Article
Developing Multistage Heuristic Algorithm To Minimize Idle Time And Makespan In Job Shop Scheduling
بناء خوارزمية توجيهية متعددة المراحل لتدنية الوقت العاطل ووقت الأنهاء الأكبر في جدولة الأنتاج الوظيفي

Author: Mahmoud Abbas Mahmoud
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2010 Volume: 28 Issue: 14 Pages: 4789-4805
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

The behavior and performance of job shops have been the focus andattention in both operations research and operations management literature. Job shop scheduling has received this large amount of attention, because it has the potential to dramatically decrease costs and increase throughput, thereby, profits. Moreover, the increasing of product customization creates more job shop environment in manufacturing world. No doubt, a wide variety of approaches tothe modeling and solution of job shop scheduling problems have been reported in the literature. But, the research in this area is continuous. In this paper, Multistage Heuristic Algorithm based on priority dispatching rules is developed. This algorithm has been implemented to solve three cases. Schedules generated havebeen compared with those obtained by means of the basic algorithm. As a result, Multistage Heuristic Algorithm shows the ability of minimizing: machines idle time, total time of machines and makespan.

لقد لقى موضوع طبيعة وأداء نظم الانتاج الوظيفي اهتماما ملحوظا في أدبياتموضوعي بحوث العمليات وادارة العمليات على السواء. و يعودالسبب في هذا الحجم الواسع من الاهتمام بجدولة العمليات في نظم الانتاج الوظيفي لما لهذا الموضوع من أثر كبير في خفض الكلفة وزيادة الأنجاز وبالتالي زيادة الربح. اضافة لما ورد فان الازدياد بالتوجه نحو الانتاج التخصصي قد ادى الى توسع مساحة بيئة الانتاج الوظيفي في عالم التصنيع. لاشك بأنه يوجد في الأدبيات تنوعا واسعا في اساليب النمذجة والحل لمشكلة الجدولة هذه ولكن البحث في هذاالمجال مازال مستمرا. في هذه الورقة تم بناء خوارزمية توجيهية متعددة المراحل مبنية على قواعد الاسبقيات في التقديم. هذه الخوارزمية قد طبقت في حل ثلاث حالات وتم مقارنة الجدولة الناتجة لكل حالة مع تلك الناتجة من تطبيق الخوارزمية الاساسية. وقد اوضحت النتائج بان الخوارزمية الجديدة ادت الى تقليل الوقت العاطل والوقت الكلي للمكائن وكذلك وقت الأنهاء الأكبر.


Article
Process Capability Evaluation for a Non-normally Distributed One
تقییم مقدرةعملیة غیر خاضعة للتوزیع الطبیعي

Authors: Samah Ali Aufy --- Mahmoud Abbas Mahmoud
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2013 Volume: 31 Issue: 17 Part (A) Engineering Pages: 3245-3258
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

The common process capability indices (PCIs) Cp, Cpk, Cpm are widely used inpractice. The use of these PCIs is based on the assumptions that process is incontrol and its output should be normally distributed. In practice normality is notalways fulfilled. Therefore, the use of common PCIs leads to erroneous incapability evaluation. In this paper, capability evaluation for non-normallydistributed process is carried out in industrial environment with two approaches.The first includes transforming data to normally distribute by Box-Coxtransforming method then using the common PCIs. This method failed to transformthese data. The second approach includes the use non-normal percentile methodwith Burr XII distribution. This paper proves that the second approach is moreeffective in evaluating the capability of this process. Practical case is applied in theState Company for Electrical Industries (SCFEI) particularly in (Water Pump)factory and Minitab 16 Software is used to reduce the long calculation of statisticalvalues and to plot control charts.


Article
Balancing Mixed-Model Assembly line in Electronic Industries Company
موازنة لخط تجميع مختلط النموذج في شركة الصناعات ألالكترونية

Authors: Sawsan Sabeeh Al-Zubaidy --- Mahmoud Abbas Mahmoud --- Israa Dhiaa Khalaf
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2016 Volume: 34 Issue: 2 Part (A) Engineering Pages: 233-244
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

In this work, an approach to solve mixed-model assembly line balancing Problem has been suggested which consists of six stages. In the fourth stage of this approach, a heuristic method is suggested for solving the combined model. This method is programmed using C# language. This program is called “Assembly line balancing-Method of Merging Shortest and Longest Operation" symbol by (MMSLO), which is based on merging two heuristic methods “Shortest Operation time" (SOT) and “Longest Operation Time" (LOT). This approach has been applied in the actual industrial environment at Electronic Industries Company (EIC) in assembly plant for assemble three models of automatic changeover (ACH). The results of the suggested method in (MMSLO) program compared with the results of the basic method (SOT) and (LOT) that existed in"production and operations management, quantitative methods" software that symbol by (POM-QM). It has been proved the ability of the suggested method to give a better solution than the traditional methods, in which the efficiency increased from 92.75% for (LOT) method and 86.98% for (SOT) method to 93.53% for the suggested method.

في هذا العمل أُقترح أسلوب لحل مشكلة موازنة خطوط التجميع المختلطة النموذج والتي تتكون من ست مراحل. المرحلة الرابعة من هذا الاسلوب أُقترحت طريقة توجيهية لموازنة النموذج المركب (combined model). بُرمجت هذة الطريقة باستخدام لغة C# وسمي البرنامج "موازنة خط التجميع- طريقة دمج أقصر وأطول عملية" ويرمز له (MMSLO), تعتمد هذه الطريقة على دمج طريقتين من الطرق التوجيهية " اقصر وقت تشغيل"(SOT) و"اطول وقت تشغيل"(LOT) . طُبق الاسلوب في بيئة صناعية لشركة الصناعات الالكترونية في معمل التجميع لتجميع ثلاثة انواع من المغير الاوتوماتيكي. قورنت النتائج المأخوذة من برنامج (MMSLO) مع طريقتي (SOT) و(LOT) الموجودة ضمن البرامجية الجاهزة "الانتاج وأدارة العمليات, الاساليب الكمية"ويرمز له(POM-QM).أُثبتت قابلية الطريقة المقترحة على إعطاء حل أفضل من الطرق التقليدية, والتي أدت الى زيادة الكفاءة من 92.75% لطريقة (LOT) و 86.98% لطريقة (SOT) الى 93.53% للطريقة المقترحة.


Article
DEGREES OF FREEDOM ANALYSIS IN PRODUCT ASSEMBLING
تحليل درجات الطلاقة في تجميع منتوج

Authors: Mahmoud Abbas Mahmoud محمود عباس محمود --- Rasha Jabbar Marzoq رشا جبار مرزوك
Journal: Al-Qadisiyah Journal for Engineering Sciences مجلة القادسية للعلوم الهندسية ISSN: 19984456 Year: 2011 Volume: 4 Issue: 4 Pages: 483-496
Publisher: Al-Qadisiyah University جامعة القادسية

Loading...
Loading...
Abstract

Assembly sequence generation is one of the major difficulties in assembly planning process. In this paper, disassembly sequence generation has been used as approach to generate products assembly sequence. Assembly sequence is generated here by tracing disassembly steps starting with completed product and working backward down to its basic components. Practically, in this work degrees of freedom DOFs analysis has been used to generate disassembly sequence. The approach has involve six steps proposed generate assembly sequence. This approach has been implemented on a virtual product and shows its ability to generate assembly sequence for the product in question.

تمثل عملية توليد تسلسل التجميع احد الصعوبات الكبرى في عملية التخطيط للتجميع. في هذا البحث، اتخذ تسلسل التفكيك طريقا لتوليد تسلسل التجميع حيث تم تتبع عملية التفكيك بالعودة إلى الخلف بدءا من المنتوج النهائي ولحين الوصول إلى مكوناته الأساسية. تم هنا الاستفادة من تحليل درجات الحرية لمكونات المنتوج لغرض الوصول إلى التسلسل الممكن لعمليات التفكيك. وعليه تم في هذا البحث تقديم منهجية مقترحه متكونة من 6خطوات لتوليد تسلسل التجميع. تم تطبيق هذه المنهجية على منتوج افتراضي وقد أظهرت قابلية على توليد تسلسل لتجميع ذلك المنتوج.


Article
Assessing New Product Sustainability Index (NPSI) by Integrating Sustainability Aspects into the Early New Product Design Stages
تقدیر مؤشر الاستدامة لمنتج جدید بدمج سمات الإستدامة مع المراحل المبكرة لتصمیم المنتج

Authors: Abdulamir Bektas Wali --- Mahmoud Abbas Mahmoud --- Jamal Nasir H. Al Khatib
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2012 Volume: 30 Issue: 10 Pages: 1677-1695
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

Product design is one of the most important stages in the new product developmentprocess influencing global sustainability. However, the early design strategy offers thehighest impact on sustainability, the need for using sustainable proactive approach inearly design decisions could be the effective tool to achieve sustainability of newproducts. This paper presents a necessity of considering the sustainability aspects inpre-specification stages of new product design process, and introduces a modifiedmethodology for establishing a single Index termed as New Product SustainabilityIndex (NPSI) which enables the designers to carry out a quick analysis of thealternatives of new product designs and make choices based on various criteria. Theindex aggregates (TBL) and R & D aspects of different types of quantitative andqualitative indicators and information objects from a product manufacturing point ofview, into one single index. The sustainability matrix, aspects and criteria used inevaluating of (NPSI), is constructed in table form.

یعتبر تصمیم المنتج من المراحل المھمة في عملیة تطویر المنتج الجدید والت ي ت ؤثر عل ى الاس تدامةالةلماش. وبینما تقدم استراتیجیة التصمیم المبكر التأثیر الأعلى على الإس تدامة، ف إن الحاج ة ال ى إس تخداماس لوب اس تباقي للاس تدامة ف ي ق رارات التص میم المبك ر ق د تك ون الاداة الفعال ة لتحقی ق الاس تدامةللمنتجات الجدیدة. ان ھذا البحث یشیر الى ضرورة الاخذ بنظر الاعتبار سمات الاستدامة في مراح ل م ا قب ل المواص فة ف ي عملی ة تص میم المن تج الجدی د، ویق دم منھجی ة معدل ة لتأس یس مؤش ر منف رد یعب ر عن ھوال ذي یمك ن المص ممین م ن تنفی ذ تحل یلات س ریعة لب دائل (NPSI ) بمؤش ر الاس تدامة للمن تج الجدی دتصامیم المنتج الجدید والقی ام بإختب ارات قائم ة عل ى اس اس مع اییر مختلف ة. ویجم ع المؤش ر س مات خ طوس مات البح ث والتط ویر لمختل ف ان واع المؤش رات الكمی ة والنوعی ة (TBL) الأس اس الثلاث يوالمعلوم ات المقص ودة م ن وجھ ة نظ ر تص نیع المن تج بمؤش ر منف رد واح د. ت م ص یاغة مص فوفةىلع شكل جدول. (NPSI) الاستدامة والسمات والمعاییر المستخدمة في تقدیر


Article
Use of Critical path method inmaintenance planning of an electric power station
استخدام طريقة المسار الحرج لتخطيط اعمال الصيانة في محطة لانتاج الطاقة الكهربائية

Authors: Laith Noman Dawood ليث نعمان داود --- sawsan S.AL-zubaidy سوسن صبيح الزبيدي --- Mahmoud Abbas Mahmoud محمود عباس محمود
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2012 Volume: 30 Issue: 8 Pages: 197-211
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

In this work studying of the strategy of preventive maintenance in the stationwas conducted and spatial planning combustion chambers inspection (CI) by usingthe critical path method which an important tools for the planning of maintenancework was developed.In order to have accurate results for calculating early, latest, delay, and slack times, anddetermining the critical path time (WINQSB) Software which contain(CPM-BERT) programs has been used..The most important results of this study is in reducing the time of preventivemaintenance for combustion chambers inspection by two days. Furthermore, twoother days can be saved if the time for some of critical activities was crashed.

في هذا البحث تم استخدام المخططات الشبكية كاداة لتخطيط اعمال الصيانة في المحطةالغازيه لانتاج الطاقة الكهربائية جنوب بغداد بهدف العمل على تطويره، وباعتماد اسلوب المسارالحرج كاحد الاساليب العلمية لتخطيط اعمال الصيانة، وقد اختيرت تلك المحطة كونها تمتازبحداثتها، وبهدف الحفاظ على استمرارانتاج الطاقة الكهربائية لتامين حاجات المواطنين بأقلالتكاليف.تم دراسة اسلوب الصيانة الوقائية في المحطة بشكل عام وفعاليات فحص غرف الاحتراقللتورباين الغازي بشكل خاص، واستخدم أسلوب Combustion Chamber Inspection (CI)المسار الحرج للتخطيط لاجراء تلك الفعاليات.ولغرض الوصول الى نتائج دقيقة في حسابات الاوقات المبكرة والمتاخرة والفائض للفعالياتالتي تحتوي على حزمة برامج WINQSB الميكانيكية وتحديد المسار الحرج ووقته تم استخدام برامجيةتم التوصل الى امكانية تقليل الوقت اللازم لأعمال الصيانة الخاصة . (CPM-PERT) جاهزة منها بفحصغرف الاحتراق للاجزاء الميكانيكية لوحدة التوربين الغازي في المحطة بمقدار يومين من الوقتالحالي، واربعة ايام في حال تعجيل بعض فعاليات المسار الحرج


Article
Determination Optimum Inventory Level for Material Using Genetic Algorithm
تحديد مستوى الخزبن الامثل للمواد باستخدام الخوارزمية الجينية

Authors: Watheq Hayawi Laith . واثق حياوي لابذ --- Sawsan Sabeeh Al-Zubaidy سوسن صبيح الزبيدي --- Mahmoud Abbas Mahmoud محمود عباس محمود
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2018 Volume: 24 Issue: 1 Pages: 218-230
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The integration of decision-making will lead to the robust of its decisions, and then determination optimum inventory level to the required materials to produce and reduce the total cost by the cooperation of purchasing department with inventory department and also with other company,s departments. Two models are suggested to determine Optimum Inventory Level (OIL), the first model (OIL-model 1) assumed that the inventory level for materials quantities equal to the required materials, while the second model (OIL-model 2) assumed that the inventory level for materials quantities more than the required materials for the next period. This study was applied in Wasit Company for Textile Manufacturing in the Textile Factory, where it produces five products, which are printed striped, plain, poplin, dyed poplin and Naba weave. The products are made from cotton and they are passing through several stages to transfer to the final product. A genetic algorithm is used to determine the optimum quantity of the purchase a cotton and colors for each month and with minimum cost. Where the purchasing and transportation costs were either constant or variable with respect to purchased quantities while holding cost is kept constant. The results showed that the total cost of the first model is minimum than the second model because the holding cost for this model is less from the second model, while the purchasing and transportation costs from two models are equals. The percentage of purchasing cost for cotton is the biggest value, more 99% of purchasing cost for two models.

تكامل أتخاذ القرارات سيؤدي الى ترصين هذه القرارات ومن ثم تحديد مستوى الخزين الامثل للمواد المطلوبة والتي تكفي لعملية الإنتاج وأن تقليل الكلفة الكلية من خلال التنسيق بين قسم المشتريات وقسم الخزين وكذلك مع بقية أقسام الشركة الأخرى. تم اقتراح نموذجيين لتحديد مستوى الخزين الأمثل للمواد المطلوبة، في النموذج الأول تم افتراض أن مستوى الخزين يساوي المواد المطلوبة بينما في النموذج الثاني تم افتراض أن مستوى الخزين أكثر من المواد المطلوبة للفترة اللاحقة. هذه الدراسة طبقت في شركة واسط لصناعة المنسوجات في معمل النسيج، حيث ينتج خمس منتجات وهي البازة والسادة والبوبلين والبوبلين المطبوع ونسيج النبأ. المنتجات تصنع من القطن ويمر بعدة مراحل ليصبح منتج نهائي وقد استخدمت الدالة الجينية لتحديد أمثل كمية مشتراه من القطن والالوان لكل شهر وباقل كلفة حيث كانت كلف الشراء والنقل أما ثابته أو متغيرة مع الكمية المشتراة، بينما كانت كلف الاحتفاظ ثابتة. بينت النتائج ان الكلفة الكلية للنموذج الأول كانت أقل من النموذج الثاني لكون كلفة الاحتفاظ لهذا النموذج أقل بينما كلف النقل والشراء متساوية في النموذجين.نسبة كلفة الشراء لمادة القطن تجاوزت 99% من كلفة الشراء وللنموذجين.

Listing 1 - 7 of 7
Sort by
Narrow your search

Resource type

article (7)


Language

English (6)

Arabic (1)


Year
From To Submit

2018 (1)

2016 (1)

2013 (1)

2012 (2)

2011 (1)

More...