Production Planning by use Goal Programming with practical application.
تخطيط الانتاج بأستخدام برمجة الاهداف مع تطبيق عملي

Author: Kareem. K.M كريم قاسم محمد
Journal: Diyala Journal For Pure Science مجلة ديالى للعلوم الصرفة ISSN: 83732222 25189255 Year: 2013 Volume: 9 Issue: 4 Pages: 39-57
Publisher: Diyala University جامعة ديالى

Loading...
Loading...
Abstract

The main target of this paper is use a goal programming approach in production planning. In order to design an efficient production planningsystem, the mathmatical model include multi conflicting objective , every objective funiction have ( positive and negative) deviational variables ,and explain methods can be used to solve the model and using ( Prioritized or Ranked goals or weigted goals ) method to classify priority of goals , The practical application was in electric production company ( factory) , after determin the main goals(4 goals) of the production plan and data ( times, profits) the model formulation and solving by (WINQSP) S.W ,the results explain cooperation among multiple objective funiction.

ان الهدف الرئيسي من هذا البحث هو استخدام البرمجة الهدفية في بناء انموذج رياضي لتخطيط الانتاج حيث يوجد اكثر من هدف يمكن ايجاد حالة توافق بينها في حل الانموذج الرياضي للمشكلة بدلا من الهدف الواحد كما في البرمجة الخطية احادية الهدف ,وتوضيح ماهي اساليب حل الانموذج متعدد الاهداف حيث تم توضيح الاهداف الاساسية والانحرافات (الموجبة والسالبة) لتلك الاهداف وطريقة المفاضلة بين الاهداف باستخدام اماطريقة الاوزان المرجحة اوطريقة الاولوية , وتم من خلال الجانب العملي اختيار معمل انتاج المحولات ومن خلال جمع البيانات اللازمة تم صياغة انموذج رياضي يحقق اربعة اهداف بشكل متوافق باعتماد مبدأ الاولوية وتم حل الانموذج باستخدام برنامج التحليل الكمي وتبين النتائج امكانية الحصول على توافق بين كل الاهداف .


Article
Material Requirements Planning (MRP) for Electric Geyser Product by Using Goal Programming applicative research in the general company of electrical industrialization
تخطيط الاحتياجات من المواد (MRP) لمنتج السخان الكهربائي باستعمال برمجة الاهداف بحث تطبيقي في الشركة العامة للصناعات الكهربائية

Authors: وقاص سعد خلف --- نادية لطفي عبد الوهاب --- / منال داود سلمان
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2014 Volume: 20 Issue: 80 Pages: 281-321
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Material Requirements Planning System (MRP) is considered as one of the planning and controlling of production and inventory systems which is used to prepare plan of the final production requirements and its parts of subcomponents raw materials and the time at which it was needed for the purpose of preparing orders of production and purchase.The problem of the present work is represented in the general company of electrical industrialization adoption of traditional methods and personal experience of the process of the products andor purchase quantity and inventory quantities and limiting the required time for acquiring the required quantities of the materials and parts used in the finish product of the company, in addition to the multi goals of the company which is wanted to do according to its importance at the same time, enjoined the use of the method of goal programming to build a multi goals mathematical model for material requirements planning for the electrical geyser as a research sample general company of electrical industrialization in Al_Waziriya, the period of planning was limited by three months for the year of 2012 (July, August and September), And used in the model solution and get the results the program ready (LINGO-Ver.13).The mathematical model acquired its special importance from its applicability in any company and productive factory after making simple adjustments on it. The present work reaches some conclusions, the most important ones was that the goal programming is considered of the efficient best methods in management since in dealing with multi andor conflicting goals. According to research results, many recommendation was put, the most important recommendation was the expansion in implementation of mathematical methods while planning to make a decision instead of traditional methods for its goals scientific potentials offers in controlling on circumstances and decision limitations and to achieve the best results with a available resources.

يعد نظام تخطيط الاحتياجات من المواد(MRP) من أنظمة التخطيط والسيطرة على الانتاج والمخزون الذي يستعمل لإعداد خطة الاحتياجات للمنتجات النهائية واجزائها من المكونات الفرعية والمواد الاولية وأوقات الحاجة لها بهدف إعداد اوامر الانتاج أو الشراء. تتمثل مشكلة البحث في اعتماد الشركة العامة للصناعات الكهربائية على الطرائق التقليدية والخبرة الشخصية لعملية تحديد الكميات المنتجة و/او المشتراة والكميات المخزونة وتحديد الاوقات اللازمة للحصول على الكميات المطلوبة من المواد والاجزاء الداخلة في المنتج النهائي للشركة، فضلا عن تعدد الاهداف للشركة والتي تسعى الى تحقيقها وفق اهميتها في آن واحد أوجَبَ استعمال اسلوب برمجة الاهداف لبناء إنموذج رياضي متعدد الاهداف لتخطيط الاحتياجات من المواد لمنتج السخان الكهربائي كعينة للبحث في الشركة العامة للصناعات الكهربائية في الوزيرية، وقد حُددت فترة التخطيط للمنتج بثلاثة اشهر لسنة 2012 وهي (تموز، آب، ايلول)، واستُعمِل في حل الإنموذج والحصول على النتائج البرنامج الجاهز (LINGO-Ver.13). يكتسب الإنموذج اهميته من خلال امكانية تطبيقه في اي شركة او مصنع انتاجي بعد اجراء تعديلات بسيطة عليه، وتوصل البحث الى استنتاجات اهمها اعتبار برمجة الاهداف من أفضل الطرائق الكفء في علم الإدارة للتعامل مع الأهداف المتعددة و/أو المتعارضة، واستنادا الى استنتاجات البحث فقد وضعت توصيات اهمها التوسع في تطبيق الطرائق الرياضية عند التخطيط لاتخاذ القرار، بدلا من الأساليب التقليدية لما توفره من إمكانات علمية جيدة في السيطرة على ظروف وقيود القرار وبما يحقق أفضل النتائج في ظل الموارد المتاحة.


Article
Designing and Application of Mathematical Model A Multi – Objectives for Assessment The Quality Of The Project : A Case Study at Saad Public Construction Company
تصميم وتطبيق أنموذج رياضي متعدد الأهداف لتقييم جودة المشروع دراسة حالة في شركة سعد العامــة للإنشاءات

Authors: نداء صالح مهدي الشاهين --- نرمين فائق حسن
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2018 Volume: 24 Issue: 103 Pages: 477-501
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

AbstractThis research aims to design a multi-objective mathematical model to assess the project quality based on three criteria: time, cost and performance. This model has been applied in one of the major projects formations of the Saad Public Company which enables to completion the project on time at an additional cost that would be within the estimated budget with a satisfactory level of the performance which match with consumer requirements. The problem of research is to ensure that the project is completed with the required quality Is subject to constraints, such as time, cost and performance, so this requires prioritizing multiple goals. The project of rehabilitating the sand filters unit was chosen as one of the projects of Saad General Company in Salah ad Din governorate to be the sample of the research, the case study method to reach the targets of the search, and used critical path method (cpm) and Microsoft project program because there are non-traditional relationships between the activities, as used Analytical Hierarchical Process (AHP) to estimate parameters of performance criteria, and finally, using the goal programming to assist the project management to achieve their multiple objectives simultaneously. The results of the research obtained from solving the mathematical model showed the importance of this method as well as its efficiency in achieving five goals that can be achieved simultaneously according to their priorities. These objectives include: completion of the project in the minimum time, extra cost become within the budget, and satisfactory performance level of 100% By minimizing design errors or errors that occur in the implementation site through continuous on-site supervision by the project manager, as well as listening and communicating with the customer, this helps improve the quality of the project.

المستخلص يهدف هذه البحث الى بناء أنموذج رياضي متعدد الاهداف لتقييم جودة المشروع على أساس ثلاثة معايير اساسية وهي : الوقت والكلفة والاداء, ومن ثم تطبيقه في أحد مشاريع شركة سعد العامة لغرض انجاز المشروع بوقته المحدد وبكلفة اضافية تكون ضمن الميزانية الموضوعة وبمستوى اداء مرضي يحقق متطلبات الزبون. تكمن مشكلة البحث في ان ضمان أنجاز المشروع بالجودة المطلوبة يخضع الى قيود، مثل الوقت والكلفة والاداء, لذا فإن هذا الامر يتطلب وضع أولويات لاهداف متعددة. جرى أختيار مشروع تأهيل وحدة المرشحات الرملية احد مشروعات شركة سعد العامة في محافظة صلاح الدين ليكون عينة البحث أعتمد منهج دراسة الحالة للوصول الى أهدافه, استعمل اسلوب المسار الحرج CPM)) وهو أحد اساليب جدولة المشروع وادارته لتحديد الأنشطة الحرجة وبرنامج (Microsoft Project) لوجود علاقات غير تقليدية بين الأنشطة ولحساب وقت المشروع وكلفته في ظروفه الطبيعية والمضغوطة, وأستعمل أسلوب التحليل الهرمي (AHP) لتقدير معلمات معايير الاداء, وبما ان لادارة المشروع أهداف متعددة تسعى الى تحقيقها في وقت واحد, فقد أستعملت برمجة الهدف من خلال برنامج WIN Q.S.B) ) . بينت نتائج البحث المستحصلة من حل الأنموذج الرياضي باستعمال البرنامج الجاهز (WIN Q.S.B V2) الى أهمية هذا الاسلوب فضلاً عن كفاءته في تحقيق خمسة أهداف يمكن تحقيقها في آن واحد وفقا لأولوياتها متمثلة بأنجاز المشروع في وقت اقل وبكلفة اضافية ضمن الميزانية وبمستوى اداء مرضي عن طريق تقليل أخطاء التصميم او الاخطاء التي تحصل في موقع التنفيذ من خلال الأشراف الموقعي المستمر من قبل مدير المشروع, فضلا عن الاستماع والتواصل مع الزبون, وهذا ما يسهم في تحسين جودة المشروع .


Article
Application of the Goal programming to measure and improve the productive performance of petroleum products in the refinery of Dora
تطبيق اسلوب برمجة الاهداف لقياس وترشيد الاداء الانتاجي للمنتجات النفطية في مصفى الدورة

Loading...
Loading...
Abstract

This study deals with the use of the method of programming goals, which is one of the most important techniques used in the research process to make the decision by modeling the reality in the form of a mathematical model is a reflection of the institution sample research in terms of resources and energies in order to achieve multiple goals at the same time. These objectives are called in the mathematical model of positive and negative deviation variables, which we seek through the objective function to reduce the total deviations of those variables to the extent that achieves the balance of the target constraints and priorities set by the administration in the implementation. So a multi-objective mathematical model was constructed, Aims to achieve the liquidator's objectives of increasing production capacities and improving the quality of products as well as reducing the emissions of toxic gases due to combustion operations inside the refinery.

تناول هذا البحث استخدام اسلوب برمجة الاهداف والتي تعد من اهم التقنيات المستخدمة في بحوث العمليات لاتخاذ القرار من خلال نمذجة الواقع العملي على شكل انموذج رياضي يعد انعكاساً للمؤسسة عينة البحث من حيث مواردها وطاقاتها بهدف تحقيق اهدافها المتعددة في آن واحد. ويطلق على هذه الاهداف في الانموذج الرياضي بمتغيرات الانحراف الموجبة والسالبة والتي نسعى من خلال دالة الهدف تقليل مجموع انحرافات تلك المتغيرات الى الحد الذي يحقق توازن القيود الهدفية وحسب اولويات تحددها الادارة في التنفيذ ، لذا تم بناء انموذج رياضي متعدد الاهداف يمثل انتاج المشتقات النفطية في مصفى الدورة يهدف الى تحقيق اهداف المصفى المتمثلة في زيادة الطاقات الانتاجية وتحسين جودة المنتجات وكذلك تقليل انبعاثات الغازات السامة جراء عمليات الاحتراق داخل المصفى.


Article
Fuzzy aggregate production planning by using fuzzy Goal programming with practical application Abstract:
تخطيط الإنتاج الإجمالي الضبابي باستعمال البرمجة الهدفية الضبابية مع تطبيق عملي

Authors: عبد الجبار خضر بخيت --- رشا ضاري كامل
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2017 Volume: 23 Issue: 99 Pages: 355-372
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Abstract:Research summarized in applying the model of fuzzy goal programming for aggregate production planning , in General Company for hydraulic industries / plastic factory to get an optimal production plan trying to cope with the impact that fluctuations in demand and employs all available resources using two strategies where they are available inventories strategy and the strategy of change in the level of the workforce, these strategies costs are usually imprecise/fuzzy. The plant administration trying to minimize total production costs, minimize carrying costs and minimize changes in labour levels. depending on the gained data from the plant of the major products for the second half of 2015 nd after the dissolution of the model using the software (GAMS) was getting the best level from the production , inventory and labour levels , where the total production costs was (7041700000) dinar Which is good compared to the cost reduction Cost set by the factory administration, which was (7668442100)dinars a difference (626742100) , carrying costs was (4327200 ) dinar Which is good compared to the cost reduction Cost set by the factory administration, which was ( 5583400)dinars a difference (1256200) and It found that the factory does not need to hire or lay off workers for the duration of the production plan. And resulting deviational value for the three fuzzy goal ( are (0.938, 1, 1) respectively. Through results we found that deviational value of the goals were close and equal for (1) that consider good , that were obtained were catered level of ambition of the decision-maker values.

المستخلص:يتلخص البحث في تطبيق أنموذج برمجة هدفية ضبابية لتخطيط الانتاج الاجمالي في الشركة العامة للصناعات الهيدروليكية / مصنع البلاستك لاقتراح خطة إنتاج مثلى لمواجهة تقلبات الطلب على منتجاته واستغلال كافة الموارد المتاحة بالاعتماد على إستراتيجية الوفاء بالطلب عن طريق المخزون وإستراتيجية تغير القوى العاملة إذ أن كل من هذه الاستراتيجيات تنطوي على تكاليف تكون هذه التكاليف غامضة وغير دقيقة. تسعى اداره المصنع إلى تقليل تكاليف الانتاج الإجمالية وتقليل تكاليف الخزين وتقليل التغير في مستوى القوى العاملة الحالية. وبالاعتماد على البيانات التي تم الحصول عليها من المصنع للمنتجات الرئيسة للنصف الثاني للعام ( 2015) وبعد حل الأنموذج باستخدام برنامج (GAMS) تم الحصول على أفضل مستوى من الانتاج والخزين والعمالة وبلغت كلفة الانتاج الإجمالية ) 7041700000 ( دينار وهي تكلفة جيده مقارنة بالحد الأعلى للكلفة التي حددتها إدارة المصنع التي كانت ) 7668442100 ( دينار اي بفارق (626742100) دينار وكلفة الخزين 4327200) ( دينار وهي تكلفة جيده مقارنة بالحد الأعلى للكلفة التي حددتها إدارة المصنع التي كانت ) 5583400 ( دينار بفارق ) 1256200 ( دينار ووجد أن المصنع ليس بحاجة إلى تأجير أو الاستغناء عن العمال طيلة مدة الخطة الإنتاجية وان درجة الانتماء للأهداف الثلاثة ( كانت تساوي( 0.938, 1, 1) على التوالي إذ نجد أن درجات انتماء الأهداف كانت قريبة ومساوية للواحد وهذا يعُد أمر جيد اي ان قيم الاهداف التي تم الحصول عليها كانت تلبي مستوى طموح صانع القرار.

Listing 1 - 5 of 5
Sort by
Narrow your search

Resource type

article (5)


Language

Arabic and English (3)

Arabic (1)


Year
From To Submit

2019 (1)

2018 (1)

2017 (1)

2014 (1)

2013 (1)