research centers


Search results: Found 5

Listing 1 - 5 of 5
Sort by

Article
Scheduling Critical Activities on Multi-objectives Stochastic Projects

Author: Saad Mohsin Salman
Journal: Al-Nahrain Journal of Science مجلة النهرين للعلوم ISSN: (print)26635453,(online)26635461 Year: 2013 Volume: 16 Issue: 3 Pages: 246-251
Publisher: Al-Nahrain University جامعة النهرين

Loading...
Loading...
Abstract

In this paper, we consider the problem of stochastic multi-objectives project when some or all activities are interrupted and are on different allocations (i.e. are independent on each other). Some theories concerning multi-objectives problems are presented, and a new objective function is constructed). An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities, to obtain the corresponding critical cost index. A simple tested problem is presented.

تناول هذا البحث المشاريع التصادفية ذات الأهداف المتعددة عندما تكون هناك بعض أو كل الأنشطة ذات توقفات مفاجئه وفي أماكن مختلفة (بمعنى لاتعتمد على بعضها في التنفيذ) وقد تم تناولنا بعظاً من الجانب النظري لهذه المسائل. حيث تم بناء أسلوب لجدولة الأنشطة الحرجة من خلال تكوين بعض العلاقات المتبنية على كلف التأخير للمشروع بسبب العطلات المفاجئه للحصول على المؤشر الحرج لكل نشاط. وأخيراً تم عرض مثال بسيط لتوضيح المشكلة.


Article
Scheduling Critical Activities of Stochastic Projects Management Abstract
جدولة النشاطات الحرجة في أدارة المشاريع التصادفية

Authors: نذير عباس ابراهيم --- علاء الدين نوري احمد
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2012 Volume: 18 Issue: 68 Pages: 1-8
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT. Introduction Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model will give project managers a significant tool for replanning projects allocation decisions in response events and outcomes. As a result, the uncertainty associated with such risky projects should be reduced. No one factor can account for, or prevent, failure in a project. It is common practice for a project team to develop a comprehensive risk assessment and risk management plan. Identifying the most critical activities with regard to schedule risk is a problem faced by all project managers. The problem of identifying critical activities (CA) in a deterministic network is well understood, by standard Critical Path Method (CPM) known as Program Evaluation and Review Technique (PERT). Since a project could be delayed if these activities were not completed in the scheduled time. The classical PERT method is the probably is the best-known mechanism for considering the stochastic nature of activity durations, in which it is possible to develop estimates of the uncertainty of the project make span. For more details see [8] & [10 ].

تم في هذا البحث أعتماد مسألة تتعلق بشبكة المشاريع التصادفية, عندما يكون هنالك خللا ( ) في بعض أو جميع تلك النشاطات. وعلى ضوء ذلك تم بناء أسلوب رياضي لجدولة ( ) النشاطات الحرجة من خلال بناء بعض العلاقات الرياضية متأسسة على مفهوم الكلف التأخيرية الناتجة من النشاطات ذات التوقفات المفاجئة ( ), وتم عرض مثال مأخوذ من [12] للتحقق من الاسلوب المتبع.


Article
Planning and scheduling projects of municipal services using geographic information system (GIS) Applied Research in the Hindia city of the province of Karbala
تخطيط وجدولة تنفيذ مشاريع الخدمات البلدية بأستخدام نظام المعلومات الجغرافية(GIS ) بحث تطبيقي في مدينة الهندية ـ محافظة كربلاء المقدسة

Authors: نادية لطفي عبد الوهاب --- نوار رعد عبد المجيد
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2015 Volume: 21 Issue: 81 Pages: 112-130
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The research has handled an important service sector in Iraq which is the municipals sector since it is connected directly and closely with the services presented to the citizens, and because the process of accomplishing the projects needs planning and scheduling for implementing these projects according to the available financial allocating and it was no choice but finding modern methods that help succeeding the processes of planning through making use of Geographic Information system (GIS) in providing the necessary information in scheduling the projects since it is considered as one of the tools that conveys the occurred in collecting the huge amount of the locative data related to the items of the essential design of the towns .The problem of the research was represented by the large shortage in the presentation of the municipal services especially (paving، cladding، and Flooring ) in addition to the retrogression of these services in the total essential design of the town of Hindia with the weakness of the established plans which demonstrates the course of the municipals and its future plans، which we can evaluate the performance of these municipals about the projects that are going to be accomplished during the coming periods with the concentration of providing the services to certain areas while neglecting the other areas. The research aims to prepare schedules and charts to the areas belong to the Hindia Town by using the Satellite pictures and treating and producing them with the possibility of diagnosis the level of services presented in each area that belongs to the town under consideration, which would help in making the right decision related to the execution of the projects in such a way that secures the prevention of interference with projects of other enterprises in the town. The research reached many conclusions such as the absence of general plan that can guide the municipal establishments in the Hindia Town because of the unavailability of the data related to the level of the services presented and the actual need for different areas in the town of these services. One of the recommendations of the research is the necessity of the good future planning for executing the public services projects in the town with the establishment of central an integrated information Bank for the geographical information and the updating it continually to be used by the municipal establishments and the other authorities related to the process of planning to the future projects.

تناول البحث قطاع خدمي مهم في العراق اليوم ألا وهو قطاع البلديات وكان لابد من إيجاد طرائق حديثة تساعد في نجاح عمليات التخطيط للمشاريع من خلال الاستفادة من نظم المعلومات الجغرافية (GIS) في توفير البيانات الضرورية لجدولة المشاريع، كونها تعد أحدى الأدوات التي تواكب التطور الحاصل في جمع الكم الهائل من البيانات المكانية المتعلقة بمفردات التصميم الأساس للمدن . تمثلت مشكلة البحث بوجود نقص كبير في تقديم الخدمات البلدية وخاصة (التبليط، والاكساء، الرصف) فضلاﹰ عن تردي وضع هذه الخدمات وضعف الخطط الموضوعة والتي توضح مسار عمل البلديات بالمستقبل، التي يتم من خلالها تقييم أداء هذه البلديات عن الاعمال التي تنجزها خلال الفترات القادمة مع تركيز تقديم الخدمات لمناطق معينة واهمال مناطق أخرى . يهدف البحث إلى إعداد جداول وخرائط للمناطق التابعة لقضاء الهندية باستخدام الصور الجوية ومعالجتها وإنتاجها مع إمكانية تشخيص مستوى الخدمات في كل منطقة من المناطق التابعة للمدينة مما يساعد في اتخاذ القرار السليم فيما يتعلق بتنفيذ المشاريع بشكل يضمن عدم التداخل مع مشاريع لدوائر أخرى. وتوصل البحث الى استنتاجات عدة منها لا توجد خطة عامة تعمل من خلالها الدائرة البلدية في قضاء الهندية بسبب عدم توافر البيانات عن مستوى الخدمات المقدمة والحاجة الفعلية للمناطق المختلفة في القضاء من هذه الخدمات . أما من التوصيات التي توصل اليها البحث، لابد من التخطيط المستقبلي الجيد لتنفيذ مشاريع الخدمات العامة للمدينة مع إنشاء بنك معلومات مركزي يتعلق بالمعلومات الجغرافية لتستخدم من قبل الدوائر البلدية والجهات المختصة والتركيز على تعزيز عملية تكامل البيانات بين الدوائر البلدية والخدمية الأخرى من خلال بناء قاعدة بيانات موحدة وتحديثها باستمرار .


Article
Project Scheduling By using Goals Programming – An Applied Research In Modern Village Project (Residential Building Aspectin In Wasit Governorate)
جدولة المشروع باستعمال أسلوب برمجة الأهداف – بحث تطبيقي في مشروع القرية العصرية (محور ألابنية السكنية) في محافظة واسط

Authors: وقاص سعد خلف --- تمام سلمان خضر
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2015 Volume: 21 Issue: 85 Pages: 169-201
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

One of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost . the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building project , with acknowledgement that many activities of project net are of unconventional relations among each others (of type finish to start) ; and there are periods of (lead and lag) among each other for that reason , (primavera V6) program is used in project scheduling and management which is one of prime programs to find the time and cost of project accomplishment at normal and crash states ; and as project management has numerous goals , same of them are contradictory which are trying to do in one time and that require great working and decision-makers face difficulty to reach into accurate and suitable decisions (goal programming) method is used which is one of efficient and mathematical method to achieve the objectives the results obtained of the mathematical model solution with the use of (win Q.S.B V2) program show the importance and efficiency of this method in modern village project scheduling (residential building aspect) under numerous contrasted goal that project management determined according to their importance and to be achieved according to their importance and to be achieved in one time .

ان من اهم التحديات التي تواجه ادارة المشروع في الوقت الحاضر هو ضمان انجاز المشروع على الرغم من خضوعه لقيود محدده منها قيود تتعلق بالوقت واخرى تتعلق بالموارد المالية المخصصة للمشروع لذا فان هذا الامر يتطلب حساب دقيق للوقت والكلفة, فمشروع القرية العصرية (محور الابنية السكنية) هو احد المشاريع الضخمه والتي تسعى وزاره الزراعه الى انجازها في محافظة واسط حيث تم اختيار هذا المشروع بوصفه من المشاريع التي فيها العمل متلكأ وعلى هذا الاساس تمت دراسة المشروع من جديد وفق الاساليب العلميه والرياضية الحديثه حيث استعمل احد اساليب جدولة وادارة المشروع وهو أسلوب المسار الحرج (CPM) لايجاد وقت انجاز مشروع الابنيه السكنيه علما ان الكثير من الانشطة في شبكة المشروع لم تكن العلاقات بينها تقليدية (من نوع Finish to Start) كما تضمنت وجود فترات التقديم والتاخير (Lead and Lag) بينها وعليه تم استعمال احد البرامج الرائده في إدارة وجدولة المشروع وهو برنامج PrimaveraV6)) لايجاد وقت وكلفة انجاز المشروع في الظروف الطبيعية والتعجيلية، وبما ان لادارة المشروع اهداف عديدة ومنها متناقضة تسعى الى تحقيقها في ان واحد الامر الذي يتطلب الجهد الكبير وصعوبة الوصول الى القرارات المناسبة والدقيقة من قبل متخذ القرار فكان لابد من استعمال اسلوب رياضي كفوء وهو برمجة الاهداف (Goal Programming) لتحقيق هذه الاهداف حيث بينت النتائج المستحصلة من حل الإنموذج الرياضي باستعمال احد البرامج الجاهزة (WinQ.S.B V2) الى اهمية هذا الاسلوب وكفاءته في جدولة مشروع القرية العصرية (محور الابنية السكنية) في ظل وجود اهداف عديدة ومتناقضة لادارة المشروع حددتها وفق اهميتها وتسعى الى تحقيقها في ان واحد.


Article
PROJECT MANAGEMENT OF BALAD`S MAJOR SEWERAGE SYSTEM BY USING THE GOAL PROGRAMMING METHOD
ادارة مشروع مجاري بلد الكبير باستخدام أسلوب البرمجة بالأهداف

Authors: أمجد عباس عبد الرحيم البلداوي --- وقاص سعد خلف
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2016 Volume: 22 Issue: 93 Pages: 162-194
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve these projects in the determined time , added cost and technical specifications although the majority of these projects have been managed with predetermined time and financial resources limits , they still need some improved strategies and more careful calculation in their time and cost management. This project was chosen for the following reasons , The first reason is that the project is currently stopped, because of the security and financial circumstances in salahulddin province in particular .this is a great manage time and cost when the work is resumed , and the second reason is during the progress of the project, the until it was stopped, the completion percentage was behind what it was planned originally . this highlights the need to study how to avoid these delays in future using a scientific and logical method , and the third reason that the project has many variables that affect the progress, which are of great importance for scientific and mathematical methods . To achieve this purpose the project was studied using modern scientific and mathematical methods , which are the curved part method (CPM) for project's real and accelerated timing the Primavera V6 software and the AutoCAD 2015 software . the goal is to benefit from these methods and software to establish a new work schedule for the project . Due to the project's various and clashed (in sometimes) objectives that are have to be accomplished in a limited time , it is very important to be careful and accurate with making the right time . It was highly needed to use an efficient mathematical model that work with all these variables in the limited time allowed and according to their priorities . This mathematical method is called the Goal Programming for multi-objective mathematical models

يعد مشروع مجاري بلد الكبير احد اكبر المشاريع التي هي قيد الانجاز في محافظة صلاح الدين ضمن خطة تنمية الاقاليم للعام 2013 , فهو مشروع ضخم يسير باتجاهين الاول مد الشبكات و الثاني انشاء محطات الرفع وللمحورين ( الثقيل والمطري ) , والتي تسعى مديرية مجاري صلاح الدين تنفيذه لخدمة اربعة احياء في قضاء بلد . إن من أهم التحديات التي تعيق ادارة المشاريع اليوم هي التأكد من انجاز تلك المشاريع في وقتها المحدد , وكذلك الكلفة و المعاير الفنية المحدد ايضا , وعلى الرغم خضوع اغلب هذه المشاريع لقيود محددة ( محددات ) تتعلق بالوقت واخرى تتعلق بالموارد المالية المخصصة للمشروع لذا فأن موضوع الوقت والكلفة في ادارة اي مشروع يحتاج الى حسابات دقيقة لهما . وقد تم اختيار هذا المشروع للدراسة لعدة اسباب مهمة , السبب الاول : إن المشروع متوقف حاليا بسبب الظروف الامنية والمادية في صلاح الدين على وجه الخصوص , وهذا دافع كبير لدراسة كيفية التعامل مع وقت وكلفة انجازه في حال استأنف العمل به , والسبب ثانيا اثناء تنفيذ المشروع كانت هنالك انحرافات عن نسب الانجاز الفعلي , مما يدفع الى توفير دراسة وبأسلوب علمي ومنطقي لتجاوز هذه الانحرافات في المستقبل , اما السبب الثالث فهو إن المشروع يحتوي على الكثير من الانشطة مما يعطي اهمية كبيرة للأساليب العلمية والرياضية التي سوف تؤثر بشكل كبير في تنفيذ المشروع بأسلوب مدروس . لذا تمت دراسة المشروع من جديد وفقا لأساليب علمية ورياضية حديثة , اختيار اسلوب المسار الحرج (CPM) بوصفه احد اساليب الادارة العلمية للمشاريع لإيجاد وقت انجاز المشروع الطبيعي والتعجيلي , وبما ان لإدارة هذا المشروع اهداف متعددة تسعى الى تحقيقها في مدة زمنية محددة , الامر الذي يتطلب الكثير من الدقة في الوصول للقرارات المناسبة , فكان من الاجدر استخدام اسلوب رياضي كفوء لبناء نموذج رياضي متعدد الاهداف يعمل مع جمــيع هذه المتغـيرات في المدة الزمنية المحددة وبحــسب اولوياتهــا وتسمى البرمجة الهدفية ( (Goal Programming , وكذلك تم استخدام بعض البرامج الجاهزة لرسم الشبكة كبرنامج (Primavera V6 ) والبرنامج الهندسي المعروف (AUTO CAD 2015 ) , وبرنامج (Win QSB) لحل الأنموذج متعدد الاهداف , ومحاولة الافادة من مميزات هذه البرامج في جدولة المشروع .

Listing 1 - 5 of 5
Sort by
Narrow your search

Resource type

article (5)


Language

Arabic and English (3)

Arabic (1)

English (1)


Year
From To Submit

2016 (1)

2015 (2)

2013 (1)

2012 (1)