research centers


Search results: Found 7

Listing 1 - 7 of 7
Sort by

Article
Estimate The Time of Achievement of Activities of The Project Depending on the Properties of Prime Numbers.

Author: Barraq Subhi Kaml
Journal: Journal of University of Babylon مجلة جامعة بابل ISSN: 19920652 23128135 Year: 2018 Volume: 26 Issue: 3 Pages: 10-21
Publisher: Babylon University جامعة بابل

Loading...
Loading...
Abstract

The most important features of our time is to compete and development in all fields of life, among the most important these fields is building and construction, although the important role that represents construction projects in real life, but it is exposed to a number of problems and most of these problems are the delay in the completion of the non-receipt of the project on schedule,The reasons for this delay were not to using the scientific planning and review the projects like the method of networking analysis. By this paper, we tried to show new technique to estimate the time of achievement of activities of the project depending on the properties of prime numbers for fuzzy network.

ان من أهم سمات عصرنا هذا هو التنافس والتطور في جميع مجالات الحياة، ومن بين أهم هذه المجالات هو مجال البناء والتشييد, فعلى الرغم من الدور الهام المتمثل بمشاريع البناء في الحياة العملية الا انها تتعرض لعدد من المشاكل ومعظم هذه المشاكل هو التأخير في انجاز المشروع في الموعد المحدد له, أسباب هذا التأخير لعدم استخدام التخطيط العلمي ومراجعة المشاريع مثل تحليل الشبكات , في هذا البحث استعراضنا اسلوب جديد مقترح في تقدير اوقات انجاز فعاليات المشروع معتمداً على خصائص الاعداد الاولية لشبكة الاعمال المضببة, ومقارنته مع اساليب اخرى وقد تعزز البحث بتنفيذ الاسلوب المقترح على حالة دراسية مستمدة من بيانات واقعية.


Article
The Role of Goal Linear Mathematical Models to Improving Supply Chain with Fuzzy Demand

Author: Barraq Subhi Kaml
Journal: Tikrit Journal For Administration & Economics Sciences مجلة تكريت للعلوم الادارية والاقتصادية ISSN: 18131719 Year: 2019 Volume: 15 Issue: 46 Part 1 Pages: 1-13
Publisher: Tikrit University جامعة تكريت

Loading...
Loading...
Abstract

Supply chain management is of great importance, especially in commercial conditions, where supply chain management has become very important for many reasons, including development in many fields, including information technology. Supply chain management is an important issue in industrial companies for its distinctive and important role. As the information technology contributes effectively to reduce the effort human resources and speed and thus contribute to the management of the supply chain effective contribution to the development of optimal production policies (manufactures) and distribution of products and warehouse management, which generates the lowest total costs of the company and this study focused on supply chain management of its importance in this area. The main objective of this study is to focus on the importance of building a model in supply chain management in addition to providing the model in supply chain management using the programming objectives and uncertainty environment represented by ambiguous numbers.


Article
A Technique To Solve The Multi Index Transportation Problems

Author: Assistant Lecturer Barraq Subhi Kaml
Journal: Journal of Baghdad College of Economic sciences University مجلة كلية بغداد للعلوم الاقتصادية الجامعة ISSN: 2072778X Year: 2015 Issue: 44 Pages: 449-462
Publisher: Baghdad College of Economic Sciences كلية بغداد للعلوم الاقتصادية

Loading...
Loading...
Abstract

In this paper, the problem multi-index transportation with intermediate resource centers (warehouses) was taken. The mathematical model of this problem and discussed possible approaches using known algorithm (orlin,1993, 338) to solve it. We applied this algorithm for finding optimal Plan distribution goods that corresponds to criteria optimality in the volume of production, consumption, and the amount of storage stocks.

تعتبر تطبيقات مسائل البرمجة الخطية متعدده المؤشر Multi index linear programming problems ذات اهمية كبيره في مجالات متعدده, أمثلة على ذلك مشاكل تخصيص الموارد في النظم الهرمية: معالجة مشاكل مكثفات الغاز , مشاكل نقل البيانات في الوصلات ذات السعة المحدودةوغيرها من المشاكل .في هذا البحث تم تناول اصناف البرمجة الخطية متعدده المؤشر , كذلك العروج الى مسائل النقل عندما تكون هناك محطات وسطية بين الوحدات المنتجة والوحدات المستهلكه وقد تم بناء خريطة التي توضح عمل خوارزمية orlin المستخدمة لحل النموذج النقل المتكون من ثلاث مؤشرات, اضافة الى ما تقدم فقد تناول البحث مثال يبيناسلوب الحل


Article
A New Approach for Determining A Redundant Constraint In Linear Programming Problems

Author: Assistant Lecturer Barraq Subhi Kaml
Journal: Journal of Baghdad College of Economic sciences University مجلة كلية بغداد للعلوم الاقتصادية الجامعة ISSN: 2072778X Year: 2015 Issue: 45 Pages: 490-499
Publisher: Baghdad College of Economic Sciences كلية بغداد للعلوم الاقتصادية

Loading...
Loading...
Abstract

Linear Programming is a mathematical technique to help plan and make decisions relative to the trade-offs necessary to allocate resources, will find the minimum or maximum value of the objective and Guarantees the optimal solution to the model formulated. Linear programming is a widely used mathematical modeling technique to determine the optimum allocation of scarce resources among competing demands, but in the formulation stage in linear programming Problems (LPP)may occurRedundancy that is belonging tothe tackyorigin data or to keeping away from the risk of neglecting some relevant constraints while modeling a problem. The existence of redundant constraints is common situation that occurs in large LP formulation.This paper presents a new approach for selecting a constraint in linear programming problems to identify the redundant constraints

تعتبر البرمجة الخطية احدى الاساليب التي تساعد في التخطيط واتخاذ القرارات المتعلقة في تخصيص الموارد والتي بدورها تجد القيمة العظمى او الادنى لدالة الهدف الخاضعة لعديد من القيود, ويضمن الحل الامثل للنموذج المصاغ.للبرمجة الخطية استخدامات واسعة للاساليب الرياضية التي تحدد التخصيص الامثل للموارد النادرة, ولكن ما يحدث في البعض من تلك النماذج ما يعرف بالقيود الفائضة ويعود ذلك الى سوء مصدر البيانات او لتجنب المخاطرة في اهمال بعض القيود - بالنسبة لصائغ النموذج الرياضي- , ان ظاهره الفائض غالبا ما تحدث في نماذج البرمجة الخطية الكبيره, في هذا البحث تم اقتراح اسلوب رياضي يحدد القيد الفائض في نماذج البرمجة الخطية.


Article
Sensitivity Analysis in Linear Programming with Real Application
تحليل الحساسية في البرمجة الخطية مع تطبيق عملي

Author: Barraq Subhi Kaml براق صبحي كامل
Journal: Diyala Journal For Pure Science مجلة ديالى للعلوم الصرفة ISSN: 83732222 25189255 Year: 2017 Volume: 13 Issue: 1 - part 2 Pages: 1-21
Publisher: Diyala University جامعة ديالى

Loading...
Loading...
Abstract

linear programming occupies at the present time a prominent place in different areas and have wide applications, where lies its importance as a means of studying the behavior of a large number of systems as well as it is the simplest and easiest types of models that can be created to handle the dilemmas of industries and commercial, military, and other In this paper, we treated with the solution post optimality or as it's known Sensitivity Analysis by using the principle of Shadow Prices, The scientific solution to any problem not be a complete solution as soon as access to the best solution, That any change in the model (constants values) or what is known as input data will change the linear programming problem and will affect the best solution and we need to methods to help us in the style of standing on the effect of changing these constants on the best solution tastiest reached It was addressed general concepts of dual model and Some theories of sensitivity analysis, we take real data from The Texago Corporation is a large, fully integrated petroleum company based in the U.S.A., formulated the mathematical model and obtain the optimal results by package winqsb and finally calculated the Shadow Prices for binding constraints, Add to the above stated, we reviewed in this paper linear programming model under fuzzy environment and use a new method based on prime numbers

تحتل البرمجة الخطية في الوقت الحاضر مركزاً مرموقا في مجالات مختلفة ولها تطبيقات واسعة , اذ تكمن اهميتها بكونها وسيلة لدراسة سلوك عدد كبير من الانظمة كذلك فانها تعد ابسط واسهل انواع النماذج التي يمكن انشاؤها لمعالجة معضلات صناعية وتجارية وعسكرية واخرى ,فهي مجموعة من الاساليب الفنية التي يمكن بواسطتها الحصول على المقدار الكمي الامثل.في هذا البحث تعاملنا مع الحل ما بعد الامثلية post optimality او ما يعرف بتحليل الحساسية Sensitivity Analysis باستخدام مبدء اسعار الظل Shadow Prices ,ان الحل العلمي لاي مشكلة لايكون حلاً كاملاً بمجرد الوصول الى الحل الامثل , ان اي تغيير في قيم ثوابت النموذج او ما يعرف بمدخلات النموذج الذي سيغير من مشكلةالبرمجة الخطية وسيؤثر على الحل الامثل وعليه نحن بحاجة الى اسلوب يساعدنا في الوقوف على اثر تغير هذه الثوابت على الحل الامثل الذ تم التوصل اليه , كذلك تم تناول مفاهيم عامة عن النموذج الثنائي وبعض النظريات المتعلقة بتحليل الحساسية واعتمدنا على بيانات حقيقية لشركة تنقل النفط الخام ومشتقاته وقد تم صياغة النموذج الرياضي لها والتوصل للحل الامثل باستخدام برنامج الحاسوب الجاهز winqsb ومن ثم حساب قيم اسعار الظل للقيود المستنفدة binding constraints , اضافة لما ذكر اعلاه فقد استعرضنا في هذا البحث نموذج البرمجة الخطية في ظل البيئة الضبابية واستخدم فيه اسلوب جديد يعتمد على الاعداد الاولية prime numbers في حل معالم النموذج الضبابية.


Article
Solving the Multi-Objective Travelling Salesman Problem with Real Data Application

Authors: Barraq Subhi Kaml --- Mohamed Saad Ibrahim
Journal: Al-Nahrain Journal of Science مجلة النهرين للعلوم ISSN: (print)26635453,(online)26635461 Year: 2018 Volume: 21 Issue: 3 Pages: 146-161
Publisher: Al-Nahrain University جامعة النهرين

Loading...
Loading...
Abstract

The aim of this paper is building a mathematical model for Travelling salesman problem (TSP) with multi-objective; the model describes the problem of (TSP) with three objectives (cost, distance, time), Real data were collected with a sample of twenty states of United State of America, Three methods were used (Branch and Bound algorithm, Nearest neighbor and two-way exchange improvement heuristic), The comparison was conducted among results reached. To solve the problem multi-objective of (TSP), The weighted model demonstrated the effectiveness and flexibility to solve real problems of multi-objective (TSP), where it can be said that it is impossible to solve this problem without resorting to multiple -objective mathematical models, In other words, the number of possible rout for the 20 town is , to find the optimal routs among these routs it takes very long time and a lot of effort, here stand out importance of two-way exchange improvement heuristic algorithm, where this rout is satisfactory to the decision maker in terms of cost, distance and time.


Article
An Algorithm Proposal for Solving Two- Level Model Of Production And Transportation Problem
طريقة مقترحة لحل مشاكل الإنتاج والنقل ثنائية المستوى

Authors: Ivokhin E.V. يف كيني فكتروفج --- Barraq Subhi Kaml براق صبحي كامل
Journal: Al-Ma'mon College Journal مجلة كلية المامون ISSN: 19924453 Year: 2014 Issue: 24 Pages: 208-216
Publisher: AlMamon University College كلية المامون الجامعة

Loading...
Loading...
Abstract

Principles of block optimization simplify analysis, decision and meaningful response of many problems of planning and management. These methods can be divided into a complex production- transportation problem (PTP) to autonomous production planning problem and organizing the delivery of products. On the other hand, interpretation of the results in terms of content is often enough to determine sustainable approaches functioning various economic and technical systems.

لقد تم في هذا البحث وصف مسائل الانتاج والنقل حيث استعرضت فيه النماذج العامة للانتاج والنقل اضافة الى نموذج الانتاج والنقل ذو المستوى الثنائي.ان الهدف من البحث هو الحصول على ايجاد الحل الامثل لنماذج الانتاج والنقل المتقطعة باستخدام طريقة او خوارزمية مقترحة المتمثله بالاسلوب التكراري للمتغيرات الاصطناعية اضافة لما تقدم فقد تناول البحث الجوانب العملية والحقول المختلفة التي يمكن ان تطبق فيها هذه الطريقة .

Listing 1 - 7 of 7
Sort by
Narrow your search

Resource type

article (7)


Language

English (6)

Arabic (1)


Year
From To Submit

2019 (1)

2018 (2)

2017 (1)

2015 (2)

2014 (1)