research centers


Search results: Found 1

Listing 1 - 1 of 1
Sort by

Article
Delay – Cost Analysis For a Section Of Baghdad – Kirkuk Highway
تحليل الكلفة لطريق بغداد كركوك

Authors: Atheer N. Hameed اثير ناجي حميد --- Ali J. Kadhim علي جبار كاظم
Journal: Journal of Engineering and Sustainable Development مجلة الهندسة والتنمية المستدامة ISSN: 25200917 Year: 2011 Volume: 15 Issue: 4 Pages: 227-240
Publisher: Al-Mustansyriah University الجامعة المستنصرية

Loading...
Loading...
Abstract

This study aims to analyzing the delay – cost for a section of Baghdad - Kirkuk highway; this section (16 km length) has a lane width of 10 ft and shoulder width of 4 ft in each direction. The study results show that the average traffic delay for the studied section is (3 minute). The cost resulting from this delay for passengers and freights which had a negative effect on the Gross National Product [G.N.P] is (390,003,982 I.D./year).

تهدف هذه الدراسة إلى تحليل كلفة التأخير لمقطع من طريق بغداد – كركوك، هذا المقطع (16 km) له ممر واحد بعرض (10) قدم وأكتاف بعرض (4) قدم في كل اتجاه. أظهرت نتائج الدراسة أن معدل التأخير المروري للمقطع المدروس هو (3 دقائق). الكلفة الناتجة عن هذا التأخير للمسافرين والبضائع والتي لها تأثير سلبي على الناتج الإجمالي القومي تبلغ (390,003,982 دينار عراقي).

Listing 1 - 1 of 1
Sort by
Narrow your search

Resource type

article (1)


Language

Arabic and English (1)


Year
From To Submit

2011 (1)