Modeling Cost Overrun of Public Schools Projects
نمذجة الزيادة بتكاليف أنشاء مشاريع المدارس الحكومية

Author: Gafel Kareem Aswed
Journal: journal of kerbala university مجلة جامعة كربلاء ISSN: 18130410 Year: 2016 Volume: 14 Issue: 3 Pages: 102-111
Publisher: Kerbala University جامعة كربلاء

Loading...
Loading...
Abstract

Poor cost performance in construction project is a common problem worldwide resulting in significant amount of cost overrun at account closure. This study aims at to develop model relationship between the amount of the cost overrun (CSTOVR) in schools construction projects and accepted bid price (LCO), estimated cost (ECO), contractor rank (GRA), experience of the supervisor engineer (ENXP), location of project (LOCA), year of contracting (YEAR), and contractual project duration (CDR) as input parameters before work starts. The study covers two story (12 classes) school projects awarded by the lowest bid system completed during (2007-2012) in Karbala province-Iraq. Probability distribution is established for each identified parameter and subsequently a simulation is developed to produces artificial data. The simulated parameters are used to develop the regression models to predict the cost overrun. It is found that the two developed regression models have the ability to predict the cost overrun (CSTOVR) for school projects, as an output, with good accuracy having correlation coefficient (R) of (85.9%) and (85.2%), determination coefficient (R2) of (73.8%) and (72.6%) respectively.

ضعف السيطرة على الكلفة في المشاريع الإنشائية اصبحت ظاهرة شائعة في اغلب دول العالم نتج عنها زيادات واضحة في الكلفة النهائية عند تصفية الحساب. تهدف هذه الدراسة الى نمذجة العلاقة بين الزيادة المتوقعة في كلف انشاء مباني المدارس الثانوية العامة العراقية وبين المدخلات المعلومة قبل بدء التنفيذ التي هي مدة المقاولة, الكلفة التخمينية, خبرة المهندس المشرف, تصنيف المقاول ,كلفة الإحالة , موقع المشروع, وسنة التعاقد . شملت الدراسة مشاريع المدارس الثانوية ذات (12) صف من طابقين والمحالة بنظام أوطأ العطاءات والمنفذة للفترة بين2012-2007 في محافظة كربلاء. تم تحديد التوزيع الاحتمالي لكل عامل من العوامل التي تم تعريفها كمدخلات ومخرجات في النموذج الرياضي لتحليل الانحدار ومن ثم توليد بيانات صناعية (محاكاة) من هذا التوزيع الاحتمالي لاستخدامها في بناء النموذج (الموديل) الرياضي للتنبؤ بزيادة الكلفة. تم التوصل الى ان نموذجا الانحدار اللذان تم بنائهما في هذه الدراسة يمكن استخدام أي منهما للتنبوء بزيادة الكلفة في مشاريع المدارس المماثلة للعينه المستخدمة في هذه الدراسة وبدقة جيدة ومعامل ارتباط (%85.9) و (85.2%) ومعامل تحديد (73.8%) و(72.6%) على التوالي.


Article
The Most Influential Factor on the Stumble and Failure of the governmental Projects
العوامل الاكثر تاثيرا على تعثر وفشل المشاريع الحكومية

Authors: Hatem Khaleefah Al-Ageeli حاتم خليفة العجيلي --- Abdul Salam J. Ali Alzobaee عبد السلام جميل علي الزوبعي
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2016 Volume: 22 Issue: 2 Pages: 93-110
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The governmental projects are considers the prevailing in Iraq, as most of the projects implemented by the Government, the major role played by governmental projects in the provision of services to citizens and improve the economic situation in the country in general, in addition to the huge number of these projects implemented by the governmental organizations and the large failure rates of it , and because of the fact that these projects are stumbled before they reach the stage of failure, The aim of this research to identify the main factors for the stumble projects in addition to identifying the most influential factor on the causes and consequences of it , like (cost overruns , time overruns , delay and scope creep ) , the most influential factors have been identified through the questionnaire of thirty three (director manager, project manager and engineer) in the governmental organizations who has extensive experience in project implementation . The factors (political situation, the security and the deteriorating economic, financial efficiency is good for the employer, the contractor and low-budget experience, poor design and lack of efficient manpower and resources) of the most important factors that lead to stumble projects.

تعتبر المشاريع الحكومية هي السائدة في العراق ، حيث ان اغلب المشاريع تنفذها الحكومة تقريبا ، و للدور الكبير الذي تلعبه المشاريع الحكومية في تقديم الخدمات للمواطنين و تحسين الوضع الاقتصادي في البلد بشكل عام ، اضافة الى العدد الهائل من هذه المشاريع و التي تنفذها مختلف المنظمات الحكومية و نسب الفشل الكبيرة فيها و بسبب كون هذه المشاريع تكون متعثرة قبل ان تصل الى مرحلة الفشل ,كان الهدف من هذا البحث تحديد العوامل الرئيسية لتعثر المشاريع اضافة الى تحديد العوامل الاكثر تاثيرا على اسبابه و نتائجه , مثل ( زيادة الكلفة , زيادة الزمن , التاخير و زحف نطاق المشروع ), العوامل الاكثر تاثيرا قدد حددت عن طريق الاستبيان لثلاثة و ثلاثين ( مدير قسم ، مدير مشروع و مهندس ) في المنظمات الحكومية ممن لديه خبرة واسعة في تنفيذ المشاريع و استخدمت طريقة دلفي في هذا الاستبيان كانت عوامل ( الوضع السياسي ، الامني و الاقتصادي المتدهور ، الكفاءة المالية غير الجيدة لصاحب العمل ، ميزانية المقاول و خبرته المنخفضة ، ضعف التصميم و قلة الايدي العاملة الكفوءة و الموارد ) من اهم العوامل التي تؤدي الى تعثر المشاريع .