research centers


Search results: Found 8

Listing 1 - 8 of 8
Sort by

Article
Study the Efficiency of Drilling With Casing Operation in an Iraqi Oil Field

Author: Ayad A. Alhaleem
Journal: Iraqi Journal of Chemical and Petroleum Engineering المجلة العراقية للهندسة الكيمياوية وهندسة النفط ISSN: 19974884/E26180707 Year: 2016 Volume: 17 Issue: 2 Pages: 47-52
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Drilling with casing (DWC) can be considered as a modern drilling technique in which both of drilling and casing operations done in the same time by using the casing to transfer the hydraulic and mechanical power to the bit instead of traditional drilling string. To overcome oil well control, minimizing the total cost through enhancing drilling efficiency, drilling with casing was proposed as an enabling technology. Two surface sections (17 1/2 - and 12 1/4- inch) were drilled successfully in Rumaila oil field with casing strings which reached 655m and 1524m measured depths respectively. By using DWC technique, the total drill/case phase time was reduced up to 20% comparing to conventional drilling in the same field . Drilling both sections with DWC system eliminating the number of trips and nonproductive time (NPT) related to wellbore instability.

Keywords

casing drilling --- BHA --- drill string --- tripping --- CDS.


Article
Analysis of Stuck Pipe Incidents in Khabaz Field
تحليل إستعصاء أنابيب الحفر في حقل خباز النفطي

Authors: Nazaneen Said Amin --- Ayad A.Alhaleem
Journal: Iraqi Journal of Chemical and Petroleum Engineering المجلة العراقية للهندسة الكيمياوية وهندسة النفط ISSN: 19974884/E26180707 Year: 2018 Volume: 19 Issue: 4 Pages: 47-53
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities. Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe events was made by using the graphical analysis software Easy View. The results were then discussed to identify the causes of stuck pipe. Finally, recommendation to select proper type /drilling fluid rheology properties, optimize casing seat design to reduce probability of stuck pipe.

تواجه عميات حفر الآبارالعديد من المشاكل ومنها مشكلة استعصاء انابيب الحفر التي تعتبر من المشاكل الشائعة جدا في جميع انحاء العالم في صناعة الحفر البترولية مسببة زيادة في الوقت الغير المنتج وخسارة في الوقت والجهد والزيادة في الكلفة نتيجة العمليات الاضافية من التحرير وانتشال انابيب الحفرالملتصقة اضافة الى عمليات الحفر الجانبي في حالة عدم نجاح عمليات الانتشال. ان الحفر في حقل خباز النفطي يواجه العديد من التحديات والمشاكل من بينها فقدان دورة سائل الحفر ، وتدفق المياه المالحة أثناء الحفر، وتهدم جدار التجويف مسببا استعصاء الانابيب. لذلك، فإن الحفر في حقل خبار النفطي يكون صعباً جداً بسبب المشاكل التي تؤدي إلى زيادة في الوقت الغير المنتج. لذلك تم اختيارالبئر خباز -34 لدراسة مشكلة استعصاء انابيب الحفر وتم إجراء تحليل البيانات المتوفرة باستخدام برنامج التحاليل الرسومية stuck pipe pro )) يعرض من خلاله الرسوم والجداول والتحاليل بشكل سهل ثم نوقشت النتائج لتحديد أسباب ونوع الأستعصاء . وأخيرا، تمت التوصية لتحديد نوع سائل الحفر المناسب وخصائص سائل الحفر الريولوجية ، وتحسين تصميم إختيار منطقة إجلاس البطانة للحد او تقليل من إحتمال إستعصاء أنابيب الحفر .


Article
Selection of Suitable Drilling Parameters for obtaining high Rate of Penetration in Majnoon Oilfield
اختيار معاملات الحفر المناسبه لزيادة معدل الاختراق في حقل مجنون النفطي

Authors: Majid M. Majeed --- Ayad A. Alhaleem
Journal: Iraqi Journal of Chemical and Petroleum Engineering المجلة العراقية للهندسة الكيمياوية وهندسة النفط ISSN: 19974884/E26180707 Year: 2019 Volume: 20 Issue: 1 Pages: 65-68
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Several directional wells have been drilled in Majnoon oilfield at wide variation in drilling time due to different drilling parameters applied for each well. This technical paper shows the importance of proper selection of the bit, Mud type, applied weight on Bit (WOB), Revolution per minute (RPM), and flow rate based on the previous wells drilled. Utilizing the data during drilling each section for directional wells that's significantly could improve drilling efficiency presented at a high rate of penetration (ROP). Based on the extensive study of three directional wells of 35 degree inclination (MJ-51, MJ-52, and MJ-54) found that the applied drilling parameters for MJ-54 and the bit type within associated drilling parameters to drill 36", 24", 16" and 12 1/4" hole sections is the best, although the drilling parameters in 8 1/2" hole section for MJ-51 and selected bit type are the best for future wells.

تم حفر العديد من الابار المائله في حقل مجنون النفطي باستخدام معاملات حفر مختلفه لكل بئر لذلك الوقت اللازم لاكمال الحفر يختلف من بئر الى اخر. هذه الدراسه تبين اهميه اختيار نوع الحافره ومعاملات الحفر الاخرى المتمثله بالوزن المسلط على الحافره والسرعه دوران عمود الحفرومعدل الجريان اعتمادا على معلومات الابار المحفوره مسبقه في حقل مجنون النفطي. اعتماد البيانات الحقليه للابار المحفورة مسبقا تشكل مصدرا اساسيا لتحسين معدل اختراق الحافره, لذلك تم اجراء دراسه مكثفه لثلاثه ابار مائله وبدرجه 35 (مجنون 51,مجنون 52,مجنون54) حيث تم استنتاج انه معاملات الحفرونوع الحافره المستخدمه في (مجنون 54) الانسب لحفر مقاطع (36,24,16,12.25)انج بينما معاملات الحفر المستخدمه لحفر مقطع (8.5) في (مجنون 51) هي الانسب لحفر الابار مستقبلا".


Article
Enhancing Drilling Parameters in Majnoon Oilfield
تحسين ادائيه معاملات الحفر في حقل مجنون النفطي

Authors: Majid M. Majeed --- Ayad A. Alhaleem
Journal: Iraqi Journal of Chemical and Petroleum Engineering المجلة العراقية للهندسة الكيمياوية وهندسة النفط ISSN: 19974884/E26180707 Year: 2019 Volume: 20 Issue: 2 Pages: 71-75
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The objective of drilling parameters optimization in Majnoon oilfield is to arrive for a methodology that considers the past drilling data for five directional wells at 35 degree of inclination as a baseline for new wells to be drilled. Also, to predicts drilling performance by selecting the applied drilling parameters generated the highest rate of penetration (ROP) at each section. The focal point of the optimization process is to reduce drilling time and associated cost per each well. The results of this study show that the maximum ROP could not be achieved without sufficient flow rate to cool and clean the bit in clay intervals (36" and 24") hole sections. Although the influence of combination of Weight on Bit (WOB), Round per minute (RPM), and hydraulic horsepower on the bit in (16", 12 1/4" and 8 1/2") hole sections is a key to reduce drilling time, therefore, the drilling parameters produced the fastest ROP per each section was considered as optimum parameters likely to apply for the future wells.

الغرض من تحليل معاملا ت الحفر المستخدمه في حقل مجنون النفطي هو الوصول الى وسيله تعتبر البيانات المتوفره للابار المحفوره سابقا" لخمسه ابار مائله بدرجه 35 اساس للابار التي سوف يتم حفرها مستقبلا", كذلك يتم استخدامها لتخمين ادائيه الحفر بالاعتماد على معاملات الحفر المختاره بناءا" على اقصى معدل اختراق لكل مقطع. الهدف الاساسي من اختيار المعاملات المثاليه اثناء عمليه الحفر هو لتقليل الوقت المرا د به الوصول الى نهايه كل مقطع وبالتالي تقليل الكلفه الاقتصاديه لكل بئر يتم حفره, الاستنتاج الرئيسي من هذا البحث هو معرفه المتطلبات الاساسيه للحصول على اعلى معدل اختراق والذي لايمكن تحقيقه من غير تسليط معدل جريان مناسب لتنظيف وتبريد الحافره في المقطعين (36" و 24") كذلك لايمكن تحقيق اعلى معدل اختراق من غير الموازنه بين الوزن المسلط على الحافره وسرعه دوران عمود الحفر في كل من المقاطع (16"و12.25"و 8.5"), لذلك كلما زاد معدل اختراق الحافره انخفض الوقت اللازم لاكمال البئر وبالتالي كلفه اقل بالاعتماد على معاملات الحفر التي حققت اعلى معدل حفرفي حقل مجنون النفطي.


Article
Formation Evaluation for Nasiriyah Oil Field Based on The Non-Conventional Techniques

Authors: Ayad A. Alhaleem --- Antwan M. Avedisian --- Haider Alwan Flayeh
Journal: Iraqi Journal of Chemical and Petroleum Engineering المجلة العراقية للهندسة الكيمياوية وهندسة النفط ISSN: 19974884/E26180707 Year: 2015 Volume: 16 Issue: 1 Pages: 71-78
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The unconventional techniques called “the quick look techniques”, have been developed to present well log data calculations, so that they may be scanned easily to identify the zones that warrant a more detailed analysis, these techniques have been generated by service companies at the well site which are among the useful, they provide the elements of information needed for making decisions quickly when time is of essence. The techniques used in this paper are:•Apparent resistivity Rwa technique.•Rxo /Rt method. The above two methods had been used to evaluate Nasiriyah oil field formations (well-NS-3) to discover the hydrocarbon bearing formations. A computer program had used to represent CPI results for the two mentioned methods, the results of interpretation indicate to hydrocarbon zones in.


Article
Torque and Drag Forces Problems in Highly Deviated Oil Well
مشاكل قوى عزم الدوران والسحب في الابار النفطية شديدة الميلان

Authors: Hasan Ali Neamah --- Ayad A.Alhaleem A.Alrazzaq
Journal: Iraqi Journal of Chemical and Petroleum Engineering المجلة العراقية للهندسة الكيمياوية وهندسة النفط ISSN: 19974884/E26180707 Year: 2018 Volume: 19 Issue: 3 Pages: 19-31
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Excessive torque and drag can be critical limitation during drilling highly deviated oil wells. Using the modeling is regarded as an invaluable process to assist in well planning and to predict and prevent drilling problems. Identify which problems lead to excessive torque and drag to prevent cost losses and equipment damage. Proper modeling data is highly important for knowing and prediction hole problems may occur due to torque and drag and select the best method to avoid these problems related to well bore and drill string. In this study, Torque and drag well plan program from landmark worldwide programming group (Halliburton Company) used to identify hole problems.one deviated well in Zubair oil fields named, ZB-250 selected for analyses the effect of friction factor on torque and effective `tension of the drill string along well depth, moreover the effect of well bore problems such as; mud losses, accumulation of cutting bed in the well bore, stuck pipe, caving, sloughing, high torque and drag values on drill string components and well trajectory. Wells data which include hole section size, mud properties, well profile survey, casing string depth, rig specification, drill string components, drilling parameters like weight on bit, rotary speed and flow rate were used to compare between planning and drilling stages for these wells and identify the reasons of difference between these stages. The results showed a difference for the drilling phase and increasable in effective tension, torque, pick up and slack off drag, measured string weight, and possibility to occur the buckling if compare with planning phase. Wellbore instability, high friction factor, high tortuosity, high flow rate ,stuck pipe , excessive drag spot, partial to total losses, increase of drilling parameters, hard formations and bad hole cleaning, all these factors yield to this difference between planning and actual phases. When drilling hole section 8.5", the main causes of varying were drilling fluid losses, high value of friction factor, stuck pipe and friction forces when the maximum torque was (16 to 20 klb-ft) and pick up weight (20-40 klb)

العزم والسحب الزائد من المحددات الحرجة اثناء حفر الابار شديدة الميلان. استخدام النموذج يعد عملية ذات قيمة للمساعدة في تخطيط البئر والتنبؤ لتجنب مشاكل الحفر. علاوة على ذلك تشخيص اي من مشاكل البئر تؤدي الى العزم والسحب العالي لتجنب خسارة الاموال وتضررالمعدات. استخدام بيانات النموذج المناسبة مهمة جدا لمعرفة وتنبؤ مشاكل البئر التي تحدث نتيجة العزم والسحب واختيار الطريقة الافضل لتجنب هذه المشاكل بالنسبة لمقطع البئر وخيط الحفر.في هذه الدراسة برنامج تخطيط البئر الخاص بالعزم والسحب من مجموعة لاندمارك العالمية للبرمجيات (شركة هاليبرتون) استخدم لتشخيص مشاكل البئر.بئر مائلة في حقل الزبير النفطي باسم- زبير- 250 اختيرت لتحليل تأثير معامل الاحتكاك على العزم والشد المؤثر لخيط الحفر خلال عمق البئر،علاوة على ذلك تأثير مشاكل مقطع البئر مثل فقدان سائل الحفر، تجمع قطع الفتات الصخري في مقطع البئر، استعصاء الانابيب ، التكهف والانسلاخ لجدار البئر اضافة الى قيم العزم الدوراني والسحب العاليين على مكونات خيط الحفر ومسار البئر. بيانات البئرالتي تشمل حجم مقطع البئر, مواصفات طين الحفر,مسح مقطع البئر,عمق انابيب البطانة,مواصفات جهاز الحفر,مكونات خيط الحفر,معاملات الحفر مثل الوزن على البريمة ,سرعة الدوران و معدل التدفق استخدمت للمقارنة بين حالتي التخطيط والحفر الفعلي لهذه الابار وتحديد اسباب الاختلاف بين المرحلتين.اظهرت النتائج اختلافا في مرحلة الحفر اي زيادة في الشد الفعلي وكذلك في العزم الدوراني والسحب للاعلى والاسفل ووزن عمود الحفر المقاس واحتمالية حدوث التواء لخيط الحفر اذا ماقورنت مع مرحلة التخطيط.عدم استقرارية مقطع البئر,معامل الاحتكاك العالي,التعرج العالي للبئر,معدل التدفق العالي,استعصاء الانابيب,مناطق السحب الزائد,الفقدان الجزئي والكلي,الزيادة في متغيرات الحفر,الطبقات الصلبة والتنظيف غير الجيد للبئر.كل هذه الغوامل تؤدي الى هذا الفرق بين المخطط له والحالة الحقيقية. عند حفر مقطع البئر 8.5 انج كانت الاسباب الرئيسية لهذا الاختلاف هو فقدان سائل الحفر,معامل الاحتكاك العالي,استعصاء الانابيب وقوى الاحتكاك حيث ان اعلى عزم دوراني هو بين (16-20) كيلو باوند – قدم ووزن السحب للاعلى بين (20 – 40) كيلو باوند.


Article
Development of East Baghdad Oil Field By Clusters of Horizontal Wells
تطوير حقل شرق بغداد النفطي بواسطة مجاميع من الآبار الافقية

Loading...
Loading...
Abstract

There are varieties of reasons lead for drilling horizontal wells rather than verticals. Increasing the recovery of oil, especially from thin or tight reservoir permeability is the most important parameter.East Baghdad oil field considered as a giant field with approximately more than 1billion barrel of a proved reserves accompanying recently to low production rate problems in many of the existing wells. It is important to say that presence of of horizontal wells in East Baghdad field especially by converting some of already drilled wells by re-entry drilling horizontal sections may provide one of best solutions for the primary development stage in East Baghdad field which may be followed by drilling new horizontal wells or using multilateral wells. Advance software (Well Test/FAST) has been used to convert the production data for the already drilled vertical wells to horizontals to simulate the productivity. It can be concluded that no measurements available for the ratio of anisotropy (Kv/Kh); in East Baghdad Oil Field therefore, the wells productivity has been estimated using wide range of anisotropy ratios that will help the field operator to determine exactly wells productivity. Moreover, it helps to recommend the effectiveness of applying hydraulic fracturing in improving horizontal well productivity. The results show that it could be used well EB-32 as a re-entry horizontal well with an optimum section length of 1500-2000ft wich give the best production rate. The same result could be stated for EB-10 with somewhat higher productivity than EB-32.

توجد العديد من الاسباب التي تؤدي الى تفضيل حفر الآبار الافقية على الآبارالعمودية.زيادة استخلاص النفط من التراكيب القليلة السمك او المكامن القليلة النفاذيه يعتبر من اهم العوامل لاختيار هذه الطريقة من الحفر. يعتبر حقل شرقي بغداد النفطي من الحقول النفطية العملاقه باحتياطي مؤكد يتجاوز 11 مليار برميل نفطي يترافق معه حاليا مشكلة الانتاج القليل في العديد من الآبار الموجودة. لذلك فان دراسة استخدام الآبار الافقية في حقل شرقي بغداد وخصوصا تغيير بعض الآبار المحفورة باعادة حفر بعض المقاطع منها افقيا قد يعتبر واحدا من افضل الحلول التطويرية في هذا الحقل والذي يمكن ان يتبع بحفر آبار افقية او استخدام الحفر متعدد الاذرع. تم استخدام برنامج متطور(مع بعض التحويرات) لتغيير الآبار العمودية الحالية الى افقية لتحسين الانتاج. تبين نتائج الدراسه انه يمكن استنتاج انه لاتوجد قياسات حقليه للنسبه(النفاذيه العموديه /النفاذيه الافقيه) في حقل شرقي بغداد النفطي وعليه فان انتاجية الابار قد تم تخمينها باستخدام مدى واسع من نسب تباين النفاذيه والتي ستساعد مشغلي الحقل في حساب او معرفة انتاجية الابار بصورة دقيقة. اضافة الى ذلك فانها تساعد في التوصية بكفاءة استخدام تقنية التشقيق الهايدروليكي لتطوير انتاجية الابار الافقيه في حقل شرقي بغداد النفطي.اظهرت النتائج انه يمكن استخدام البئر EB-32 كبئر افقي جديد مع امثل مقطع افقي بطول (1500-2000) قدم والذي سيعطي افضل معدل انتاج و يمكن الحصول على نفس النتيجة مع البئر EB-10 مع معدل انتاج اعلى مقارنة بالبئر EB-32


Article
Torque and Drag forces challenges in highly deviated oil well (Zubair oil field)
تحديات قوى عزم الدوران والسحب في الابار شديدة الميلان (حقل الزبير النفطي)

Loading...
Loading...
Abstract

The benefits from doing this analytical study in order to be able to measure and predict the frictional forces affecting a drill string and wellbore (Torque and drag) by construct model of well plan software, hence; the high deviated and directional wells must be planned to keep the torque and drag forces at a minimum and allowable limit. Also, knowledge of the drill string phenomena can give us an opportunity to choose drill string components that consider these extra forces involved in the operations "high torque and drag values" in directional sections. In addition to knowledge of influence torque and drag on planned well trajectory can give us a good idea and lesson learned to consider this challenges in the next planned well profile. As a result of well path design one of the best ways to reduce torque and drag forces. One deviated well in Zubair oil field named, ZB-348 have been selected for analyses torque and drag problems and study the effect of (friction factor, well profile and drill string design) on the mentioned problem.Well data include hole section size, fluid properties, well profile survey, rig specification, drill string details and drilling parameters were used in well plan software from landmark worldwide programming group to make a comparison between actual and planning status.The results show a difference between planning and actual case when drilling 12.25" hole and found the root causes for this difference are high flow rate, tortuosity, well bore instability and complete losses. The maximum torque about (20 klb-ft) and drag value approximately (30 klb).

Listing 1 - 8 of 8
Sort by
Narrow your search

Resource type

article (8)


Language

English (7)

Arabic and English (1)


Year
From To Submit

2019 (4)

2018 (2)

2016 (1)

2015 (1)