research centers


Search results: Found 4

Listing 1 - 4 of 4
Sort by

Article
Early Manufacturing Cost Estimate For Mechanical Parts

Author: Khalid Karam Abd
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2007 Volume: 25 Issue: 1 Pages: 103-116
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

In manufacturing environment cost estimates process is made in all stages ofproduct development from research to final product. Good estimatingtechniques and procedures are necessary for each manufacturing stage. Whenproperly implemented, these techniques produce acceptable operationalestimates that are useful to management for decision-making.In this research, an algorithm is developed to build system is calledFBMCE (Feature-Based Manufacturing Cost Estimate) to incorporate makingdecisions integrating design, process planning and manufacturing for costestimate purposes. The FBMCE system has been tested on product (Shaft 8E -200) in State Company for Electrical Industries and showed promising results.

عملية تخمين الكلفة في البيئة التصنيعية تمر في كل مراحل تطوير المنتج من مرحلة البحث الىمرحلة المنتج النهائي. ان تقنيات وخطوات التخمين الجيدة ضرورية في كل مراحل التصنيع.وهذه التقنيات عند تنفيذها بشكل مناسب، فانها تؤدي الى تخمين مقبول لمصاريف التشغيلوالتي تفيد باتخاذ القرارات.تخمين كلفة التصنيع بالاستناد ) FBMCE في هذا البحث تم تطوير خوارزمية لبناء نظام يدعيالى السمة) والذي طور لاتخاذ القرارات حول التكامل بين التصميم وتخطيط العملية والتصنيعفي الشركة العامة (Shaft 8E - لغرض تخمين الكلفة. تم اختبار النظام على المنتج ( 200للصناعا ت الكهربائية حيث اظهر النتائج المرجوة منه.


Article
Neural Network Application For Building Projects Cost Estimation

Authors: Ali Mohamed Humod --- Zouhair Al-Daoud
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2011 Volume: 17 Issue: 2 Pages: 331-339
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

This work presents a neural network based cost estimating method, developed for the generation of conceptual cost estimates for total building and electromechanical systems in building project, by using eight parameters available at the early design phase. This model establishes a methodology that can provide an economical and rapid means of cost estimating. Eighteen High rise building projects, built between 1996 and 2009 in Middle East countries used in this study. The performance of developed cost models was tested against costs incurred by projects not used in training of those models. Results show the mean absolute percentage errors (MAPE) are between 1.51% and 4.771% for the five networks, and the maximum/minimum deviation of the cost estimation is 10.2/0.17. These figures considered good cost estimation at the early design stage

تقدم هذه الرسالة نموذجا عمليا لتخمين الكلفة اعتمادا على تقنية غير تقليدية و هي الشبكات العصبية الاصطناعية. التي تتضمن الكلفة الكلية لبناء ألأبراج السكنية و الفندقية بالإضافة لكلف المنظومات الميكانيكية و الكهربائية, و بألإعتماد على ثمانية عناصر تصف حجم المشروع و خصائصه متوفرة في أوائل مراحل التصميم, و قد أستخدم لغرض تدريب و اختبار هذه الشبكات ثمانية عشر مشروعا حقيقيا مبنية كلها في دول الشرق ألأوسط في الفترة ما بين 1996و 2009. تعتبر الشبكات العصبية ألاصطناعية فرع من الذكاء الصناعي و تطبيقات علوم الحاسبات الحديثة, وقد استخدمت في هذا ألبحث لكفاءتها في إدارة الكلف و المعلومات للتطبيقات الهندسية و لإنها تعتمد في بنائها و تدريبها على معلومات واقعية لمشاريع حقيقية, مما أعطاها إمكانية تعميمها لتخمين كلف مشاريع جديدة. و من المعلوم إن تخمين كلف المشاريع في ألأطوار ألابتدائية ( التخطيط و التصميم ) أصبح هو العنصر المحدد و ألأساسي في اتخاذ القرارات الحاسمة في الوقت المناسب و خصوصا في ظل التنافس العالمي بين الشركات و المؤسسات العالمية و المحلية و كذلك تقليل من نسب ألأرباح المجنبة من هذه المشاريع. إن كفاءة النموذج المقدم اختبرت من خلال تطبيق معلومات لمشاريع لم تدخل في عملية تدريب الشبكات, و قد أظهرت نتائج ألاختبارات للشبكات الخمسة ما بين (1.51- 4.77)% كمعدل المطلق للنسبة المئوية للخطأ , كما إن أعلى و أقل خطأ لكل حالة على إنفراد كان (10.2 و 0.17)% على التوالي, و هي تعتبر نتائج جيدة إذا ما قورنت بالطرق التقليدية


Article
Forecasting the Final Cost of Iraqi Public School Projects Using Regression Analysis
التنبؤ بالكلفة النهائية لمشاريع المدارس العراقية الحكومية بطريقة تحليل الانحدار

Authors: Zeyad S. M. Khaled --- Qais Jawad Frayyeh --- Gafel Kareem Aswed
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2015 Volume: 33 Issue: 2 Part (A) Engineering Pages: 477-486
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

The actual final cost of public school building projects, like other construction projects, is unknown to the owner till the final account statement is prepared. An attempt to predict the final cost of such projects before work starts, using backward elimination regression analysis technique is carried out. The study covers two story (12 classes) school projects awarded by the lowest bid system. Records of (65) school projects completed during (2007-2012) are employed to develop and verify the regression model. Based on experts ‘convictions, nine factors are considered to have the most significant impact on the final cost. Hence they are used as model input parameters. These factors are; awarded bid price, average bid price, estimated cost, contractor rank, resident engineer experience, project location, number of bidders, year of contracting, and contractual project duration. It was found that the developed regression model have the ability to predict the final cost (FC) for school projects, as an output, with a very good accuracy having a correlation coefficient (R) of (93%), determination coefficient (R2)of(86.5%)and average accuracy percentage of(92.02%).

تبقى الكلفة النهائية الحقيقية لمشاريع المدارس،كغيرها من المشاريع الإنشائية، غير معروفة لرب العملحتى يتماعداد الحساباتالختامية.تم في هذا البحث استخدام تقنية تحليل الانحداربطريقة الحذف لأجل التنبؤ بالكلفة النهائية لمشاريع المدارس قبل بدء العمل بالمشروع. وقد شملت الدراسة تحليل بيانات (65) مشروع مدرسة بطابقين، ذات (12) صف، محالة بنظام الإحالة لأوطأ العطاءات. جميعها مكتملة البناء ومستلمة استلاماً نهائياً من قبل رب العمل خلال السنوات (2007-2012). وقد تم تحديد تسع عوامل اساسية مؤثرة في الكلفة النهائية لمثل هذه المشاريع، وذلك من خلال استبيان أراء ذوي الخبرة والاختصاص،وتم استخدامها كمدخلات في بناء النموذج الرياضي للتنبؤ بالكلفة النهائية.وهذه العوامل هي : سعر العطاء الفائز,ومعدل اسعار العطاءات,والكلفة التخمينية,ودرجة تصنيف المقاول,وخبرة المهندس المقيم,وموقع المشروع,وعدد المناقصين,وسنة التعاقد,ومدة التنفيذ التعاقدية.ولقد تبين من الدراسةأنالنموذج المعتمدلها القدرةعلى التنبؤبالكلفةالنهائية لمشاريع المدارس، كمخرج للنموذج،بدرجةعالية من الدقة وبمعامل ارتباط يساوي(93٪)،ومعامل تحديد يساوي(86.5٪)، ومتوسط نسبة دقة يساوي(92.02٪).


Article
Software Engineering Cost Estimation Using COCOMO II Model

Authors: Hana Rashied Ismaeel هناء رشيد اسماعيل --- Abeer Salim Jamil عبير سالم جميل
Journal: AL-MANSOUR JOURNAL مجلة المنصور ISSN: 18196489 Year: 2007 Issue: 10 Pages: 86-111
Publisher: Private Mansour college كلية المنصور الاهلية

Loading...
Loading...
Abstract

In this paper we discuss the use of COCOMO II (Constructive Cost Model ) to estimate the cost of software engineering . The COCOMO II which allow us estimate the cost, effort and scheduling when planning new software development . We use the effort equation guidance to find the number of person / months which is needed to complete the project and duration equation to specified the numbers of months which is needed to complete this project. This paper present how implemented COCOMO II model equation about the same data in different language we choose C and OOP(C++),we make the analysis of these two program and we conclude that relation between effort and duration was forward relation, we mean that when effort increasing duration will increasing in the author side.

نناقش في هذا البحث كيفية استخدام نموذج الـ COCOMO II لتخمين كلفة البرامج في مرحلة التصميم . حيث ان هذا النموذج ( COCOMO II ) يستخدم لتخمين كل من الكلفة , الجهد والوقت المطلوب لبناء البرمجيات في مرحلة التصميم وذلك من خلال تطبيق كل من معادلات الجهد ( Effort ) لحساب عدد الاشخاص على الزمن المطلوب لبناء البرنامج وايضا تطبيق معادلات الوقت (Duration ) لحساب عدد الاشهر المطلوبة لاكمال هذا البرنامج . في هذا البحث تم توضيح كيفية تطبيق نموذج الـ COCOMO II على نوعين مختلفين من البرامج الاول تم استخدام لغة الـC لبنائه والثاني تم استخدام لغـة OOP ( C++) لبنائه ، ثم بعد الانتهاء من تطبيق معادلات الـ COCOMO II على البرنامجين تم اجراء تحليل النتائج والمقارنة ما بين البرنامجين ومن ثم تم التوصل الى وجود علاقة طردية ما بين الجهد (Effort) والوقت ( Duration ) حيث انه كلما ازداد الجهد سوف يزداد الوقت في نفس الوقت .

Listing 1 - 4 of 4
Sort by
Narrow your search

Resource type

article (4)


Language

English (4)


Year
From To Submit

2015 (1)

2011 (1)

2007 (2)