Influence of Subcontracts on Increasing Productivity in Constriction Projects
تأثير المقاولات الثانوية في زيادة الانتاجية في المشاريع الانشائية - دراسة ميدانية لمشاريع مجمع جامعة تكريت-

Author: زياد سليمان محمد خالد
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2005 Volume: 24 Issue: 5 Pages: 230-261
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract


Article
Study on Safety Construction Management Plan
دراسة في خطة ادارة الانشاء والسلامة

Authors: Sawsan Rasheed Mohammad سوسن رشيد محمد --- Ahmed M. Rasheed احمد محمد رشيد
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2014 Volume: 20 Issue: 11 Pages: 1-19
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

After studying the reality of application to occupational safety in new Iraqi building projects and sampling the situation wilt that in developed and neighboring countries, researcher found that there is a big gap in the level of safety application conditions, this indicates the need fora quick and clear reference for local engineers to use it on site for safety conditions in their projects . As a case study the monitors work the researcher studied a huge project in the United Arab Emirates.This project considered for safety requirements to highest grades. This case study may be far away from the projects in Iraq, but we hope to rise the Iraqi work level in the near future. After seeing the way of administration work and how they were rated the severity of each phase of the work, an idea was builtabout the most dangerous situations in projects with multiple floorsbuildings. To find multiple solutions to the risk, researchers identified 46 cases with their ratings, type of perceived risk in each case, and displayed a format survey to the most important specialized institutions and companies operating in Iraq and the United Arab Emirates. Finally theresearcher takes the results,and format a software that any user can use in his personal computer to studythe expected risk,how to avoid it and how to deal with it if it happens.

بعد دراسة واقع حال مستوى تطبيق السلامة المهنية في مشاريع بناء العراق الجديد ومقارنة ذلك الحال بما هو عليه في البلدان المتطورة والبلدان المجاورة وجدالباحث ان هنالك فجوة كبيرة في مستوى تطبيق شروط السلامة ومن ذلك تكونت الفكرة في ايجاد مرجع سريع وواضح يستطيع المهندسون المحليون الاستعانة به موقعيآ لتطبيق شروط السلامة في مشاريعهم , لذلك قام الباحث بدراسة حالة لمشروع ضخم في دولة الامارات العربية المتحدة تم فيه تطبيق شروط السلامة بأعلى الدرجات ونحن نعلم ان الحالة الدراسية قد تكون بعيدة نوعآ ما عن نوع المشاريع المطبقة في العراق ولكننا نأمل ان يرتقي مستوى العمل في العراق الى ذلك الحجم في المستقبل القريب . وبالفعل بعد الاطلاع على طريقة ادارة العمل وكيف تم تصنيف درجة خطورة كل مرحلة من مراحل العمل اصبح لدى الباحث تصور عن اهم الحالات الخطرة في مشاريع البنايات متعددت الطوابق ولكي يكون لدينا حلول متعددة للمخاطر قام الباحث بتحديد 46 حالة مع تصنيفاتها ونوع المخاطر المتوقعة لكل حالة وعرضها بصيغة استبيان شمل اهم المؤسسات المتخصصة والشركات العاملة في العراق ودولة الامارات وخرج الباحث بنتائج تم تبويبها بصيغة برنامج حاسوبي يستطيع اي مستخدم ان يستعمله في حاسوبه الشخصي موقعيآ وبمجرد الضغط على مربع اي حالة نستطيع معرفة الخطر المتوقع وكيفية تجنبه وطريقة التعامل معه ان حدث. مع عمل جزء نظري لشرح طريقة التعامل مع البرنامج الحاسوبي.


Article
Dowel Action between Two Concretes
الفعل الوتدي بين خرسانتين

Authors: Hakim S. Muhammed --- Nazar K. Oukaili --- Husain M.Husain
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2009 Volume: 15 Issue: 2 Pages: 3583-3605
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

This paper reports eight tests in which in-plane shear forces are applied across the joint between two different concretes forming a composite action. Shear can be transmitted across the joint either by interlocking of the aggregate particles protruding from each face or by shearing of the reinforcement crossing the joint. Tests are conducted on initially cracked specimens by depending only on dowel action. The results of the tests are compared with theoretical results of the exponential equation presented by Millard and Johnson. The computer program of Al-Shaarbaf using the nonlinear behavior of concrete is used to perform the analysis with inclusion of the exponential equation for dowel action in the interface layer. The program uses 20-node brick elements with embedded bar elements. This program is also applied to Hofbeck et al. tests. The comparison shows that the experimental and the analytical results give good agreement where the difference between the two is between (2.5-5)% . The use of the exponential equation gives good results when the concrete is assumed to be initially cracked as in construction joints.

تم أجراء ثمانية فحوص سلطت فيها قوى القص عبر الشق أو الشرخ الموجود بين خرسانتين مختلفتين مكونتين للفعل المركب. يمكن نقل القص عبر الشق أما بتداخل حبيبات الركام البارزة من كل من وجهي الشق أو من خلال التسليح العابر للشق. أجريت الفحوص على نماذج متشققة ومعتمدة فقط على الفعل الوتدي. قورنت نتائج الفحوصات مع نتائج نظرية لمعادلة أسية قدمت من قبل ميلارد وجونسون. ولغرض أجراء التحليل الأنشائي فقد تم استخدام برنامج الشعرباف الآخذ بنظر الأعتبار ا السلوك اللاخطي للكونكريت وبالاعتماد على المعادلة ألأسية للفعل االوتدي للطبقة البينية. تم تطبيق البرنامج الذي يستعمل عناصر طابوقية ذات 20 عقدة مع عناصر قضبان مطمورة على فحوصات هوفبك وجماعته. قورنت النتائج التحليلية الحالية مع نتائج فحص هوفبك وجماعته وقد أعطت النتائج العملية والتحليلية مقارنة جيدة. أن أستعمال المعادلة ألأسية يعطي نتائج للطبقة البينية يعطي نتائج جيدة فقط حينما تكون الخرسانة متشققة مسبقا كما في المفاصل الأنشائية.


Article
INVESTIGATION PROBLEMS OF DOCUMENTATION, UPDATING INFORMATION AND FOLLOWING UP CONSTRUCTION PROJECT IN IRAQ
تحري مشاكل التوثيق, تحديث المعلومات و متابعة المشروع الانشائي في العراق

Author: Hassan Issa Abdul-Kareem
Journal: Journal of Engineering and Sustainable Development مجلة الهندسة والتنمية المستدامة ISSN: 25200917 Year: 2017 Volume: 21 Issue: 1 Pages: 193-204
Publisher: Al-Mustansyriah University الجامعة المستنصرية

Loading...
Loading...
Abstract

نوع الاعمال في شركات البناء والمشاريع تتطلب التعامل مع كمية كبيرة ومعقدة من الوثائق والمعلومات بسبب العمليات المتعددة و الاطراف المتعددين المتضمنين في شركات البناء والمشاريع. عمليات التوثيق, تبادل المعلومات و تحديث البيانات والمعلومات اصبحت من التحديات الادارية. هذه الدراسة تهدف الى تحري وجود المشاكل التي تتعلق بانشاء المستندات, تحديث المعلومات و متابعة المشروع الانشائي في العراق. هذه المشاكل ممكن تلخيصها ما يلي: تبادل المعلومات, تحديث الوثائق والبيانات, الربحية والانتاجية, كفاءة العمل, المتطلبات التنافسية, متابعة التغيرات اول باول, الوصول الى المعلومات, تسجيل التاخير و تخصيص موارد المشروع. منهجية البحث لهذه الدراسة تتكون من جزئين, المراجعة الادبية والاستبيان, استنادا الى الدراسات السابقة ذات الصلة بموضوع الدراسة, حصل الباحث على اسئلة البحث لبناء استمارة الاستبيان. خمس خيارات للاجابة تم اعتمادها في استمارة الاستبيان. مجتمع البحث لهذه الدراسة هم اعضاء فريق العمل في الاعمال الانشائية في الشركات والمشاريع. 150 استمارة استبيان تم توزيعها و تم جمع 80 استمارة فقط , أي معدل نسبة الاجابة كانت حوالي 53%. أظهرت نتائج هذه الدراسة بانه في بعض الاحيان توجد المشاكل المتعلقة بتبادل المعلومات, تحديث الوثائق والبيانات, الربحية والانتاجية و كفاءة العمل. مشكلة الحاجة الى المتطلبات التنافسية موجودة دائماً. اما المشاكل المرتبطة بمتابعة التغيرات اول باول, الوصول الى المعلومات’ تسجيل التاخير و تخصيص موارد المشروع فان اغلب الشركات تواجهها احيانا,ً في حين البعض الاخر من الشركات تواجهها غالباً او دائماً فهي مشاكل موجودة على اية حال. باختصار,نستنتج ان المشاكل المتعلقة بالتوثيق, تحديث المعلومات, ومتابعة المشاريع الانشائية في العراق موجودة ولكن ليست كبيرة جداً بسبب كون اغلب الشركات والمشاريع ليست كبيرة.

The type of works in construction companies and projects imposes dealing with large and complicated amount of documentation and information due to the multi processes and stakeholders involved in construction companies and projects. The processes of documentation, exchanging information, and updating these documentation and information became management challenges. This study aims to investigate the existence of the problems which related with documentation, updating information and following up construction project in Iraq. These problems could be summarized with the following shortcuts: Exchanging information, Updating Documents, Profitability and productivity, Working Efficiency, Competitiveness Requirements, keeping Up to date with Changes, Information Access, Recording Delay and Resources Allocation. Based on the related previous studies, the researcher detected the research questions to build the questionnaire form. Five scales of answer options have been adopted in the questionnaire form. The research population of this study is the team parties involved in the construction works of the companies and projects. 150 questionnaire forms have been distributed, but only 80 forms are collected. Accordingly, the responding rate is about 53%. The findings of this study revealed that the problems which related with Exchanging Information, Updating Documents, Profitability and productivity, and Working Efficiency exist, but a company sometimes faces it. The problem of Competitiveness Requirements exists and a company always suffers from it. The problems of keeping Up to date with Changes, Information Access, Recording Delay and Resources Allocation exist and most of the companies sometimes safer from it, so, however, these problems are existing. In a brief conclusion, the problems of documentation, updating information and following up construction project in Iraq exist but not so big because most of companies and projects are not big enough.


Article
CHALLENGES FACING CONSTRUCTION CONTRACTS IN IRAQ

Author: Sultan Noori Al-karawi
Journal: Journal of Engineering and Sustainable Development مجلة الهندسة والتنمية المستدامة ISSN: 25200917 Year: 2018 Volume: 22 Issue: 4 Pages: 192-201
Publisher: Al-Mustansyriah University الجامعة المستنصرية

Loading...
Loading...
Abstract

This paper aims at exploring the most important challenges which are facing the construction contracts in Iraq, and trying to analyze these challenges from various aspects. Addition, we have put necessary recommendations to support this sector through some notes and appropriate plans. Challenges are classified into eleven major problems (Political Problems, financial problems, administrative problems, problems related to the tender documents (contracts, drawings), problems related to the specifications and materials adaptation (Quality), problems related to the contract parties themselves, problems related to the sector environment, problems related to the natural environment, problems related to the arbitrations and disputes solving, problems related to the technology uses, problems related to the career ethics). These varieties have been agreed upon through questionnaire that was made for a number of the relevant authorities about the challenges facing them in construction sector. Each one of them contains a minor problems, it will be discussed such as (Rates burning due to intense competition between contractors, awarding the bid to the lowest prices not to the most accurate, delaying paying owed payments by the owner, the changing value of currency exchange). Finally the recommendations and appropriate procedures to avoid these problems, it was (Price estimation before tendering, Awarding the nearest price, rejecting offers less than 25% of the estimated), and there is other recommendations we have mentioned in this paper for another more challenges.


Article
البرمجيات الحـــــديثة في المســــــــــح الكــــــمي للمشــــــــــــاريع الإنشــــــــــــــائية

Authors: Sahira Aldagstany ســـاهرة رديف الداغستاني --- Mohammed Mosleh Salman محمد مصــلح سلــمان
Journal: Journal of Engineering and Sustainable Development مجلة الهندسة والتنمية المستدامة ISSN: 25200917 Year: 2014 Volume: 18 Issue: 1 Pages: 1-15
Publisher: Al-Mustansyriah University الجامعة المستنصرية

Loading...
Loading...
Abstract

The engineering project management is one of the most important elements contributing to the success or failure of a business, there is no doubt about how important is the management to succeed in any area, especially in the field of construction projects that are more complex administratively and practically than other administration areas. The project construction passes through several important stages before the implementation process which have major impact to the success of the construction project and these stages are the cost estimate stage and the initial design phase and the estimated budget preparation. Thus, expenditure on design, including serving the employer followed by the announcement about the tender, at this stage the contractor should (executing companies) the preparation of the cost within a short period of time to bid for projects which depends on the quantities guess. Thus, the quantitative survey of projects affects the construction project at most stages. The aim of this research to develop methods of engineering management construction projects by reducing the effort and cost and the time exploiter to calculate the quantities byusing modern software (Planswift) to calculate the estimated quantities. The practical part of this research includes the calculation of the estimated quantities and the Concrete by using the traditional methods and using the program (planswift) then the results compared with three of construction projects carried out by one of governmental construction contracting companies in Iraq.

تعتبر الإدارة الهندسية للمشروع من أهم العناصر المساهمة في إنجاح العمل أو فشلهُ, ولا يخفى على أحد ما للإدارة في أي مجال من أهمية خاصة لإنجاح العمل و خاصة في مجال المشاريع الإنشائية التي تعتبر أكثر تعقيداً إدارياً وعملياً من معظم مجالات الإدارة الأخرى. ويمر المشروع الإنشائي بعدة مراحل تسبق عملية التنفيذ ذات أهمية وتأثير كبيرين في إنجاح إنجاز المشروع الإنشائي بأكمله ومنها مرحلة تقدير الكلفة و مرحلة التصميم الأولي وإعداد الميزانية التقديرية وبالتالي الإنفاق على التصميم بما يخدم صاحب العمل وتتبعها إعلان المناقصة وفي هذه المرحلة على المقاول ( الشركات المنفذة) إعداد التكلفة خلال فترة قصيرة من اجل تقديم العطاء للمشاريع. والتي تعتمد على تخمين الكميات . وبالتالي فإن المسح الكمي للمشاريع يؤثر في المشروع الإنشائي في أغلب المراحل. يهدف هذا البحث إلى تطوير طرق الإدارة الهندسية للمشاريع الإنشائية وذلك بتقليل الجهد والكلفة والوقت المستغل لعملية حساب الكميات وذلك باستخدام البرمجيات الحديثة (Planswift) لحساب الكميات التخمينية. ويتضمن الجزء العملي من البحث حساب الكميات التخمينية الأعمال الخرسانية باستخدام الطرق التقليدية وباستخدام البرنامج (Planswift) ومقارنة النتائج لثلاث من المشاريع الإنشائية المنفذة من قبل أحدى شركات المقاولات الإنشائية الحكومية في العراق.


Article
THE CONSTRUCTION AND MAXIMAL SET OF MUTUALLY ORTHOGONAL LATIN SQUARES
المجموعة العظمى من المربعات اللاتينية المتعامدة المتبادلة وتكوينها

Author: MAKARIM A. AL-TURKY مكارم عبدالواحد عبدالجبار
Journal: Journal of university of Anbar for Pure science مجلة جامعة الانبار للعلوم الصرفة ISSN: ISSN: 19918941 Year: 2007 Volume: 1 Issue: 1 Pages: 76-81
Publisher: University of Anbar جامعة الانبار

Loading...
Loading...
Abstract

Given aset of permutation {p1,p2, … . pk} on aset S, we say that the set of permutation is transitive on S if for every ordered pair of elements a,b € S, there exists at least on Pi for which (a) Pi=b. A permutation set for which there is exactly one Pi which maps a to b is called Sharply transitive.
For example, if on the set consisting of the three elements {1,2,3} we represent the permutation which maps 1 3 ,2 2 and 3 1by (321). Then the following set of permutation is transitive.(123),(132),(213) and (321) and the last three permutation form sharply transitive set. This construction give a set of mutually orthogonal latin squares. A set S of mutually orthogonal latin squares(MOLS) is maximal if no latin square is orthogonal to each member of S.

إذا S يمكن ان نقول مجموعة التباديل هي متعدية على . S على المجموعة {P1, P2 ,….. Pk } لو كانت لدينا التباديلi يوجد على الأقل مجموعة لتباديل لتطبيق واحد بالتحديد . S الذي ينتمي إلى a,b كان كل زوج مرتب من العناصريسمى متعدي جدا ومثال على ذلك لو كانت لدينا مجموعة تتكون من ثلاثة عناصر { 1,2,3 }يمكن تمثيل التباديل b إلى a من P( 3على الشكل( 123 ) والتباديل المتعدية هي ( 123 ) و( 132 ) و( 213 ) و( 321 ←1,2←2,1← على شكل تطبيق بحيث 3والتباديل الثلاثة الأخيرة تمثل مجموعة متعدية جدا . هذا البناء يعطينا المربعات الاتينية المتعامدة المتبادلة . مجموعه من.S المربعات الاتينية المتعامدة تعتبر هي المجموعة العظمى اذا كان لايوجد مربع لاتيني متعامد لأي عدد من


Article
COST AND TIME CONTROL DURING PLANNING AND CONSTRUCTION STAGES IN CONSTRUCTION PROJECTS
السيطرة على الكلفة والوقت خلال مرحلتي التخطيط والانشاء في المشاريع الانشائية

Author: Ibtisam Mohammed Ali ابتسام محمد علي
Journal: Al-Qadisiyah Journal for Engineering Sciences مجلة القادسية للعلوم الهندسية ISSN: 19984456 Year: 2011 Volume: 4 Issue: 4 Pages: 509-527
Publisher: Al-Qadisiyah University جامعة القادسية

Loading...
Loading...
Abstract

This research aims to develop time scheduling model including time cost trade off analysis, resource leveling and cash flow management during planning stage and project control during construction stage. To achieve research objectives, available options to improve project financing and current controlling techniques have been studied. The proposed model has been formulated using Excel program to combine CPM computations, time-cost trade off analysis, resource leveling, cash flow analysis and project control. The project management software (MS-Project) has been adopted to perform resource allocation and resource leveling to facilitate achieving the optimum solution in which the project can be performed with minimum cost, supposed deadline and within limited resources. The proposed model utilizes Solver built in Excel program to optimize interest charges or overdraft amount. This research reached the conclusion that it is possible obtain optimum solution performing time cost trade off analysis and resource leveling using Evolver program and then take the results of optimization process to perform cash flow optimization. The proposed model can measure deviations of actual progress from the baseline and monitor project progress to decide on proper corrective actions.Research results have been applied to a hypothetical case study and the application results come identical with research objective. Conclusions have been reached, recommendations regarding adopting and using the research results in construction planning and project management has been suggested.

يهدف البحث الى تطوير نظام جدولة يتضمن تحليل توافق الوقت مع الكلفة وتسوية الموارد وادارة التدفق النقدي خلال مرحلة التخطيط والسيطرة على المشروع خلال مرحلة التشييد. للوصول الى هدف البحث تمت دراسة الخيارات المتوفرة لتحسين تمويل المشروع ودراسة تقنيات السيطرة الموجودة. لقد تمت صياغة الموديل المقترح باستخدام برنامج اكسل ليتضمن حسابات طريقة المسار الحرج وتوافق الوقت مع الكلفة وتسوية الموارد وتحليل التدفق النقدي والسيطرة على المشروع. تم اعتماد برنامج ادارة المشاريعMSProject لانجاز تخصيص وتسوية الموارد وذلك اتسهيل الوصول الى الحل الامثل والذي يضمن انجاز المشروع بأقل كلفة ممكنه والوقت المحدد ضمن عقد المقاولة وكذلك ضمن محددات الموارد. وقد تم استخدام Solver ضمن برنامج أكسل لايجاد القيمة المثلى لمجموع الفائدة المحملة أو مجموع الاموال المطلوبة لتمويل المشروع. تم الاستنتاج من خلال البحث الى انه من الممكن التوصل الى الحل الامثل من خلال انجاز تحليل توافق الوقت مع الكلفة وتسوية الموارد بأستخدام برنامج Evolver ويتم اخذ نتيجة الحل الامثل لآنجاز امثلية التدفق النقدي. من خلال الموديل المقترح يمكن قياس الانحرافات لتقدم العمل الحقيقي عن المخطط انجازه ومراقبة تقدم عمل المشروع لاتخاذ الاجراءات التصحيحية المناسبة. تم تطبيق نتائج البحث على حالتين دراسيتين وكانت نتائج التطبيق مطابقه لما هدف اليه البحث. لقد تم التوصل الى عدد من الاستنتاجات كما وضعت عدد من التوصيات والمقترحات بشأن تبني واستخدام نتائج البحث في حقل التخطيط وادارة المشاريع الانشائيه كذلك وضع عدد من المقترحات لبحوث لاحقه ذات صله بموضوع البحث.

Keywords

Cashflow --- Control --- Time --- Cost --- Construction Stage.


Article
Investigation of the Behavior for Reinforced Concrete Beam Using Non-Linear Three-Dimensional Finite Elements Model

Authors: Israa Kh. AL-Shimmari --- Nagham T.Hamad --- Waleed A Waryosh
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2011 Volume: 29 Issue: 10 Pages: 1870-1885
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

This study presents theoretical investigation that reinforced concrete and composite construction might be suitably combined to give a new structural material: composite reinforced concrete. To study theoretically the composite beam, nonlinear three-dimensional finite elements have been used to analyze the tested beam.The 8-node brick elements in (ANSYS) are used to represent the concrete, the steel bars are modeled as discrete axial members connected with concrete elements at shared nodes assuming perfect bond between the concrete and the steel. The results obtained by finite element solution showed good agreement with experimental results.


Article
STRUCTURAL BEHAVIOUR OF FERROCEMENT SYSTEM FOR ROOFING
السلوكية الإنشائية لنظام تسقيف من الفيروسمنت

Author: Wail N. Al-Rifaie وائل نورالدين الرفاعي
Journal: DIYALA JOURNAL OF ENGINEERING SCIENCES مجلة ديالى للعلوم الهندسية ISSN: 19998716/26166909 Year: 2010 Volume: Engineering Sc. Conference Issue: First Pages: 237-248
Publisher: Diyala University جامعة ديالى

Loading...
Loading...
Abstract

ABSTRACT:- The growing need for cheaper construction is much-discussed subject. Prefabricated ferrocement panels present a series of possibilities for the solution of construction problem. By using the unique properties of ferrocement with a relatively low amount of reinforcement, be composite floor and wall panels can assembled into an effective multi-purpose panel system. The major advantages of this system over current construction methods are mainly due to the reduction in structural dead load and the use of fewer building elements, which are much easier to handle. In the present investigation, two ferrocement channel-like beams to form I-cross section beam and four ferrocement plates are cast and tested due to flexural loading. The structural behaviour was monitored by reading the deflection and by observing the crack patterns. The measured values of deflections and the observations made indicated that ferrocement can be used in construction of buildings.Keywords:- construction, structural, ferrocement.

الخلاصة ان زيادة الاحتياج إلى وحدات سكنية واطئة الكلفة تتطلب إيجاد أنظمة إنشائية جديدة تتميز بأنها اقتصادية مع الحفاظ على متطلبات المتانة وسرعة الانجاز والإيفاء بالمتطلبات البيئية. وبذلك أصبح من الضروري السعي في إيجاد عناصر إنشائية مسبقة الصنع تمتاز بخفة الوزن وسهولة المناولة والحد الأدنى من الصيانة والكلفة الواطئة. ان الكلفة الواطئة ومتطلبات العمالة تجعل السمنت الحديدي مادة إنشائية تفي بالمتطلبات المذكورة لبناء مجمعات سكنية ومنشات خدمية. وقد تم استحداث نظام انشائي حديث لتشييد المباني تكون عناصره الانشائية مصنعة من مادة الفيروسمنت. يعد الفيروسمنت احد أنواع الخرسانة المسلحة الرقيقة يتم تسليح مونة السمنت فيه بطبقات من المشبكات السلكية ذات أقطار صغيرة نسبيا موزعة بشكل منتظم خلال المقطع العرضي. وللفيروسمنت تطبيقات واسعة وذلك لتوافر مواده الخام الأساسية في معظم البلدان. ان هذا النظام الإنشائي الحديث الذي هو أكثر اقتصاديا من الأنظمة الإنشائية الأخرى يعتمد على عناصر إنشائية مسبقة الصنع. ان التحريات المذكورة في هذا البحث تضمنت تصنيع وفحص ست عتبات بمقاطع على شكل ساقية وأربعة صفائح مصنعة جميعها من الفيروسمنت واقعين تحت تأثير أحمال عرضية. ولقد اثبتت الفحوصات من خلال قياس الانحرافات ان الفيروسمنت يمكن استخدامه بشكل فعال في تصنيع عناصر إنشائية في تشييد الأبنية. كلمات الدالة: إنشاء,هيكلي ,مواد مركبة.

Listing 1 - 10 of 166 << page
of 17
>>
Sort by
Narrow your search

Resource type

article (165)

journal (1)


Language

English (76)

Arabic (69)

Arabic and English (17)


Year
From To Submit

2019 (11)

2018 (19)

2017 (24)

2016 (17)

2015 (21)

More...