research centers


Search results: Found 2

Listing 1 - 2 of 2
Sort by

Article
Treatment of Oily Wastewater by Induced Air Flotation
معالجه المياه الملوثه بالنفط بطريقه التطويف

Authors: Thamer .J.Mohammed --- Shahad .S. Mohammed --- Zaidoon khalaf
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2013 Volume: 31 Issue: 18 Part (A) Engineering Pages: 88-99
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

In this study induced air flotation (IAF) through Perspex glass column (ID 10cm and 150 cm heights) has been studied experimentally to treat the oily wastewater of Iraqi North Oil Company. The column operated in a semi-batch mode (batch wastewater, continuous air injection). Different samples of oily wastewater (30,100,800ppm) were used. Air introduced at different superficial gas velocity through porous (pore size 120µm) distributor which located at the bottom of column. Different speed of the stirrer (50 to 250) rpm was used to indicate it effect on the removal efficiency of oil from water.The study showed that the removal efficiency of oil was increased with increasing initial oil concentration, it reached up to 76 %. While it became 89% when using stirrer.The experimental results were translated to a computer program to predicate empirical correlation.

في دراسه عمليه التطويف المستحث من خلال عمود التطويف (القطر الداخلي 10 سم وبارتفاع 150 سم) تمت عمليه معالجه الماء الملوث بالنفط لشركه نفط الشمال العراقيه. العمود يعمل بنظام شبه وجبه (وجبه من الماء الملوث وضخ للهواء مستمر). تم اخذ عينات مختلفه من الماء الملوث بالنفط بتراكيز(30,100,800) جزء بالمليون. الهواء الداخل بسرع مختلفه من خلال الثقوب (حجم الثقب 120 مايكرومتر) حيث ان الموزع يقع في نهايه العمود. سرع مختلفه من الخلاط المستعمل تتراوح من (50الى 150)دوره بالدقيقه لمعرفه مدى تاثير هذه السرع على كفاءه ازاله النفط من الماء. الدراسه بينت ان كفاءه الفصل للنفط تزداد بزياده التركيز الابنتدائي للنفط , وقفزن من 76% الى 89% باستخدام الخلاط. النتائج العمليه ترجمت بواسطه انظمه الحاسوب لاسناد الارتباط التجريبي.


Article
Study And Evaluation The Optimal Performance Of The Mixing Chlorine Tank In Dhi Qar Wastewater Treatment Plant In Iraq
دراسة وتقييم الاداء الامثل لحوض مزج كلور التعقيم لمحطة معالجة مياه الصرف الصحي في محافظة ذي قار في العراق

Author: Ali Hadi GHAWI علي هادي غاوي
Journal: Iraqi Journal of Civil Engineering المجلة العراقية للهندسة المدنية ISSN: 19927428 Year: 2017 Volume: 11 Issue: 2 Pages: 1-14
Publisher: University of Anbar جامعة الانبار

Loading...
Loading...
Abstract

Chlorine contact tank in water and waste water treatment plant suffer from a lack of efficiency disinfected treated water, which discharge to the rivers and they need a large amount of chlorine for the purpose of disinfection as a result of the presence of dead zones in the basins of chlorine as well as the need to contact a long more than exact standard specifications for the tanks disinfection time. This study deal with optimal performance basin mixing chlorine, which is located at the beginning of Chlorine contact tank of waste water treatment plant in the city of Nasiriyah in Dhi Qar, which is located south of the province of Iraq. In this paper, the use of computational fluid dynamic model in the numerical analysis for the purpose of finding the optimum performance of the chlorine mixing tank with the help of the program FLUENT 6.3.26 and program GAMBIT 2.3.16. Also in this study was used User Defined Function for the purpose of improvements of mixing chlorine. Where the results of the study showed that the ideal rotational speed of the mixer is 140 rpm as well as the results showed Numerical Model that can reduce chlorine dose to 5 mgliter, which is the optimum concentration of chlorine to be supplied for wastewater disinfect and is identical to the Iraqi specifications water sanitation, which discharge to the Euphrates River. In this study the best contact time of chlorine which give the best performance for mixing was 20 seconds.

تعاني احواض التعقيم في محطات الصرف الصحي من قلة الكفاءة بتعقيم المياه المعالجة التي تطرح للأنهار وبالتالي فهي تحتاج الى كمية كبيرة من الكلور لغرض التعقيم وذلك نتيجة لوجود مناطق لا يصلها الكلور (Dead Spaces) في احواض الكلور (Contact Tank ) وكذلك تحتاج الى زمن تماس طويل اكثر من المحدد بالمواصفات الخاصة بأحواض التعقيم. تناول هذا البحث دراسة الاداء الامثل لحوض مزج الكلور الذي يقع في بداية حوض تعقيم مياه الصرف الصحي لمحطة معالجة مياه الصرف الصحي في مدينة الناصرية في محافظة ذي قار التي تقع جنوب العراق. تم في هذا البحث استخدام نموذج ديناميكيا السوائل الحسابية CFD (Computational Fluid Dynamics) في اجراء تحليل رقمي ثنائي الأبعاد لغرض ايجاد الاداء الامثل لحوض مزج الكلور بالاستعانة ببرنامج FLUENT 6.3.26 و برنامج GAMBIT 2.3.16 وتم استخدام تعريف الدالة UDF (User Defined Function) لغرض اجراء التحسينات في الموديل الرياضي بما يناسب حوض مزج الكلور موضوع البحث. بينت نتائج الدراسة ان سرعة الدوران المثالية لجهاز المزج هي 140 دورة الدقيقة وانه يمكن تقليل تركيز الكلور المستخدم لتعقيم مياه الصرف الصحي الى 5 ملغراملتر, وهو التركيز الامثل للكلور الواجب توفيره للحصول على مياه صرف صحي معقمة ومطابق للمواصفات العراقية لمياه الصرف الصحي التي تطرح لمياه نهر الفرات. وكذلك تم في هذه الدراسة ايجاد افضل زمن تماس للكلور والذي يحقق وافضل اداء وقيمته 20 ثانية.

Listing 1 - 2 of 2
Sort by
Narrow your search

Resource type

article (2)


Language

Arabic and English (1)

English (1)


Year
From To Submit

2017 (1)

2013 (1)