research centers


Search results: Found 6

Listing 1 - 6 of 6
Sort by

Article
Designing and Application of Mathematical Model A Multi – Objectives for Assessment The Quality Of The Project : A Case Study at Saad Public Construction Company
تصميم وتطبيق أنموذج رياضي متعدد الأهداف لتقييم جودة المشروع دراسة حالة في شركة سعد العامــة للإنشاءات

Authors: نداء صالح مهدي الشاهين --- نرمين فائق حسن
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2018 Volume: 24 Issue: 103 Pages: 477-501
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

AbstractThis research aims to design a multi-objective mathematical model to assess the project quality based on three criteria: time, cost and performance. This model has been applied in one of the major projects formations of the Saad Public Company which enables to completion the project on time at an additional cost that would be within the estimated budget with a satisfactory level of the performance which match with consumer requirements. The problem of research is to ensure that the project is completed with the required quality Is subject to constraints, such as time, cost and performance, so this requires prioritizing multiple goals. The project of rehabilitating the sand filters unit was chosen as one of the projects of Saad General Company in Salah ad Din governorate to be the sample of the research, the case study method to reach the targets of the search, and used critical path method (cpm) and Microsoft project program because there are non-traditional relationships between the activities, as used Analytical Hierarchical Process (AHP) to estimate parameters of performance criteria, and finally, using the goal programming to assist the project management to achieve their multiple objectives simultaneously. The results of the research obtained from solving the mathematical model showed the importance of this method as well as its efficiency in achieving five goals that can be achieved simultaneously according to their priorities. These objectives include: completion of the project in the minimum time, extra cost become within the budget, and satisfactory performance level of 100% By minimizing design errors or errors that occur in the implementation site through continuous on-site supervision by the project manager, as well as listening and communicating with the customer, this helps improve the quality of the project.

المستخلص يهدف هذه البحث الى بناء أنموذج رياضي متعدد الاهداف لتقييم جودة المشروع على أساس ثلاثة معايير اساسية وهي : الوقت والكلفة والاداء, ومن ثم تطبيقه في أحد مشاريع شركة سعد العامة لغرض انجاز المشروع بوقته المحدد وبكلفة اضافية تكون ضمن الميزانية الموضوعة وبمستوى اداء مرضي يحقق متطلبات الزبون. تكمن مشكلة البحث في ان ضمان أنجاز المشروع بالجودة المطلوبة يخضع الى قيود، مثل الوقت والكلفة والاداء, لذا فإن هذا الامر يتطلب وضع أولويات لاهداف متعددة. جرى أختيار مشروع تأهيل وحدة المرشحات الرملية احد مشروعات شركة سعد العامة في محافظة صلاح الدين ليكون عينة البحث أعتمد منهج دراسة الحالة للوصول الى أهدافه, استعمل اسلوب المسار الحرج CPM)) وهو أحد اساليب جدولة المشروع وادارته لتحديد الأنشطة الحرجة وبرنامج (Microsoft Project) لوجود علاقات غير تقليدية بين الأنشطة ولحساب وقت المشروع وكلفته في ظروفه الطبيعية والمضغوطة, وأستعمل أسلوب التحليل الهرمي (AHP) لتقدير معلمات معايير الاداء, وبما ان لادارة المشروع أهداف متعددة تسعى الى تحقيقها في وقت واحد, فقد أستعملت برمجة الهدف من خلال برنامج WIN Q.S.B) ) . بينت نتائج البحث المستحصلة من حل الأنموذج الرياضي باستعمال البرنامج الجاهز (WIN Q.S.B V2) الى أهمية هذا الاسلوب فضلاً عن كفاءته في تحقيق خمسة أهداف يمكن تحقيقها في آن واحد وفقا لأولوياتها متمثلة بأنجاز المشروع في وقت اقل وبكلفة اضافية ضمن الميزانية وبمستوى اداء مرضي عن طريق تقليل أخطاء التصميم او الاخطاء التي تحصل في موقع التنفيذ من خلال الأشراف الموقعي المستمر من قبل مدير المشروع, فضلا عن الاستماع والتواصل مع الزبون, وهذا ما يسهم في تحسين جودة المشروع .


Article
Use multi-goal fuzzy programming to find the critical path
استخدام البرمجة المتعددة الأهداف الضبابية لإيجاد المسار الحرج

Authors: faten farooq albadree فاتن فاروق البدري --- yousif adel ali يوسف عادل علي البلداوي
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2019 Volume: 25 Issue: 112 Pages: 428-443
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The exploitation of all available resources and benefiting from them is one of the most important problems facing the decision makers at the present time. In order to exploit these resources, it is necessary to organize the conflicting objectives, which is the main work in the project management, which enables the development of a plan that decision makers can use to shorten the total completion time and reduce the total cost of the project. Through the use of modern scientific techniques, and therefore the researcher using the critical path method using the technology of programming goals to find more efficient ways to make appropriate decisions where the researcher worked to solve the problems in the construction of the Department of sewage streams The results were within the level of ambition for the decision maker where the conflict between the objectives was resolved from reducing the total cost to the total time and the cost of evasion through Use linear programming objectives and the results were within the level of ambition of the decision-maker.

المستخلصاستغلال جميع الإمكانيات المتاحة والاستفادة منها هي من اهم مشاكل التي تواجه متخذي القرار في الوقت الحالي ولاستغلال تلك الموارد لابد من تنظيم الأهداف المتضاربة وهو العمل الرئيسي في إدارة المشروع والتي تمكن من وضع خطة يمكن لصانعي القرار استخدامها لتقصير وقت الاكمال الإجمالي وتقليل إجمالي التكلفة للمشروع ويتم ذلك من خلال استخدام تقنيات العلمية الحديثة , ولذلك قام الباحث باستخدام اسلوب المسار الحرج مستعينا بتقنية برمجة الأهداف لإيجاد طرق اكثر كفاءة لاتخاذ القرارات المناسبة حيث عمل الباحث على حل المشاكل الموجودة في بناء دائرة مركز مجاري قضاء بلد وهي المشاريع التابعة الى وزارة البلديات والاشغال وبعد جمع البيانات اللازمة للمشروع قام الباحث بتقليل الكلفة الكلية والوقت الطبيعي والكلفة التعجيلية , وقد كانت النتائج ضمن مستوى الطموح بالنسبة لمتخذ القرار حيث تم حل التضارب بين الأهداف من تقليل الكلفة الكلية الى الوقت الكلي و الكلفة التعجيلية من خلال استخدام برمجة الأهداف الخطية وكانت النتائج ضمن مستوى الطموح لمتخذ القرار.


Article
Scheduling projects using dynamic programming style and smart algorithm
جدولة المشاريع باستعمال اسلوب البرمجة الديناميكية والخوارزمية الذكية

Authors: marwan .a. مروان عبد الحميد عاشور --- aleeaa a.h علياء عبد الامير احمد
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2019 Volume: 25 Issue: 114 Pages: 458-474
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed And not exceed them and often the most important of these goals is to reduce the time of implementation of the project to the minimum possible and then compare the plan and the reality and avoid the differences that occurred early, depending on the commitment to the scheduled schedule and the extent of implementation of each activity in time and cost without delay The main objective is to extract the critical path and divide the project into multiple stages using dynamic programming method, which helps to know when the project will be completed and to know the critical path in which the delay of any activity affects the duration of completion of the project The results are compared with the results of the artificial intelligence method and using the hybrid algorithm where the results are the same in both methods and the completion time of the project is (675) working days.

يهدف البحث الى المقارنة بين الطرائق التقليدية والحديثة للحصول على الحل الامثل باستعمال البرمجة الديناميكية والخوارزميات الذكية لحل المشاكل التي تتعرض لها ادارة المشاريع ويبين الطرق الممكنة التي تعالج تلك المشاكل وذلك بالاعتماد على الجدول الزمني الذي يضم سلسلة انشطة مترابطة ومتسلسلة فيما بينها ويوضح العلاقات بين الانشطة لتحديد بداية كل نشاط ونهايته وتحديد مدة وكلفة المشروع الاجمالية وتقدير الاوقات التي استغلها كل نشاط وتحديد الاهداف التي يسعى اليها المشروع من خلال التخطيط والتنفيذ والمراقبة للحفاظ على الميزانية المقررة وعدم التجاوز عليها وغالباً ما تكون اهم تلك الاهداف هي تقليل وقت تنفيذ المشروع الى ادنى حد ممكن ومن ثم المقارنة بين المخطط والواقع العملي وتلافي الفروقات الحاصلة مبكراً حيث يعتمد ذلك على الالتزام بالجدول الزمني المقرر وعلى مدى تنفيذ كل نشاط في وقته وكلفته دون تأخير ويتمركز الهدف الاساس في استخراج المسار الحرج وتقسيم المشروع الى مراحل متعددة باستعمال اسلوب البرمجة الديناميكية والتي تساعد على معرفة وقت اتمام المشروع ومعرفة المسار الحرج الذي يؤدي الى تأخر اي نشاط فيه على مدة انجاز المشروع ومقارنة النتائج بنتائج اسلوب الذكاء الصناعي وباستعمال الخوارزمية المهجنة وتكون النتائج متماثلة في الطريقتين وتكون مدة اتمام المشروع هي (675) يوم عمل .


Article
Planning and scheduling projects of municipal services using geographic information system (GIS) Applied Research in the Hindia city of the province of Karbala
تخطيط وجدولة تنفيذ مشاريع الخدمات البلدية بأستخدام نظام المعلومات الجغرافية(GIS ) بحث تطبيقي في مدينة الهندية ـ محافظة كربلاء المقدسة

Authors: نادية لطفي عبد الوهاب --- نوار رعد عبد المجيد
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2015 Volume: 21 Issue: 81 Pages: 112-130
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The research has handled an important service sector in Iraq which is the municipals sector since it is connected directly and closely with the services presented to the citizens, and because the process of accomplishing the projects needs planning and scheduling for implementing these projects according to the available financial allocating and it was no choice but finding modern methods that help succeeding the processes of planning through making use of Geographic Information system (GIS) in providing the necessary information in scheduling the projects since it is considered as one of the tools that conveys the occurred in collecting the huge amount of the locative data related to the items of the essential design of the towns .The problem of the research was represented by the large shortage in the presentation of the municipal services especially (paving، cladding، and Flooring ) in addition to the retrogression of these services in the total essential design of the town of Hindia with the weakness of the established plans which demonstrates the course of the municipals and its future plans، which we can evaluate the performance of these municipals about the projects that are going to be accomplished during the coming periods with the concentration of providing the services to certain areas while neglecting the other areas. The research aims to prepare schedules and charts to the areas belong to the Hindia Town by using the Satellite pictures and treating and producing them with the possibility of diagnosis the level of services presented in each area that belongs to the town under consideration, which would help in making the right decision related to the execution of the projects in such a way that secures the prevention of interference with projects of other enterprises in the town. The research reached many conclusions such as the absence of general plan that can guide the municipal establishments in the Hindia Town because of the unavailability of the data related to the level of the services presented and the actual need for different areas in the town of these services. One of the recommendations of the research is the necessity of the good future planning for executing the public services projects in the town with the establishment of central an integrated information Bank for the geographical information and the updating it continually to be used by the municipal establishments and the other authorities related to the process of planning to the future projects.

تناول البحث قطاع خدمي مهم في العراق اليوم ألا وهو قطاع البلديات وكان لابد من إيجاد طرائق حديثة تساعد في نجاح عمليات التخطيط للمشاريع من خلال الاستفادة من نظم المعلومات الجغرافية (GIS) في توفير البيانات الضرورية لجدولة المشاريع، كونها تعد أحدى الأدوات التي تواكب التطور الحاصل في جمع الكم الهائل من البيانات المكانية المتعلقة بمفردات التصميم الأساس للمدن . تمثلت مشكلة البحث بوجود نقص كبير في تقديم الخدمات البلدية وخاصة (التبليط، والاكساء، الرصف) فضلاﹰ عن تردي وضع هذه الخدمات وضعف الخطط الموضوعة والتي توضح مسار عمل البلديات بالمستقبل، التي يتم من خلالها تقييم أداء هذه البلديات عن الاعمال التي تنجزها خلال الفترات القادمة مع تركيز تقديم الخدمات لمناطق معينة واهمال مناطق أخرى . يهدف البحث إلى إعداد جداول وخرائط للمناطق التابعة لقضاء الهندية باستخدام الصور الجوية ومعالجتها وإنتاجها مع إمكانية تشخيص مستوى الخدمات في كل منطقة من المناطق التابعة للمدينة مما يساعد في اتخاذ القرار السليم فيما يتعلق بتنفيذ المشاريع بشكل يضمن عدم التداخل مع مشاريع لدوائر أخرى. وتوصل البحث الى استنتاجات عدة منها لا توجد خطة عامة تعمل من خلالها الدائرة البلدية في قضاء الهندية بسبب عدم توافر البيانات عن مستوى الخدمات المقدمة والحاجة الفعلية للمناطق المختلفة في القضاء من هذه الخدمات . أما من التوصيات التي توصل اليها البحث، لابد من التخطيط المستقبلي الجيد لتنفيذ مشاريع الخدمات العامة للمدينة مع إنشاء بنك معلومات مركزي يتعلق بالمعلومات الجغرافية لتستخدم من قبل الدوائر البلدية والجهات المختصة والتركيز على تعزيز عملية تكامل البيانات بين الدوائر البلدية والخدمية الأخرى من خلال بناء قاعدة بيانات موحدة وتحديثها باستمرار .


Article
Project Scheduling By using Goals Programming – An Applied Research In Modern Village Project (Residential Building Aspectin In Wasit Governorate)
جدولة المشروع باستعمال أسلوب برمجة الأهداف – بحث تطبيقي في مشروع القرية العصرية (محور ألابنية السكنية) في محافظة واسط

Authors: وقاص سعد خلف --- تمام سلمان خضر
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2015 Volume: 21 Issue: 85 Pages: 169-201
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

One of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost . the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building project , with acknowledgement that many activities of project net are of unconventional relations among each others (of type finish to start) ; and there are periods of (lead and lag) among each other for that reason , (primavera V6) program is used in project scheduling and management which is one of prime programs to find the time and cost of project accomplishment at normal and crash states ; and as project management has numerous goals , same of them are contradictory which are trying to do in one time and that require great working and decision-makers face difficulty to reach into accurate and suitable decisions (goal programming) method is used which is one of efficient and mathematical method to achieve the objectives the results obtained of the mathematical model solution with the use of (win Q.S.B V2) program show the importance and efficiency of this method in modern village project scheduling (residential building aspect) under numerous contrasted goal that project management determined according to their importance and to be achieved according to their importance and to be achieved in one time .

ان من اهم التحديات التي تواجه ادارة المشروع في الوقت الحاضر هو ضمان انجاز المشروع على الرغم من خضوعه لقيود محدده منها قيود تتعلق بالوقت واخرى تتعلق بالموارد المالية المخصصة للمشروع لذا فان هذا الامر يتطلب حساب دقيق للوقت والكلفة, فمشروع القرية العصرية (محور الابنية السكنية) هو احد المشاريع الضخمه والتي تسعى وزاره الزراعه الى انجازها في محافظة واسط حيث تم اختيار هذا المشروع بوصفه من المشاريع التي فيها العمل متلكأ وعلى هذا الاساس تمت دراسة المشروع من جديد وفق الاساليب العلميه والرياضية الحديثه حيث استعمل احد اساليب جدولة وادارة المشروع وهو أسلوب المسار الحرج (CPM) لايجاد وقت انجاز مشروع الابنيه السكنيه علما ان الكثير من الانشطة في شبكة المشروع لم تكن العلاقات بينها تقليدية (من نوع Finish to Start) كما تضمنت وجود فترات التقديم والتاخير (Lead and Lag) بينها وعليه تم استعمال احد البرامج الرائده في إدارة وجدولة المشروع وهو برنامج PrimaveraV6)) لايجاد وقت وكلفة انجاز المشروع في الظروف الطبيعية والتعجيلية، وبما ان لادارة المشروع اهداف عديدة ومنها متناقضة تسعى الى تحقيقها في ان واحد الامر الذي يتطلب الجهد الكبير وصعوبة الوصول الى القرارات المناسبة والدقيقة من قبل متخذ القرار فكان لابد من استعمال اسلوب رياضي كفوء وهو برمجة الاهداف (Goal Programming) لتحقيق هذه الاهداف حيث بينت النتائج المستحصلة من حل الإنموذج الرياضي باستعمال احد البرامج الجاهزة (WinQ.S.B V2) الى اهمية هذا الاسلوب وكفاءته في جدولة مشروع القرية العصرية (محور الابنية السكنية) في ظل وجود اهداف عديدة ومتناقضة لادارة المشروع حددتها وفق اهميتها وتسعى الى تحقيقها في ان واحد.


Article
PROJECT MANAGEMENT OF BALAD`S MAJOR SEWERAGE SYSTEM BY USING THE GOAL PROGRAMMING METHOD
ادارة مشروع مجاري بلد الكبير باستخدام أسلوب البرمجة بالأهداف

Authors: أمجد عباس عبد الرحيم البلداوي --- وقاص سعد خلف
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2016 Volume: 22 Issue: 93 Pages: 162-194
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve these projects in the determined time , added cost and technical specifications although the majority of these projects have been managed with predetermined time and financial resources limits , they still need some improved strategies and more careful calculation in their time and cost management. This project was chosen for the following reasons , The first reason is that the project is currently stopped, because of the security and financial circumstances in salahulddin province in particular .this is a great manage time and cost when the work is resumed , and the second reason is during the progress of the project, the until it was stopped, the completion percentage was behind what it was planned originally . this highlights the need to study how to avoid these delays in future using a scientific and logical method , and the third reason that the project has many variables that affect the progress, which are of great importance for scientific and mathematical methods . To achieve this purpose the project was studied using modern scientific and mathematical methods , which are the curved part method (CPM) for project's real and accelerated timing the Primavera V6 software and the AutoCAD 2015 software . the goal is to benefit from these methods and software to establish a new work schedule for the project . Due to the project's various and clashed (in sometimes) objectives that are have to be accomplished in a limited time , it is very important to be careful and accurate with making the right time . It was highly needed to use an efficient mathematical model that work with all these variables in the limited time allowed and according to their priorities . This mathematical method is called the Goal Programming for multi-objective mathematical models

يعد مشروع مجاري بلد الكبير احد اكبر المشاريع التي هي قيد الانجاز في محافظة صلاح الدين ضمن خطة تنمية الاقاليم للعام 2013 , فهو مشروع ضخم يسير باتجاهين الاول مد الشبكات و الثاني انشاء محطات الرفع وللمحورين ( الثقيل والمطري ) , والتي تسعى مديرية مجاري صلاح الدين تنفيذه لخدمة اربعة احياء في قضاء بلد . إن من أهم التحديات التي تعيق ادارة المشاريع اليوم هي التأكد من انجاز تلك المشاريع في وقتها المحدد , وكذلك الكلفة و المعاير الفنية المحدد ايضا , وعلى الرغم خضوع اغلب هذه المشاريع لقيود محددة ( محددات ) تتعلق بالوقت واخرى تتعلق بالموارد المالية المخصصة للمشروع لذا فأن موضوع الوقت والكلفة في ادارة اي مشروع يحتاج الى حسابات دقيقة لهما . وقد تم اختيار هذا المشروع للدراسة لعدة اسباب مهمة , السبب الاول : إن المشروع متوقف حاليا بسبب الظروف الامنية والمادية في صلاح الدين على وجه الخصوص , وهذا دافع كبير لدراسة كيفية التعامل مع وقت وكلفة انجازه في حال استأنف العمل به , والسبب ثانيا اثناء تنفيذ المشروع كانت هنالك انحرافات عن نسب الانجاز الفعلي , مما يدفع الى توفير دراسة وبأسلوب علمي ومنطقي لتجاوز هذه الانحرافات في المستقبل , اما السبب الثالث فهو إن المشروع يحتوي على الكثير من الانشطة مما يعطي اهمية كبيرة للأساليب العلمية والرياضية التي سوف تؤثر بشكل كبير في تنفيذ المشروع بأسلوب مدروس . لذا تمت دراسة المشروع من جديد وفقا لأساليب علمية ورياضية حديثة , اختيار اسلوب المسار الحرج (CPM) بوصفه احد اساليب الادارة العلمية للمشاريع لإيجاد وقت انجاز المشروع الطبيعي والتعجيلي , وبما ان لإدارة هذا المشروع اهداف متعددة تسعى الى تحقيقها في مدة زمنية محددة , الامر الذي يتطلب الكثير من الدقة في الوصول للقرارات المناسبة , فكان من الاجدر استخدام اسلوب رياضي كفوء لبناء نموذج رياضي متعدد الاهداف يعمل مع جمــيع هذه المتغـيرات في المدة الزمنية المحددة وبحــسب اولوياتهــا وتسمى البرمجة الهدفية ( (Goal Programming , وكذلك تم استخدام بعض البرامج الجاهزة لرسم الشبكة كبرنامج (Primavera V6 ) والبرنامج الهندسي المعروف (AUTO CAD 2015 ) , وبرنامج (Win QSB) لحل الأنموذج متعدد الاهداف , ومحاولة الافادة من مميزات هذه البرامج في جدولة المشروع .

Listing 1 - 6 of 6
Sort by
Narrow your search

Resource type

article (6)


Language

Arabic and English (6)


Year
From To Submit

2019 (2)

2018 (1)

2016 (1)

2015 (2)