Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
موديل رياضي لأمثلية الوقت والكلفة الانشائية بأستخدام امثلية مستعمرة النمل

Authors: Mohammed Nooruldeen Azeez --- Angham Alsaffar
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2014 Volume: 20 Issue: 1 Pages: 114-131
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities. In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm.

ان الوقت والكلفة هي اهم العوامل المأخوذة في تخطيط اي مشروع، في اختصاص ادارة المشاريع الانشائية. وان العلاقة بين الوقت والكلفة معقدة. فأن الكلفة الكلية في اي مشروع تمثل مجموع الكلف المباشرة وغير المباشره، وتمثل الكلف المباشره كلف العمالة والمواد والمعدات ، الخبينما الكلف غير المباشره تمثل بصورة عامة مصاريف الاشراف و الاداريات والاستشارية اضافة الى الفوائد.الكلف المباشرة تزداد بنسبة كلما طال عمر المشروع عن عمره المقرر ، بينما الكلف غير المباشره تستمر طيلة عمر المشروع وان اي تقليل في مدة المشروع عن المدة المحددة تعني تقليل الكلف غير المباشره ، لذا فان هنالك مقايضة بين الكلفة والوقت في اكمال الفعاليات الانشائية.في هذا البحث ، سوف يتم انشاء موديل لحساب امثلية الوقت-الكلفة الانشائية. توليد حلول مثلى عالمية للوقت والكلفة, تقليل الوقت والكلفة بأستخدام طريقة مستعمرة النمل.


Article
Energy Savings in Thermal Insulations for Sustainable Buildings
وفورات الطاقة في العزل الحراري للابنية المستدامة

Authors: Angham Alsaffar أنغام الصفار --- Qusay Adnan Alwan قصي عدنان علوان
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2014 Volume: 20 Issue: 6 Pages: 63-76
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Energy use is second to staffing in building operating costs. Sustainable technology in the energy sector is based on utilizing renewable sources of energy such as solar, wind, glazing systems, insulation. Other areas of focus include heating, ventilation and air conditioning; novel materials and construction methods; improved sensors and monitoring systems; and advanced simulation tools that can help building designers make more energy efficient choices. The objective of this research is studying the effect of insulations on energy consumption of buildings in Iraq and identifying the amount of energy savings from application the insulations in buildings. HAP (Hourly Analysis Program) is used to calculate the thermal loads and the amount of energy needed. It is concluded that the use of the thermal insulation in the roof, walls, floors, and double glazing system for windows in building effectively reduces the energy required for air conditioning.

ياتي استخدام الطاقة في المرتبة الثانية في تكاليف تشغيل المبنى. تستند التكنولوجيا المستدامة في قطاع الطاقة الى استخدام مصادر الطاقة المتجددة مثل الطاقة الشمسية، طاقة الرياح، أنظمة الزجاج، والعزل. هناك مجالات أخرى تتضمن التدفئة، التهوية وتكييف الهواء، أساليب البناء واستخدام مواد جديدة ، وتحسين أجهزة الاستشعار ونظم الرصد، وأدوات المحاكاة المتطورة يمكن أن تساعد مصممي المبنى في اختيار الطاقة الاكثر كفاءة.يهدف هذا البحث الى دراسة تاثير العوازل في الجدران والسقوف والارضيات والنوافذ على استهلاك الطاقة في الابنية في العراق وتحديد كمية الوفورات في الطاقة الناتجه من تطبيق العوازل في الابنية. تم استخدام برنامج Hourly Analysis Program لحساب الاحمال الحرارية وكمية الطاقة اللازمة. حيث تبين ان استخدام العازل في الجدران والارضيات والسقوف واستخدام النوافذ ذات الزجاج المزدزج في الابنية يقلل بشكل فعال من كمية الطاقة اللازمة للتكييف .


Article
Paving the Way for PPP's to Infrastructure Projects in Iraq
تمهيد الطريق لمشاركة القطاع الخاص للعام في مشاريع البنى التحتية في العراق

Authors: Angham Alsaffar ميرفت رزاق الطائي --- Meervat R. altaay ميرفت رزاق الطائي
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2014 Volume: 20 Issue: 12 Pages: 32-60
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The political situation experienced by Iraq before the events of 2003 that led to the collapse of infrastructure. rebuilding costs were estimated after 2003 by187(million USD) according to the estimates of the basic needs as stated in Five-Year Plan 2010-2014. The difficult in financing projects and the continuous demands for maintenance and operating cost, and working by contemporary styles in different countries, the strategic option is to adopt the government entering the private sector as a partner in the development process. Since public _private partnership (PPP's) is at a germinating stage of development in Iraq, it has been studied the critical success factors(CSF's) in the experiences of countries that have implemented the style (PPP's) in infrastructure projects which can be ensured or controlled in some way and in the effective management of those already embarked upon . It should pave the way for enhanced decision making in the choice of suitable projects. The mainly aims of this paper are:1-To highlight the importance and need of PPP’s contracts in Iraq.2-Establishing a model of CSF's for infrastructure projects in Iraq. collected (87)success factors which characterized by the state directly in PPP's projects consists of (8)main criteria(Privatization and investment Policy, Economical , Legal and political ,Financial and commercial, Administration and organizational ,Social and environmental ,Technical and Support , motives and guarantees of government) and found out (40) CSFs among them through questionnaire experienced in these projects to work to assess the standards and compare them and come to decisions by the decision maker, and therefore have a database of views experienced for use in other projects.

بسبب الاوضاع السياسية التي مر بها العراق قبل احداث 2003،والتي ألت الى انهيار البنى التحتية،تم تقدير تكاليف اعادة الاعمار بعد عام 2003 بـ187 مليار دولار, وفقا لتقديرات الاحتياجات الاساسية كما ماورد في الخطة الخمسية2010-2014.في ضوء هذه المتطلبات المتزايدة ومايصاحب ذلك من صعوبات في تمويل هذه المشاريع والتكاليف المستمرة للتشغيل والصيانة.وعملا بالاساليب الحديثة في مختلف بقاع العالم،فان الخيار الاستراتيجي هو تبني الحكومة دخول القطاع الخاص كشريك في عملية التنمية.تعتبر تجربة مشاركة القطاع الخاص للعام (PPP's) في العراق ضمن مرحلة النمو, فقد تمت دراسة عوامل النجاح الحرجة في تجارب الدول التي طبقت اسلوب PPP's في مشاريع البنى التحتيةو التي من الممكن ان توفر بصورة افضل تاثيرا اكبر على نجاح مشاريع الشراكة والتي من الممكن ان تضمن او تسيطر على الادارة الفعالة لنجاح هذه المشاريع لاجل تمهيد الطريق لتحسين اتخاذ القرارات المتخذة لاختيار المشاريع المناسبة التي من الممكن ان تنفذ بهذا الاسلوب ,تتضمن اهداف البحث بصورة رئيسية, مايلي:-1-ابراز الاهمية المطلوبة لادخال مشاريع البنى التحتية تحت نمط مشاركة القطاع الخاص للعام(PPP's) في العراق.2-تاسيس نموذج لعوامل النجاح الحرجة لمشاريع البنى التحتية في العراق.اذ تم جمع (87) عامل من العوامل الاساسية التي يجب ان تتميز بها الدولة للمباشرة في مشاريع المشاركة مقسمة الى (8) معايير رئيسية (سياسة الاستثماروالخصخصة، اقتصادية،قانونية وسياسية,مالية وتجارية,ادارية،اجتماعية وبيئية،تقنية وفنية ومعايير الدعم والحوافز الحكومية),واستنتاج(40)عامل من عوامل النجاح الحرجة من خلال معرفة مقدار الاهمية لهذة المعايير الرئيسية وترتيب اولوياتها من خلال استبيان ذوي الخبرة في هذه المشاريع لعمل التقييم والمقارنة بينها والخروج بالقرارات بواسطة متخذ القرار, وبالتالي يكون قاعدة معلوماتية لاراء ذوي الخبرة للاستفادة منها في مشاريع اخرى.