Article
Study on Safety Construction Management Plan
دراسة في خطة ادارة الانشاء والسلامة

Authors: Sawsan Rasheed Mohammad سوسن رشيد محمد --- Ahmed M. Rasheed احمد محمد رشيد
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2014 Volume: 20 Issue: 11 Pages: 1-19
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

After studying the reality of application to occupational safety in new Iraqi building projects and sampling the situation wilt that in developed and neighboring countries, researcher found that there is a big gap in the level of safety application conditions, this indicates the need fora quick and clear reference for local engineers to use it on site for safety conditions in their projects . As a case study the monitors work the researcher studied a huge project in the United Arab Emirates.This project considered for safety requirements to highest grades. This case study may be far away from the projects in Iraq, but we hope to rise the Iraqi work level in the near future. After seeing the way of administration work and how they were rated the severity of each phase of the work, an idea was builtabout the most dangerous situations in projects with multiple floorsbuildings. To find multiple solutions to the risk, researchers identified 46 cases with their ratings, type of perceived risk in each case, and displayed a format survey to the most important specialized institutions and companies operating in Iraq and the United Arab Emirates. Finally theresearcher takes the results,and format a software that any user can use in his personal computer to studythe expected risk,how to avoid it and how to deal with it if it happens.

بعد دراسة واقع حال مستوى تطبيق السلامة المهنية في مشاريع بناء العراق الجديد ومقارنة ذلك الحال بما هو عليه في البلدان المتطورة والبلدان المجاورة وجدالباحث ان هنالك فجوة كبيرة في مستوى تطبيق شروط السلامة ومن ذلك تكونت الفكرة في ايجاد مرجع سريع وواضح يستطيع المهندسون المحليون الاستعانة به موقعيآ لتطبيق شروط السلامة في مشاريعهم , لذلك قام الباحث بدراسة حالة لمشروع ضخم في دولة الامارات العربية المتحدة تم فيه تطبيق شروط السلامة بأعلى الدرجات ونحن نعلم ان الحالة الدراسية قد تكون بعيدة نوعآ ما عن نوع المشاريع المطبقة في العراق ولكننا نأمل ان يرتقي مستوى العمل في العراق الى ذلك الحجم في المستقبل القريب . وبالفعل بعد الاطلاع على طريقة ادارة العمل وكيف تم تصنيف درجة خطورة كل مرحلة من مراحل العمل اصبح لدى الباحث تصور عن اهم الحالات الخطرة في مشاريع البنايات متعددت الطوابق ولكي يكون لدينا حلول متعددة للمخاطر قام الباحث بتحديد 46 حالة مع تصنيفاتها ونوع المخاطر المتوقعة لكل حالة وعرضها بصيغة استبيان شمل اهم المؤسسات المتخصصة والشركات العاملة في العراق ودولة الامارات وخرج الباحث بنتائج تم تبويبها بصيغة برنامج حاسوبي يستطيع اي مستخدم ان يستعمله في حاسوبه الشخصي موقعيآ وبمجرد الضغط على مربع اي حالة نستطيع معرفة الخطر المتوقع وكيفية تجنبه وطريقة التعامل معه ان حدث. مع عمل جزء نظري لشرح طريقة التعامل مع البرنامج الحاسوبي.


Article
Development of an Integrated Construction Management System for Building Estimation

Authors: Sawsan Rasheed Mohammed --- Ehab Fadhil Mohammed Ali
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2012 Volume: 18 Issue: 9 Pages: 999-1013
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and duration of tasks, then exported to MS Project and MS Excel. The system was developed by using Visual Basic and ActiveX automation technology for combining the above software. The system, also, can calculate quantities of materials. The system includes digitizer (on-screen takeoff) calculates the lengths and areas of the drawings to which the form of an image and scanned. The integrated system has been applied to case study, a storages building for hospital 260 beds. The results proved the effectiveness of the system for the conversion of information from the graphical form dwg to numerical formulas xlcx / xlc and mpp can be handled easily pleased and software are covered.

ا تزال إدارة المشاريع تعتمد التبادل اليدوي للمعلومات و بالاستناد على الوثائق الورقية. حيث يتم رسم الخرائط و المخططات التصميمية بمساعدة الحاسوب ,CAD لكن البيانات المطلوب ادخالها لبرامجيات إدارة المشاريع لا يمكن استخراجها مباشرة من CAD بل يجب ادخالها يدويا من قبل المستخدم. ان عملية أخذ و تجميع المعلومات من المخططات التصميمة و ادخالها في برامجيات ادارة المشاريع تحتاج الى جهد و وقت مع احتمال حدوث اخطاء في نقل و ادخال المعلومات. هذا البحث يقدم نظاما حاسوبيا متكاملا لمشاريع المباني حيث يقوم باستخلاص و استيراد الكميات عن طريق ترجمة مخططات AutoCAD مع قاعدة بيانات MS Access بالكلف و الانتاجيات لحساب الاسعار و المدد الزمنية للفعاليات ثم تصديرها الى برامج MS Project و MS Excel. تم تطوير النظام بأستخدام Visual Basic و تقنية أتمتة ActiveX لربط البرامج اعلاه. بالاضافة الى حساب كميات المواد , يتضمن النظام Digitizerلحساب الاطوال و المساحات للمخططات التي تكون بصيغة صورية. تم تطبيق النظام المتكامل على دراسة حالة لبناية مخازن لمستشفى 260 سرير. اثبتت النتائج فعالية النظام في تحويل المعلومات من صيغتها الرسومية dwg الى صيغ عددية xlcx / xlc , mpp يمكن التعامل معها بسهولة و يسر بالبرامجيات المشمولة بها.


Article
FUZZY MODELLING APPROACH FOR COP ASSESSMENT SYSTEM
تطوير نظام التقييم للمشاريع الإنشائية باستخدام تقنية تحليل الغموض

Author: Abbas Mahde Abd عباس مهدي عبد
Journal: DIYALA JOURNAL OF ENGINEERING SCIENCES مجلة ديالى للعلوم الهندسية ISSN: 19998716/26166909 Year: 2010 Volume: Engineering Sc. Conference Issue: First Pages: 195-212
Publisher: Diyala University جامعة ديالى

Loading...
Loading...
Abstract

ABSTRACT:- Manage the uncertainty and vagueness of the construction organizations performance (COP) is the appropriate tool to improve the quality and environmental aspects. Because of the benefits of their interaction, the two systems were integrated to formulate the basis for the Integrated Management System (IMS). Quality performance has been assessed to monitor the construction processes and activities status. The developed Evaluating System has been utilized different assessment criteria, sub-criteria, and their combinations. The concepts of fuzzy set theory have been introduced to represent the uncertainty and vagueness of each system requirements. The study context is limited to construction projects to point out the using of these concepts for analyzing and improving the quality culture in this sector. The findings reflect the relative significance and the probability of fail for each article of the system components, the ability of integration for two or more systems; also some recommendations have been suggested for further development.Keywords:- Environmental system, integration management, Quality system, construction management

الخلاصة أصبحت تقنيات إدارة وتحليل الغموض الأداة المناسبة لإدارة الجوانب البيئية وجودة في المشاريع لمختلف المؤسسات الإنشائية. ونتيجة للفوائد الجمة الناتجة عن تكامل تبني هذه التقنيات مع الإدارة الهندسية، فقد تم في هذا البحث دراسة فرص دمج نظامين مختلفين لصياغة الأساس لنظام الإدارة المتكاملة. حيث جرى تقييم أداء الجودة للفعاليات الإنشائية. ان نظام التقييم الذي طور في هذا البحث اعتمد عدة فرضيات رئيسية وأخرى ثانوية مع دراسة التداخل فيما بينها. وقد استخدمت المفاهيم المنطقية لنظرية الغموض (Fuzzy Theory) لتمثيل وتحليل عدم اليقين والغموض لجميع متطلبات النظام. نطاق هذه الدراسة كان مقتصرا على دراسة المشاريع الإنشائية بهدف تطوير استخدام هذه المفاهيم لتحليل وتحسين ثقافة الجودة في هذا القطاع. بينت النتائج الأهمية النسبية واحتمال الفشل لكل فقرة من مكونات النظام، كما تم تأشير قدرة التكامل لاثنين أو أكثر من النظم الإدارية؛ وبهدف المزيد من التطوير لهذه المفاهيم فقد خلصت الدراسة الى وضع بعض المقترحات والتوصيات.


Article
CONSTRUCTION DELAY ANALYSIS USING DAILY WINDOWS TECHNIQUE

Authors: Salsabeel S. Jafar --- Sawsan Rasheed Mohammed
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2011 Volume: 17 Issue: 1 Pages: 186-199
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Delays occur commonly in construction projects. Assessing the impact of delay is sometimes a contentious issue. Several delay analysis methods are available but no one method can be universally used over another in all situations. The selection of the proper analysis method depends upon a variety of factors including information available, time of analysis, capabilities of the methodology, and time, funds and effort allocated to the analysis. This paper presents computerized schedule analysis programmed that use daily windows analysis method as it recognized one of the most credible methods, and it is one of the few techniques much more likely to be accepted by courts than any other method. A simple case study has been implemented to demonstrate the accuracy and usefulness of the proposed delay analysis model. The results of the study indicate that the outcomes of delay analyses are often not predictable that each method may yield different results. The study also revealed that depending on the time and resources available, and the accessibility of project control documentation, one method may be more practical or cost-effective.

تحدث التاخيرات كثيرا في المشاريع الانشائية. وغالبا ما يكون تقييم تأثير التأخير موضع نزاع. توجد عدة طرق لتحليل التأخير لكن لا توجد طريقة واحدة يمكن ان تفضل على اخرى في كل الحالات. يعتمد اختيار طريقة التحليل الصحيحة على مجموعة من العوامل منها المعلومات المتوفرة و وقت التحليل و قابلية التقنية المستخدمة والوقت و التمويل والجهد المخصص للتحليل. يقدم هذا البحث برنامج حاسوبي لتحليل الجداول والذي يستخدم تقنية النوافذ اليومية باعتبارها احدى اكثر الطرق الموثوقة و واحدة من الطرق القليلة التي تقبل بها المحاكم من اي طريقة اخرى. تم طبيق حالة دراسية بسيطة من اجل توضيح دقة وفائدة برنامج تحليل التاخير المقترح.. تشير نتائج الدراسة الى أن نتائج تحليلات التأخيرفي اغلب الاحيان ليست متوقعة ذلك بان كل طريقة قد تعطي نتائج مختلفة. كَشفتْ الدراسةَ ايضا بأنّه الوقتِ والمصادر المتوفرة وامكانية الوصول الى وثائق مراقبة المشروعِ هي العوامل التي تحدد اي طريقة قَد تَكُون الأكثر عمليةَ أَو الأكثرَ ربحاً.


Article
تحسين جودة تنفيذ المشاريع الانشائية في شركات المقاولات الحكومية
IMPROVING QUALITY OF CONSTRUCTION PROJECTS IN GOVERNMENTAL CONTRACTING COMPANIES - VIEWS OF PROJECT MANAGERS

Author: د . زياد سليمان محمد خالد
Journal: Tikrit Journal of Engineering Sciences مجلة تكريت للعلوم الهندسية ISSN: 1813162X 23127589 Year: 2005 Volume: 12 Issue: 4 Pages: 1-22
Publisher: Tikrit University جامعة تكريت

Loading...
Loading...
Abstract

Quality assurance as a cultural standing point and economic role become more essential in the view of the new activation of the Iraqi Construction Sector. A comprehensive view of local factors must be considered side by side with the international development issues. This paper discusses the results of obtaining construction managers consensus opinion on factors to improve quality in the construction projects of governmental contracting companies. With the aid of Nominal Group Technique a consensus opinion of 100 construction managers in the Ministry of Construction and Housing is obtained on 25 factors sudjested by them to improve quality on their projects together with the relative importance of each factor. A Pareto analysis is carried out to show the weight of contribution of each factor and it was found that basic wages and quality related incentives together with obligations and delegations to construction project managers are the most important factors. The factors that have the same source of problems were also combined and categorized into five areas where it was found that satisfaction and quality knowledge together with instructions and procedures are the most critical areas. These findings are compatible with the new philosophy of total quality management.

في ضوء تجدد نشاط قطاع التشييد العراقي تظهر الحاجة إلى زيادة الاهتمام بالجودة بوصفها موقفاً حضارياً وضرورة اقتصادية في الوقت نفسه. وذلك في اطار نظرة شمولية تأخذ بالاعتبار العوامل المحلية ومعطيات التطور العالمي والمستجدات الاقتصادية التي تسود عالم اليوم. ومن أجل المساهمة في تعجيل عملية النهوض بمستوى الجودة في تنفيذ المشاريع الإنشائية يأتي هذا البحث الذي يهدف إلى التعرف على اهم العوامل المؤثرة في تحسين الجودة في مشاريع شركات المقاولات الحكومية من وجهة نظر مديري المشاريع الإنشائية فيها بوصفهم أصحاب الدور الميداني في عملية التنفيذ الفعلي. تم إجراء البحث باستخدام تقنيات المجموعة الاسمية والاستبيان وتحليل باريتو لآراء مائة مهندس من وزارة الاعمار والإسكان بوصفها احد اهم الجهات الفاعلة في قطاع التشييد العراقي. وذلك للتوصل إلى العوامل التي تحظى بإجماع الرأي مع تحديد أهمية كل منها. فتبين أن الأجور والحوافز المرتبطة بالجودة وصلاحيات مديري المشاريع هي في مقدمة العوامل المؤثرة في تحسين الجودة. ثم جرى تصنيف العوامل إلى خمس فئات حسب جذورها المشتركة وذلك لتحديد المصادر المشتركة للخلل الذي يستوجب المعالجة. فتبين أن القناعة والوعي النوعي وكذلك الإجراءات والتعليمات تأتي في مقدمة هذه المصادر وهذا يتوافق وجوهر الفلسفة الحديثة للإدارة الشاملة للجودة.


Article
THE FACTORS AFFECTING PUBLIC CONSTRUCTION MANAGEMENT IN SAUDI ARABIA:VARIATION ORDERS VIA OFFICE BUILDING AS SAMPLE
العوامل المؤثرة على إدارة مشاريع التشييد الحكومية في المملكة العربية السعودية

Author: Saleh Alatawi صالح خضر العطوي
Journal: Al-Qadisiyah Journal for Engineering Sciences مجلة القادسية للعلوم الهندسية ISSN: 19984456 Year: 2015 Volume: 8 Issue: 1 Pages: 43a-66a
Publisher: Al-Qadisiyah University جامعة القادسية

Loading...
Loading...
Abstract

This research is an exploratory and descriptive study of the variation orders, as one of the most important issues and variables acting in Saudi construction management. The researcher tried to achieve five objectives, Which are: identifying the main active stakeholders in the variation orders, to determine to what extend they affect the variation orders, how the variation orders are priced, monitoring and identifying the most important activities that cause the variation orders, and to identify the most important aspects on how the variation orders affect the management of construction projects.To achieve the objectives above, the researcher conducted a field study, which relied on a sample survey approach to obtain the required data. The researcher applied the field study using 256 samples from the field of governmental construction management.The research found a number of results, of which:• The owner of the project was in the first place as the stakeholder that starts the variation orders.• Original contract item pricing is the most common way to calculate the value of the variation orders.• To refrain from execution, while awaiting the written permitting comes in the first place, as a method of practice in the execution of variation orders.• That the project's owner is the most effective stakeholder that makes the variation order executable.• Architectural works are most common cases in which the variation orders are repeated in a manner that is greater than all the other cases

هذا البحث دراسة استكشافية، وصفية لأوامر التغيير، باعتبارها أحد أهم العوامل والمتغيرات الفاعلة في إدارة مشاريع التشييد، وقد سعى الباحث لتحقيق عدد من الأهداف، وهي: التعرف على الأطراف الفاعلة في أوامر التغيير، وتحديد درجة مساهمة الأطراف الفاعلة في أوامر التغيير، والتعرف على كيفية احتساب قيمة أوامر التغيير، ورصد وتحديد أهم الأعمال التي تحدث بها أوامر التغيير، والتعرف على أهم الجوانب التي تؤثر من خلالها أوامر التغيير على إدارة مشروعات التشييد. ولتحقيق الأهداف السابقة قام الباحث بإجراء دراسة ميدانية، اعتمد فيها على منهج المسح بالعينة، كما اعتمد على أداة الاستبانة؛ للحصول على البيانات المطلوبة، وطبق دراسته الميدانية على عينة غرضية قوامها 256 مفردة من العاملين في حقل تشييد المباني الحكومية.وقد خلصت الدراسة لعدد من النتائج، من أهمها:- جاء مالك المشروع في الترتيب الأول بوصفه الطرف الذي يبدأ من عنده أمر التغيير.- أن الاحتساب عن طريق سعر البند حسب العقد الأصلي، يعد الطريقة الأكثر شيوعا في احتساب قيمة أمر التغيير.- أن الامتناع عن التنفيذ، لحين التعميد الخطي يأتي في الترتيب الأول، كأسلوب متبع لتنفيذ أوامر التغيير.- أن المالك هو الطرف الأكثر فاعلية في جعل أمر التغيير قابلا للتنفيذ.- أن الأعمال المعمارية هي المجال الذي تتكرر فيه أوامر التغيير بدرجة تفوق كافة العناصر الأخرى.

Listing 1 - 6 of 6
Sort by
Narrow your search

Resource type

article (6)


Language

English (3)

Arabic (2)

Arabic and English (1)


Year
From To Submit

2015 (1)

2014 (1)

2012 (1)

2011 (1)

2010 (1)

More...