research centers


Search results: Found 2

Listing 1 - 2 of 2
Sort by

Article
SECONDARY ARC EXTINCTION IN EXTRA HIGH VOLTAGE SYSTEMS USING GROUNDING SWITCHES
اطفاء القوس الكهربائي الثانوي في منظومات الجهد العالي باستخدام مفاتيح تأريض

Authors: Qais M. Alias قيس متي الياس --- Wafaa F. Tobia وفاء فرج طوبيا
Journal: DIYALA JOURNAL OF ENGINEERING SCIENCES مجلة ديالى للعلوم الهندسية ISSN: 19998716/26166909 Year: 2014 Volume: 7 Issue: 1 Pages: 81-93
Publisher: Diyala University جامعة ديالى

Loading...
Loading...
Abstract

Long Extra High Voltage (EHV) transmission systems tend to bring a pronounced state of secondary arcing. Therefore, an essential pre-requisite for single-phase-switching application, is the possibility and speed of secondary arc final extinction during suitably short dead-time. During the past several decades, many techniques had been proposed and implemented in order to ensure fast secondary arc extinction. Among these was the use of High Speed Grounding Switches (HSGS’s). In such technique, the faulted phase is grounded via special switches; one at each end of the EHV line after the fault is cleared by both line ends circuit breakers. The primary advantage of grounding the faulted phase is the reduction of the fault point recovery voltage to a very low value. This, coupled with the circulation of opposite loop currents in the fault path, reduces the secondary arc current and lead to a fast secondary arc extinction. A sample 500kV, 300km transmission system equipped with High Speed Grounding Switches is modeled as a test system. The modified Fourier transform is used to calculate the system response through, fault, fault clearance, HSGS’s operation, and line restoration. The non-linearity of the secondary arcing state is also accounted for. The paper concludes with a presentation of some computational results related to the above mentioned EHV system showing that HSGS’s greatly improves the single-phase-switching performance.

الخلاصةتتسبب منظومات النقل ذات الجهد العالي (EHV) بحدوث حالة قوس كهربائي ثانوي مطولة بعد معالجة خطأ الطورالواحد الى الأرض. لتطبيق تقنية فتح وغلق الطور الواحد بعد ازالة الخطأ الأساسي، يجب ضمان امكانية وسرعة انطفاء القوس الكهربائي الثانوي بوقت قصير. خلال البضع عقود الماضية, تم عرض و تطبيق عدة تقنيات لضمان انطفاء القوس الكهربائي الثانوي بسرعة. احدى هذه التقنيات تضمنت استخدام مفاتيح التأريض السريعة (HSGS's). يتم تأريض الطور المخطوء في نهايتي خط النقل بعد معالجة الخطأ الأساسي بواسطة قواطع دورة النهايات للخط. الفائدة الأساسية لتأريض الطور المخطوء هي خفض الجهد الكهربائي لنقطة حدوث الخطأ، هذا مع سريان تيارات متعاكسة في مسار الخطأ يخفض تيار القوس الكهربائي الثانوي ويؤدي الى الأنطفاء السريع للقوس الكهربائي. نمذجت منظومة خط نقل، kV500، km300 مزودة ب(HSGS's) لأجراء الدراسة عليها. استخدم محول فورييه المعدل في حسابات الاستجابة لمراحل: حدوث الخطأ, ازالة الخطأ، عمل ال(HSGS's)، واعادة الطور المخطوء. اخذت بنظر الاعتبار الخواص اللاخطية للقوس الكهربائي الثانوي. عرضت النتائج الحسابية للمنظومة اعلاه التحسن الكبير لاداء تقنية الفتح والغلق للطور الواحد مع استخدام ال(HSGS's).


Article
The Iraqi Grid Electrical Demand: Questionable Forecast
حمل منظومة القدرة العراقية : توقع الاحمال

Authors: Kosay A. S. Majbor قصي عبدالستار مجبور --- Qais M. Alias قيس متي الياس --- Kadhim M. Sulaiman كاظم ميرا سليمان
Journal: Al-Ma'mon College Journal مجلة كلية المامون ISSN: 19924453 Year: 2017 Issue: 29 Pages: 190-201
Publisher: AlMamon University College كلية المامون الجامعة

Loading...
Loading...
Abstract

Electricity sector in Iraq has faced many problems and obstacles which have a great effect on the development and upgrading of the sector. Such problems involve the uncertainty of the load forecast which is partly due to the sudden rise in the consumer buying power after 2003 coupled with the electricity generation deficit. Various factors have led to this situation, such as the international blockade on Iraq, limited investments, fossil fuel delivery, successive wars, security issues and many others.The present work focuses on the load forecast for the Iraqi power network for the period (2016-2030). Two forecasting methods are dealt with here, viz. the averaging method and the maximum–minimum both proposed and implemented. Both methods produced a fairly matching load growth profile with the load forecast has been done under load shedding circumstances. The results obtained were close to the adopted load forecasts for the years 2015 and 2016.Microsoft Excel program was used to conduct the load forecast study. Data implemented were obtained from the National Dispatch Center (NDC) and the Planning and Studies Office (P&SO) / Ministry of Electricity.

واجه قطاع الكهرباء في العراق الكثير من المشاكل والعقبات المتعلقة بتطوير وتحسين القطاع, من هذه المشاكل عدم معرفة الحمل المستقبلي المتوقع, الارتفاع المفاجئ في القوة الشرائية للمستهلك بعد عام 2003 والذي تزامن مع عجز في إنتاج الطاقة الكهربائية لعدة أسباب منها الحصار الدولي المفروض على العراق, محدودية الاستثمار, مشاكل تجهيز الوقود للمحطات الجديدة, الحروب المتتالية, الأوضاع الأمنية وعوامل أخرى.في هذا العمل تم التركيز على كيفية حساب الحمل المتوقع لمنظومة القدرة الكهربائية العراقية للفترة (2016-2030). تم اقتراح وتنفيذ طريقة لتنبؤ الحمل خاصة بمعالجة البيانات العظمى والصغرى للحمل المجهز حيث كانت نتائج هذه الطريقة مطابقة وقريبة من منحنى الحمل المتوقع للأعوام 2015 و 2016 المعلنة من وزارة الكهرباء.تم استخدام برنامج معالج البيانات (Microsoft Excel) في حسابات الأحمال المتوقعة. البيانات المستخدمة في هذا العمل تم جمعها من مركز السيطرة الوطني ودائرة التخطيط والدراسات / وزارة الكهرباء.

Listing 1 - 2 of 2
Sort by
Narrow your search

Resource type

article (2)


Language

English (2)


Year
From To Submit

2017 (1)

2014 (1)