Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
موديل رياضي لأمثلية الوقت والكلفة الانشائية بأستخدام امثلية مستعمرة النمل

Authors: Mohammed Nooruldeen Azeez --- Angham Alsaffar
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2014 Volume: 20 Issue: 1 Pages: 114-131
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities. In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm.

ان الوقت والكلفة هي اهم العوامل المأخوذة في تخطيط اي مشروع، في اختصاص ادارة المشاريع الانشائية. وان العلاقة بين الوقت والكلفة معقدة. فأن الكلفة الكلية في اي مشروع تمثل مجموع الكلف المباشرة وغير المباشره، وتمثل الكلف المباشره كلف العمالة والمواد والمعدات ، الخبينما الكلف غير المباشره تمثل بصورة عامة مصاريف الاشراف و الاداريات والاستشارية اضافة الى الفوائد.الكلف المباشرة تزداد بنسبة كلما طال عمر المشروع عن عمره المقرر ، بينما الكلف غير المباشره تستمر طيلة عمر المشروع وان اي تقليل في مدة المشروع عن المدة المحددة تعني تقليل الكلف غير المباشره ، لذا فان هنالك مقايضة بين الكلفة والوقت في اكمال الفعاليات الانشائية.في هذا البحث ، سوف يتم انشاء موديل لحساب امثلية الوقت-الكلفة الانشائية. توليد حلول مثلى عالمية للوقت والكلفة, تقليل الوقت والكلفة بأستخدام طريقة مستعمرة النمل.


Article
The Use Of Modern Technologies In The Exchange Of Time And Cost To Complete Projects In A Foggy Environment
استعمال التقنيات الحديثة في المبادلة بين الوقت والكلفة لانجاز المشاريع في بيئة ضبابية

Loading...
Loading...
Abstract

The problem of blurry in the completion of projects, especially building projects of the important problems that should be appropriate solutions to them in order to obtain an integrated and successful project and within the standards required by committing to the time of completion and investment resources available to the implementing agency of the best investment, the problem is the result of information or data It is necessary to find a realistic and practical way to address this problem through the application of the concept of fog theory developed by the world (Zadeh. L. A.) and Working with the logic tools in the MATLAB program and employing the modern Time-Cost Trade-Off technology to determine the optimum time for project completion and the lowest possible cost increase using project management software including MS Project .

تعد مشكلة الضبابية في انجاز المشاريع وبخاصة مشاريع الابنية من المشاكل المهمة التي ينبغي وضع حلول مناسبة لها بغية الحصول على مشروع متكامل وناجح وضمن المواصفات القياسية المطلوبة من خلال الالتزام بوقت الانجاز واستثمار الموارد المتاحة للجهة المنفذة للمشروع افضل استثمار ، ان هذه المشكلة ناتجة عن معلومات او بيانات غير واضحة تعاني من الغموض او بسبب وجود نقص فيها سواء كانت متعلقة بوقت او بتكلفة انجاز المشاريع لهذا كان من الضروري ايجاد طريقة واقعية وعملية لمعالجة هذه المشكلة من خلال تطبيق مفهوم نظرية المجموعة الضبابية التي وضعها العالم (Zadeh L.A.) واستعمال ادوات المنطق الضبابي في برنامج (MATLAB) وتوظيف لتقنية المبادلة الحديثة بين الوقت و الكلفة ( Time-Cost Trade-off ) لتحديد الوقت الامثل لانجاز المشاريع وبأقل زيادة ممكنة في التكاليف باستعمال برمجيات ادارة المشاريع ومنها برنامج (MS Project) .