Article
Construction Risk Management

Authors: Abbas M. Burhan --- Zuhair M. Saco
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2006 Volume: 12 Issue: 2 Pages: 373-387
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

In most of the construction projects, there are many events or risks may occur during the execution of project. These risks (e.g. the excess of project cost or the expected time, increasing the prices of material and labor, accidents, changes, engineering errors or omissions, bad quality, delay in reaching the facilities to the site, etc.) may effect negatively on the project and the parties. Therefore, these risks must be identified and assessed accurately to avoid or reduce the negative effects for these risks. The concept of risk is used to assess and evaluate uncertainties associated with an event or a process. A construction process includes many uncertainties, therefore, the construction project’s parties are becoming aware of the construction process and thus the risks within this process are seeking more and more clarification that all is being done to remove foreseeable risk and minimize unforeseeable risk. It is also becoming clear that generic approaches to the management of risk are maturing and becoming easier to apply.

في أغلب المشاريع الإنشائية يتوقع حدوث الكثير من الأحداث أو المخاطر أثناء التنفيذ. تلك المخاطر ( مثل زيادة كلفة المشروع أو الزمن المتوقع لإنهائه، زيادة أسعار المواد أو العمال، الحوادث، التغيرات، الأخطاء والأهمالات، النوعية السيئة، ألخ ) ممكن أن تؤثر بصورة سلبية على المشروع وأطراف المشروع. لذا فأن تلك المخاطر يجب أ، تكون محددة ومقيمة بصورة دقيقة من أجل تجنب أو تقليل التأثيرات السلبية لتلك المخاطر. أن صناعة الإنشاء هي محاولة خطرة مع العديد من الشكوك المرتبطة بأحداث أو ظروف. تلك الأحداث ممكن أن تكون مخاطر منظورة (مثل تأخيرات، أضرا بات، إصابات، أخطاء وأهمالات، الخ) أو قد تكون مخاطر غير منظورة (مثل فيضانات، زلازل، حروب، الخ). أن مفهوم المخاطر يكون مستخدم لتقييم تلك الشكوك المرتبطة بحدث أو عملية. ولما كانت تلك الصناعة تتضمن الكثير من الشكوك (أو عدم التأكيد) فأن أطراف المشروع أصبحوا قلقين من تلك العملية الإنشائية التي فيها كل الأطراف يحاولون أن يتجنبوا المخاطر المنظورة ويقللوا من المخاطر غير المنظورة. كذلك أصبح واضح بأن مداخل كثيرة لإدارة المخاطر أصبحت مدروسة وسهلة التطبيق.


Article
risk analysis in Iraqi cars
تحليل اخطار السيارات في العراق

Authors: سعد زناد دروش --- عبد السلام لفته سعيد
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2011 Volume: 17 Issue: 63 Pages: 51-69
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

يهدف البحث الى تحليل اخطار السيارات باربعة اتجاهات في ذات الوقت: الاول في تحديد انواع اخطار السيارات والاهمية النسبية لكل منها، حيث تبين انها تتوزع بحسب اهميتها النسبية بين الاصطدام والدهس والانقلاب اضافة الى الاخطار الاخرى كالاحتراق والسقوط، والثاني في تحديد الاسباب الرئيسة والفرعية والثانوية لهذه الاخطار والاهمية النسبية لكل منها وفيه ظهر ان السائق يحتل السبب الاول من الاسباب المؤدية الى حصول الخطر وهو يمثل نسبة 84 % وقد تبين انها نتجت عن ثلاثة اسباب فرعية هي نقص المعرفة ونقص في التركيز ونقص في الوعي والاخير هو الاكثر اهمية، والثالث في تحديد الخسائر البشرية والمادية المتحققة من هذه الاخطار وتبين انها كانت بمتوسط سنوي مقداره (4259) قتيلا و (22727) جريحا اضافة الى خسائر مادية بمتوسط سنوي مقداره (9785539) دينار، واخيرا فان الاتجاه الرابع هو في تحديد اساليب مواجهة هذه الاخطار من خلال التصدي لأسبابها، وهو ماعرض في توصيات البحث.


Article
Influence of Risks on Project Planning Decision

Authors: Alaa Salahudien Araibi --- Suaad Kh. Ibraheem --- AllaEldin H. Kassam
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2016 Volume: 34 Issue: 6 Part (A) Engineering Pages: 1247-1252
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

In this research, a "Project planning / Risk analysis" model that consists of four modules has been developed to aid the decision-maker in planning different types of projects and analyze the risks. These modules are: Planning, Decision-Making Process 1, Risk Analysis, and Decision-Making Process 2.The model can be used to generate different scenarios of project plan according to the decision-maker's opinion in choosing the type of probability distribution, changing the probability/impact of the risk occurrences and/or changing the input values (time/cost) into the probability distribution. These scenarios will be resulted by Monte Carlo simulation as well as the application of qualitative techniques to assess risks and combining their probability of occurrence and impact, and quantitative techniques to numerically analyze the effect of identified risks. Moreover, it gives the decision-maker the ability of avoiding unexpected events through providing a futuristic look of the most project risky activities by implementing risk ranking matrix using heat map. The developed model will go through interrelating three software; Microsoft Project, Microsoft Excel and @Risk from Palisade.


Article
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
تقييم تأثير المخاطر على اهداف وسلامة المشاريع الانشائية في العراق

Author: Entisar Kadhim Rasheed انتصار كاظم رشيد
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2015 Volume: 21 Issue: 4 Pages: 1-19
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk. The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.The research aims first to the effective planning for analysis and risk management with different levels of importance according to specific strategy and effective based on experts in the field of risk management and, second, reaching measures to respond to the risks in order to ensure the management of these risks in construction projects. In this research a number of risks are identified which that have been incurred actually after studying a number of completed construction projects and theoretical studies and interview a number of experts in the construction industry to determine the impact of these risks in each of the project's objectives and safety.It appeared that the most important risks in construction projects in Iraq is ( the lack of drawings for networks service through the site such as electrical drawings, phone, water, etc.) and ( differences between the implementation and the required specifications because of a misunderstanding of the plans and specifications, It also appeared that the biggest effect of the risks is the on the duration of the project and the least was on occupational safety, and the best response to the risk is to fix certain conditions in the contract followed by other responses.

تعتبر مشاريع التشييد ذات طبيعة خاصة وتؤثر عليها عوامل كثيرة مما يجعلها تتعرض الى مخاطر متعددة وذلك نتيجة لطول فترة التنفيذ وتعدد المراحل ابتداءً من مرحلة القرار مروراً بالتنفيذ وحتى التسليم النهائي، الامر الذي يؤدي الى زيادة عدم التأكد وزيادة احتمالية وقوع المخاطر، تعد عملية تحليل وادارة المخاطر من الاساليب الفعالة والمثمرة التي تستخدم في ادارة مشاريع التشييد لغرض زيادة فرص انهاء المشروع بنجاح من ناحية الكلفة والوقت والجودة وبأقل ما يمكن من المشاكل. يهدف البحث اولاً الى التخطيط الفعال لتحليل وادارة المخاطر ذات مستويات الاهمية المختلفة وفق استراتيجية محددة وفعالة معتمدة على خبراء متخصصين في مجال ادارة المخاطر، وثانياً التوصل الىى اجراءات للاستجابة للمخاطر بما يكفل ادارة هذه المخاطر في مشاريع البناء. حددت في هذا البحث عدد من المخاطر التي تم حدوثها فعلاً من دراسة عدد من مشاريع البناء المنجزة ومن الدراسات النظرية ومقابلة عدد من خبراء صناعة التشييد لتحديد مدى تأثير هذه المخاطر في كل من أهداف المشروع وسلامته. ظهر ان من اهم المخاطر في المشاريع الانشائية في العراق هي (عدم توفر المخططات للشبكات الخدمية المارة خلال الموقع كالمخططات الكهربائية , الهاتف , الماء , وغيرها ) و ( فروقات بين التنفيذ والمواصفات المطلوبة نتيجة لسوء فهم المخططات والمواصفات)، كما ظهر ان اكبر تاثير للمخاطر هو على مدة تنفيذ المشروع وأقلها كان على السلامة المهنية، وان اجراء الاستجابة للمخاطر بوضع شروط عقدية هو الاجراء المفضل ثم يليه الاجراءات الاخرى.


Article
Application of Total Quality Management (TQM) Requirements in Risk Management in Construction Projects in Iraq
تطبيق متطلبات ادارة الجودة الشاملة في ادارة المخاطر في المشاريع الانشائية في العراق

Authors: Entisar K. Al-Geelawee انتصار كاظم الجيلاوي --- Anfal Nadhel Mohammed انفال ناضل محمد
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2016 Volume: 22 Issue: 6 Pages: 1-15
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. The research has consist of two main parts firstly have included a review of the most important concepts of total quality management in addition to the concept of risk analysis and management in construction projects and how to apply the concept of total quality management in the risk analysis and management. Second part included the practical part of the research, which was open and closed questionnaire for experts in the construction industry to obtain required informations for the application of total quality management requirements in risk management in construction projects in Iraq. One of the main findings of the research is that top management support has a high impact on risk management in addition to continuous improvement, training and education, while the participation of all employees in the organization and constant stimulation and focusing on the customer as one of the total quality management requirements had a moderate impact on risk management.

تعتبر ادارة الجودة الشاملة مدخلا علميا حديثاً تمارسه المنظمات الانتاجية او الخدمية وتقوم بتقديم المخرجات الملائمة المرغوبة للجودة وفق حاجة ورغبة الزبون, ان تمكين المنظمات التي تسعى للاستمرار والتطور مع وجود منافسة عالية من التلبية والتوفير لمتطلبات ادارة الجودة الملائمة سيؤدي الى مواجهة المخاطر ومعالجتها مع ايجاد الطرق التي تؤدي الى تفاديها في المستقبل في حال تكرارها. لقد تضمن البحث جزئين اساسيين اولهما استعراض لاهم مفاهيم ادارة الجودة الشاملة بالاضافة الى مفهوم تحليل وادارة المخاطر في المشاريع الانشائية وكيفية تطبيق مفهوم ادارة الجودة الشاملة في تحليل وادارة المخاطر. اما الجزء الثاني فتضمن الجزء العملي للبحث وهو اجراء استبيان مفتوح ومغلق للخبراء في قطاع صناعة التشييد للحصول على البيانات لتطبيق متطلبات ادارة الجودة الشاملة في ادارة المخاطر في المشاريع الانشائية في العراق. ان من اهم النتائج التي توصل اليها البحث هو ان دعم الادارة العليا يؤثر تأثيرا عالياً على ادارة المخاطر, بالاضافة الى التحسين المستمر والتدريب والتعليم في حين ان مشاركة كافة العاملين في المنظمة والتحفيز المستمر والتركيز على الزبون كمتطلبات لتطبيق ادارة الجودة الشاملة تأثير متوسط على ادارة المخاطر.

Listing 1 - 5 of 5
Sort by
Narrow your search

Resource type

article (5)


Language

Arabic (2)

English (2)

Arabic and English (1)


Year
From To Submit

2016 (2)

2015 (1)

2011 (1)

2006 (1)