article
The Time-Cost Trade-off to Manage A Project in a Fuzzy Environment
المبادلة بين الوقت والكلفة لإدارة المشروع في البيئة الضبابية

Authors: Wakas Saad Khalaf وقاص سعد خلف --- Ruya Sarhan Mhna رؤيا سرحان محنة
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2019 Volume: 25 Issue: 114 Pages: 498-522
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

In this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and then used another method, the method of time-cost exchange (TCT), which is one of the important techniques used by the project manager to shorten the time of completion of the project at the lowest cost has been achieved This method reduced the implementation time of the project by a large percentage. The results showed that the implementation period was reduced from (1309.5) days to (1224.2) days, and the cost of completion of (33353514407) dinars, an increase of (240496638) dinars.

تم في هذا البحث معالجة مشكلة الغموض للبيانات الخاصة بمشروع انشاء المجمع الاصلاحي النموذجي في محافظة البصرة حيث تم التخلص من ضبابية البيانات المتمثلة بأوقات وكلف الانشطة عن طريق استخدام دالة الرتبFunction) Ranking) وتحويلها الى ارقام اعتيادية ، ومن ثم تم التخلص من مشكلة الضبابية وتم استخدام اسلوب جدولة وادارة المشروع المتمثل بأسلوب المسار الحرج CPM لإيجاد وقت انجاز المشروع في الظروف الطبيعية في ظل وجود علاقات غير تقليدية بين الانشطة ووجود فترات التقديم والتأخير (Lead &Lag) وتم استعمال البرنامج (MS Project) لإيجاد المسار الحرج اظهرت النتائج ان وقت انجاز المشروع في الظروف الطبيعية (1309.5) والكلفة الاجمالية قد بلغت (33113017769) دينار ومن ثم تم استخدام اسلوب اخر وهو اسلوب المبادلة بين الوقت والكلفة (TCT) والذي يعتبر من التقنيات المهمة التي يلجا اليها مدير المشروع في تقصير زمن انجاز المشروع وباقل كلفة ممكنة وقد حقق تطبيق هذا الاسلوب تقليص وقت تنفيذ المشروع بنسبة كبيرة واظهرت النتائج انه تم تقليص مدة التنفيذ من (1309.5) يوم الى (1224.2) يوم ، وبكلفة انجاز قدرها (33353514407) دينار اي بزيادة مقدارها (240496638) دينار .

Listing 1 - 8 of 8
Sort by
Narrow your search

Resource type

article (8)


Language

Arabic and English (8)


Year
From To Submit

2019 (1)

2018 (1)

2017 (1)

2016 (2)

2015 (1)

More...