THE IMPACT OF INCOMPETENT CONTRACTOR ON THE PROJECT SCHEDULE
تأثير المقاول غير الكفؤ على الجدول الزمني للمشروع

Author: Samiaah M. Hassen Al-Tmeemy
Journal: Journal of Engineering and Sustainable Development مجلة الهندسة والتنمية المستدامة ISSN: 25200917 Year: 2017 Volume: 21 Issue: 3 Pages: 87-101
Publisher: Al-Mustansyriah University الجامعة المستنصرية

Loading...
Loading...
Abstract

The Iraqi construction remains challenging because of lack of basic amenities and is associated with enormous risks and terrorist actions. This status compels clients to wisely select the most efficient contractor that complies with both standard and special circumstances. This study aims to investigate the impact of choosing incompetent contractor on project schedule. The criteria of selection contractor that satisfy Iraqi construction industry were also investigated. Data were collected using an extensive historical data of 352 projects from the database of Diyala Governorate as well as conducting structured interviews with construction professionals from public organizations. Analysis of data showed that the current bidding process significantly impacts the performance of projects. In addition, the analysis revealed that the five most important criteria for selecting Iraqi contractors are: security and safety management, financial stability, past performance, relevant experience, and plant and equipment. Results would enhance the awareness of managers to the importance of tenders’ evaluation based on transparency and fairness.

يعاني قطاع البناء العراقي من عدم وجود المرافق الأساسية مقترنا بمخاطر الأعمال الإرهابية. هذا الوضع يفرض على اصحاب العمل ضرورة اختيار المقاول الأكثر كفاءة الذي يتوافق مع كل الظروف القياسية والخاصة .تهدف هذه الدراسة إلى التعرف على تأثير المقاول غير الكفؤ على الجدول الزمني للمشروع كذلك الكشف عن اهم معايير اختيار المقاول لتنفيذ الاعمال الانشائية بما يلبي قطاع البناء والتشييد العراقية. تم استخدام البيانات التاريخية من 352 مشروعا من قاعدة البيانات من محافظة ديالى اضافة الى إجراء المقابلات المهيكلة مع المتخصصين في البناء من العاملين في الشركات الحكومية. أظهر تحليل البيانات أن لعملية تقديم العطاءات الحالية تأثيرات كبيرة على أداء المشاريع. بالإضافة إلى ذلك، كشف التحليل أن المعايير الخمسة الأكثر أهمية لاختيار المقاولين العراقيين المقاولين والتي تلائم ظروف العراق هي: إدارة الأمن والسلامة، الاستقرار المالي، الأداء في الماضي، الخبرة ذات الصلة، والآلات والمعدات. إن النتائج تعزز وعي المديرين بأهمية تقييم المناقصات على أساس الشفافية والعدالة.


Article
THE CONSEQUENCES OF POOR QUALITY ON PROJECT MANAGEMENT SUCCESS OF BUILDING PROJECTS

Authors: Samiaah M. Hassen Al-Tmeemy --- Wadhah amer Hatem
Journal: DIYALA JOURNAL OF ENGINEERING SCIENCES مجلة ديالى للعلوم الهندسية ISSN: 19998716/26166909 Year: 2015 Volume: 8 Issue: 4 Pages: 172-182
Publisher: Diyala University جامعة ديالى

Loading...
Loading...
Abstract

The occurrence of building failure and collapse has become a major issue of concern in construction building projects as the magnitudes of this incident are becoming very alarming. This paper therefore aims to investigate the contractors’ viewpoint on the consequences of poor quality in building projects in terms of non-conformance to requirement, cost overruns, and delays. Quantitative method is adopted to collect data from G6 and G7 building contractors within Kuala Lumpur using questionnaire surveys. The study indicated that the cost overrun is the most frequent consequence of quality failure. The findings of this study provide financial justification for all quality improvement efforts.

أصبحت مسألة فشل وانهيار البناء مصدر اهتمام في مشاريع الابنية حيث ان عدد هذه الحوادث أصبح مقلق جدا. لذا تهدف هذه الدراسة إلى التحقق من وجهة نظر المقاولون حول تبعات فقر الجودة في مشاريع الابنية من حيث عدم المطابقة للمتطلبات، تجاوز التكاليف، والتأخير. تم اعتماد أسلوب كمي لجمع البيانات من مقاولي البناء داخل كوالالمبور باستخدام الاستبانة. وأشارت الدراسة إلى أن زيادة التكلفة هي من أكثر التبعات تكرارا نتيجة فشل جودة. ان نتائج هذه الدراسة توفر تبريرا ماليا لجميع جهود تحسين الجودة.


Article
COMPARING THE COMMUNICATION METHODS IN IRAQI CONSTRUCTION PROJECTS DURING THE IMPLEMENTATION STAGE
مقارنة طرائق الاتصال في مشاريع العراق الانشائية خلال مرحلة التنفيذ

Authors: Wadhah Amer Hatem وضاح عامر حاتم --- Samiaah M. Hassen Al-Tmeemy سميعة مهدي حسن التميمي
Journal: Basrah Journal for Engineering Science مجلة البصرة للعلوم الهندسية ISSN: Print: 18146120; Online: 23118385 Year: 2014 Volume: 14 Issue: 1 Pages: 26-38
Publisher: Basrah University جامعة البصرة

Loading...
Loading...
Abstract

Construction projects are complex projects and their organisations are characterised by a high degree of fragmentation since they are distributed in large areas and clearly they involves of many activities, each one being divided into sub-activities and so on. Hear clear and good communication between projects stakeholders leads to the project being more successful in contrast to when the communication is weak. This paper compares two methods of communication used in Iraqi construction projects during the implementation stage, namely the Face to Face (FTF) approach which is characterised as expensive and disruptive and Computer Mediated Communication (CMC) which represents the modern method in the communication field. The results show that the CMC method is more productive and economic than FTF and takes less time when completing an implementation work; in addition, the people are less affected by emotional factors in the construction project in contrast to FTF.

تعتبر المشاريع الانشائية من المشاريع المعقدة وتتميز تركيباتها بدرجة عالية من التجزء وهذا بسبب انتشارها فيمساحات واسعة اضافة الى ذالك ان كل مشروع يتكون من عدد كبير من الفعاليات وكل فعالية تتجزء الى عدة فعالياتثانوية وهكذا. ان الاتصال الجيد بين شركاء العمل يقود الى ان المشروع يكون اكثر نجاحا مقارنة عندما يكون الاتصالضعيف. هذا البحث يقارن بين نوعين من الاتصالات في المشاريع الانشائية في العراق اثناء مرحلة التنفيذ وتسمى )وجهاالى وجه( وهذه الطريقة تتميز بانها مكلفة وتأخر من عمر المشروع والطريقة الاخرى هي الاتصال عن طريق الشبكةالعنكبوتية والتي تمثل الطريقة الاحدث في حقل الانصالات.ان النتائج بينت افضلية طريقة الاتصال بواسطة الكومبيوتر منحيث الانتاجية والاقتصاد وكذالك ان الفعالية تحتاج الى وقت اقل لانجازها مقارنة بلطريقة التقليدية,بلاضافة الى ذالك انالناس يتاثرون في العوامل العاطفية في هذه الطريقة اقل من طريقة )وجها الى وجه(.


Article
The Impact of Terrorism on Construction Industry in Iraq
تاثير الهجمات الارهابية على الصناعات الانشائية في العراق

Authors: Wadhah Amer Hatem وضاح عامر حاتم --- Samiaah M. Hassen Al-Tmeemy
Journal: Wasit Journal of Engineering Sciences مجلة واسط للعلوم الهندسية ISSN: 23056932 Year: 2015 Volume: 3 Issue: 2 Pages: 69-84
Publisher: Wassit University جامعة واسط

Loading...
Loading...
Abstract

Suicide attacks, bombings, explosions became the part of daily life in Iraq. Consequently, the threat of terrorism put the Iraqi construction sector in the face of unique and unusual challenges that not seen on other countries. These challenges can have extensive impact on construction projects. This paper seeks to examine the impact of the terrorist attacks on construction industry and determine the extent to which the impact of terrorism on construction projects in terms of cost, schedule, and quality. This study adapted quantitative and qualitative approaches to collect data using questionnaire survey and interviews, as well as historical data. The study focused on projects that have been the target of terrorist strikes in Diyala governorate. A variety of statistical procedures were employed in data analysis. The results revealed the extent to which terrorist attacks impact construction projects in terms of cost, time, and quality. The results of this study will enhance the awareness of all construction parties to the impact of the terrorist attacks against construction projects. Eventually, this can develop a risk management assessment and assist contractors to properly protect projects and buildings to minimize injuries and fatalities in the event of terrorism.

أصبحت الهجمات الانتحارية، وتفجير القنابل، والانفجارات جزء من الحياة اليومية في العراق. وتبعا لذلك ان خطر الارهاب وضع قطاع الانشاءات العراقية في مواجهة تحديات فريدة وغير عادية لا توجد في بلدان اخرى. هذه التحديات يمكن ان تؤثر تأثيرا بالغا في مشاريع البناء. تسعى هذه الورقة إلى دراسة تأثير الهجمات الإرهابية على قطاع الانشاءات وتحدد المدى الذي يؤثر فيه الارهاب على المشاريع الانشائية من حيث التكلفة والجدول الزمني، والجودة. هذه الدراسة تبنت الأساليب الكمية والنوعية لجمع البيانات باستخدام الاستبيان والمقابلات، اضافة الى البيانات التاريخية. وركزت الدراسة على المشاريع التي كانت هدفا للضربات الإرهابية في محافظة ديالى. تم توظيف مجموعة متنوعة من الإجراءات الإحصائية في تحليل البيانات. أظهرت النتائج مدى تأثير الهجمات الإرهابية مشاريع البناء من حيث التكلفة والوقت والجودة. ومن المتوقع ان نتائج هذه الدراسة ستعزز الوعي لكل اطراف المشروع تجاه تأثير الهجمات الإرهابية لمشاريع البناء. وبالنتيجة، هذا يمكن يطور تقييم إدارة المخاطر ويساعد المقاولين في حماية المشاريع والمباني بشكل صحيح للحد من الإصابات والوفيات في حال حدوث الإرهاب.